February 27, 2008
.. Bonestroo
Honorable Mayor and City Council
City of Centerville, Minnesota
1880 Main Street
Centerville, MN 55038-9794
, \)\
\~. \p
1i\ \I
[\ ~ \~'J'
\j \ ;
;\X,
,
Re: 2009 Street and Utility Improvements Project
Public Open House Feedback
Bonestroo File No.: 000616-07158-0
Dear Mayor and Council:
The purpose of this letter is to outline the main issues voiced at the February 21, 2008 public open house
and possible steps the council could take to continue working with the public to reach a consensus on the
appropriate scope for the proposed 2009 Street and Utility Improvement Project.
The public open house began at 6:00 p.m. with a short presentation at 7:00. Following the presentation a
question and answer formatted discussion began. The following is our summary of the major discussion
topics from the meeting:
Q: Can't this projed wait? This is generally a bad time for burdensome assessments due to current
economic conditions.
A: If the council is committed to providing water to all its residents by 2012, the water main and
service installation portions of this project should move forward.
Additionally, D and E type improvements are being done to protect the City's investment in the
existing street subbase and bituminous base, respectively. Delaying these improvements would be
detrimental to those streets resulting in higher life cycle costs.
Type C 1 improvements could be delayed because we have determined that there is no salvage
value left in the existing bituminous or gravel subbase. Delaying these improvements does not
increase the life cycle costs as long as people are willing to tolerate their existing condition and the
City is able to maintain reasonably safe driving conditions without extensive maintenance costs.
Some Type C 1 improvement areas are imbedded in other improvement classifications. Delaying
these few areas would necessitate driving heavy trucks and other construction equipment across
the other improvements when the Type C1 work is completed in the future. For this reason and
for the general continuity of the project, we would recommend that these "imbedded" areas of
Type C 1 improvements remain in the scope of work for 2009. This is shown graphically on the
attached figures.
City of Centervil/e
2009 Street and Utility Improvements Project
Page 2
February 27, 2008
Some residents indicated that they would be less opposed to the project with different timing. The
City could consider a short (1-5 year) deferment of their assessments. This may be possible if a
bond could be structured such that payments could be city-paid for the first few years, and
assessment funded towards the end of the bond. This would allow the residents to effectively
"ride-out" fluctuations in the economy and begin payments at a later date when economic
conditions may be more favorable.
Q: Is an $8 million project irresponsible for a town this size, especially at this time?
A: If the recommendations presented herein are followed, the remaining project is estimated at $6.6
million a difference of approximately $1.3 million. Much of that reduction would be City
participation items. Since no water main would be eliminated (assessed at 100%), and most of
the work eliminated would be road work (assessed at a much lower percentage), this would
significantly cut the City's portion of the project costs. It would be our recommendation to plan for
the work eliminated from this project for construction in 2014.
Q: Our street is in decent condition,' does it need these improvements right now?
A: As stated above, we feel strongly that Type D and E improvements are time sensitive and are
needed now to avoid further deterioration of the street. Type C improvements, because they
cannot get any worse, could wait as long as residents will tolerate their existing condition and the
City is able to maintain reasonably safe driving conditions without extensive maintenance costs.
Q: Can other Type B improvement areas (Mill Rd N of Prairie Dr., Robin In. Area, Clearwater Dr.,
Peltier If<. Dr.) consider alternative water main installation techniques (boulevard, back yards,
directional drilling) to avoid ripping up a decent street as was considered on Center St?
A: Mill Road, North of Prairie Drive - We still feel strongly that this section of roadway should be
urban section (curb). However, if the water main was installed in the boulevard, the street
subbase could be salvaged, perhaps decreasing the costs in this area. The section could then
be classified as a D3 Type improvement.
Robin Lane Area - Members of the public suggested installing the water main down the rear
yard lot lines. Several issues are raised by this suggestion:
. Construction easements would need to be obtained from all residents since the backyard
easements are a total of only ten feet wide.
. A number of fences and mature trees would have to be removed.
. The risk of a water main break flooding a home would need to be considered.
. The City would have to strictly enforce the easement restrictions, ensuring nothing is
planted or constructed within the easement.
. Winter access may be problematic in the event of a water main break since the area
would not be plowed.
This decision should be carefully considered and made in close consultation with the Public Works
Staff. We would not recommend changing the scope of work in this area.
Clearwater Drive - Originally, it was the desire of the Public Works Department to reduce the
size of this cul-de-sac in an effort to minimize maintenance costs and to reduce runoff. Coupled
with the addition of water main, this necessitated reconstruction of the roadway. Several residents
of this area are opposed to changes in the size of the cul-de-sac. If the cul-de-sac was not
City of Centerville
2009 Street and Utility Improvements Project
Page 3
February 27, 2008
changed, the water main may be able to be directionally drilled and services tapped out of one
access point in the center of the sac. This style of water main installation may allow the street to
forego reconstruction. This could be changed to a Type A 1 improvement.
Peltier Lake Drive (CSAH 14 to Centerville Road) - This area has a narrower right-of-way
(50' vs. 60' or 66') and steeper boulevards necessitating the water main to be installed in the
roadway. Additionally, we feel strongly about the need for the reconstruction of this roadway with
a standard City section including curb and gutter due to its poor condition. We feel that this need
for reconstruction is independent of the water main installation. We would not recommend
changing the scope of work in this area.
Peltier Lake Drive (Between Peltier Circle) - This area has a 60-foot right-of-way allowing
the water main to be installed in the boulevard. However, we feel strongly about the need for the
reconstruction of this roadway with a standard City section including curb and gutter due to its
poor condition. We feel that this need for reconstruction is independent of the water main
installation. We would not recommend changing the scope of work in this area.
Peltier Lake Drive (Centerville Road to Mill Road excluding area between Peltier
Circle) and Centerville Road (North of development break) - This area was previously
included within the C 1 improvement type. These are small areas that require a full reconstruction
with new curb and gutter due to their deteriorating condition. Water main already exists in these
areas. For clarification purposes another Type B improvement category could be created for further
distinction and more accurate costs. This could be then be classified as a B2
improvement.
Q: Could the scope of our road improvements be reconsidered? Can we meet with the engineer to
discuss our street's proposed improvements?
A: We stand behind our recommendations with regard to the scope of work needed on streets not
affected by water main work. As discussed above, the timing of some of the improvements could
be reconsidered. The Council should consider authorizing meetings between engineering staff and
residents on a per street basis in order to address outstanding concerns about specific street
improvements.
Q: Can the City hire another engineering firm to look at Bonestroo's recommendations?
A: The City paid $10,000 to Braun Intertec to take soil borings and produce a signed engineering
report complete with recommended street sections. Those recommendations align with
Bonestroo's recommendations.
Q: Why are some people allowed to wait until 20 12 to hook to City water while we are being forced
to do so by 2010?
A: City ordinance identifies two requirements for the City water system.
1. All residents must be connected by 2012.
2. Residents must connect within one year of water service being made available to them.
The City could consider enforcing the 2012 connection year in order to maintain enforcement
consistency throughout the City.
.'
City of Centerville
2009 Street and Utility Improvements Project
Page 4
February 27,2008
Q: Is it fair to force me to abandon my we/I while others in town may keep theirs?
A: Currently, all well abandonment costs associated with the project are separate, elective costs to
residents. The City is requiring that all wells within the DWSMA be abandoned. The City Council
could consider participating in these costs or paying the entire cost of abandonment.
The following is a summary of our recommendations:
1. Move forward with Types A, B, D & E improvements in 2009.
2. Consider Bond structure allowing short assessment deferment.
3. Delay Type C1 improvements (except those areas imbedded in other improvements) until 2014.
4. Reduce overall project costs by delaying some Type C1 improvements and revising the work scope
by changing the water main installation locations as follows (see attached map):
a. Type B to D3
o Mill Road (North of Prairie Drive)
b. Type B to A1
o Clearwater Drive
5. Schedule meetings between engineer and public on various streets.
6. Delay hook-up requirement to 2012
7. Do not assess well abandonment costs or participate in the cost.
If the City Council would like to move forward with any of the aforementioned changes to the scope of the
project, it would be appropriate to order further revisions to the Feasibility Report.
Sincerely,
BONESTROO
~,./ ~
Mark Statz, PE
City Engineer
651-604-4709
cc: Dallas Larson, City Administrator
Paul Palzer, Public Works Director
Emily Maloney, Bonestroo
Ryan Goodman, Bonestroo
OOJlSauog
4-
Z 3C1n~)I.:I
I'"
II IT ?JU LlJbI!2~ ~~LLLJ-l--\: nlT~f)~!= V-:'
\ - IQ mtrnl ~[j~, I ''L - r-
-- \ \ * /~ I * ~fYti-J: ~ y -> ::~III ra&
~ * 7\ .-i~ -I 'j( 0-I~~\ \qfr-~D 3~ I ~
~i //7 T\\I~= I .-. -'-r ~ ~i I ~Jj~
~ ~ (8Y ~~.~J -~ V
I i -J~I~~ <l lr~:1d~ "ir ~ ~ l 7/
I rIH-~~~\~ _;. ~'\ I I /1
f--. ..... ~.;-L ^\.>V ,~ .~u I..)'::"'", 1. . I '/1<$1
~ t-"'-VJ<\[t~~" / ~I
\" (/" ~ \1Sl ITJTIBIP B f I ~
r ',--- _I.~~ \~/ ~'.b9695[B~ f
T:~ i--~\JU ~Y-~ ~11:"'1 ~
L/ - .-~ ~ ~\LLJllJ I '_..
--cf-- ~ I e- I,~ I Ll=J ~
I . - ,- - - ---< L~= I' ~- -':'T-~-\f~J
r- \. .' I -. i= - - -j - I I \
EfEft'itr~ :"'~ ~ \ -=-rn- ~ = ~ --.~f \
ffiBtP ,ClIC L.!ID - \ -F.- i ij I I I 'jT--= \
~~ u.J. ~ f- 1"l-rJ f- ~~ -i ~
Q5'l~.~ =P~ltl" L I ~ I, 1 /:=: hY\\\-\ -i ~
b 1 _' 11l= -- -~ ,,~'-'" ~J!~'';:J ~/,. ~ ~
o -Ilr-l'~ 1:: IS>-!;. 'il rTTii -flII I ~ & ~ lJ--'fl l
... /,-AI~l-L_ ,L~ I II i I I nl . \ /Tfi ~ \ I I' ..ut'"m
- 11= 1DUCIlCl ~-/ ~
; T ~ ~ ,t=~~~Pffmfj~ .~~t Wi ~
: R!4~ ___F"l--L-l [7D&'~ l-- ;\ T ,dL-
o i ~ ;c-- k/" , '
~ !~ It:: v i-I -~1 i~\ \~_...) -ru
:: ~I ~ -/, ~\
I~I."'"
Od
.~
\ Ll ~I \_
=
1 3 cJ
H 3 I j
BSI-LO-919 :ViViO:)
BO/9Z/Z:3.L'cia 9Ma'60oz-Z00~BSIL0919
D3rOCld J..N3W3^OCldWI AJ..IlIJ..n ON'v' J..33C1J..S 600Z
3llI^C13J..N3:J .:10 A1J:J
S.lN3W3^O~dWI a3S0dO~d 600Z
IN3ViSS3SSSV NIVVi
~3i "1M .:10 n3n NI 03nddV 38 111M ~~VH::> NOLl::>3NNO::>.
V3~ IN3ra>VNVri ^ lddns ~ "1M ~NI)lNI~a
)':~V^ 111M IN3riSS3SSV
S~IVd3~ lOdS 8~n::> HlIM ^V1~~O ~ l11Vi ~03 -3
3lLlNIV~a ~ 'S30IA~3S 'ViM HlIM ~~ "118 l1n.:1 -~a
3lLlNIV~a ~ S3::>IMI3S HlIM ~~ "118 11n.:1 -.za
3lLlNIV~a ~ S~lVd3~ lOdS 8~n::> HlIM ~~~ '118 11n.:1 -~a
3l11NIV~a ~ S~IVd3~ lOdS 8~no 'riM HlIM NO::>3~ Hld3a 11n.:1 -Z::>
31LlNlv~a ~ S~IVd3~ lOdS 8~n::> NO::>3~ Hld3a 11n.:1 -!.::>
3lLlNIV~a ~ 8~n::> M3N HlIM NO::>3~ 11n.:1 -Z8
31LlNlv~a ~ 8~n::> NaN 'S3::>,^~3S 'riM HlIM NO::>3~ lln.:l -~8
^1NO NOLlV1lV1SNI 3::>,^~3S -.zv
S3::>,^~3S HlIM NOISN3lX3 NIVri ~31VM -LV
~VM A.lO HlIM (]3,\~3S ^l1N3~~ro 10N 13::>~Vd
03S0dO~d S3::>1A~3S ~31 "1M M3N .:10 ~38rmN
>I1VM3alS 3l3~::>NO::> ~NlISIX3
l1VW. SnONlrinll8 ~NLlSIX3
>rWM301S 3l3~::>NO::> a3S0dO~d
HlVd SnoNlriru.18 03S0dO~d
O~d
l
N
t-I~
11~~3J.
3)1..[1 3
j
'"
.. -
~
*
-
-
-
-
-
-
-
-
CJ
ClJ
--
-
--
-
OOJlSauog
4-
lIT
l 3'tln:)I.:I
Sl.N3W3^OCldWI 03S0dOCld 17102:
lDIIa _
.."
1'T.aoI1. ___
SS1-LO-919 :ViViO~
SO/S1/l:3J:va ~Ma.l1Ol-l00:lSS1L0919
D3rO'tld l.N3W3^O'tldWI MIlIl.n ONV' l.33'tll.S 600l
3111^'tl3l.N3:) .:10 MI:)
31l1NIV~O 'V S~IVd3~ lOdS 8~~ HlIM NO:l3~ H.1d30 lln..:1 -~:l _
>llVM301S 3l3~:lNO:l ~NlISIX3 --
llVlli SnONlVinLI8 ~Nl1SIX3 -
I
OOt~
laa~ u! aID:lS
I
OOL 0