Loading...
HomeMy WebLinkAbout2008-06-04 P & R Packet CITY OF CENTERVILLE PARKS AND RECREATION AGENDA Wednesday, June 4, 2008 - 6:30 P.M. I. CALL TO ORDER 1. Roll Call II. SET AGENDA III. APPEARANCES 1. Mr. Mark Statz, City Engineer - Hidden Spring Park IV. CONSIDERATION OF MINUTES 1. May 7, 2008 Parks and Recreation Committee . Meeting Minutes V. COMMITTEE BUSINESS 1. Battle of the BandsIBoards - Ollie & Company 2. Theft/V andalism at Wheels Skate Park 3. Trail Portion of 2009 Street Project VI. UPDATES 1. Tracie McBride Memorial Park Renovations 2. Fete des Lacs 2009 Centerville Lake Walk/Run VII. ADJOURNMENT Page 1 of2 Kim Stephan Statz, Mark R [Mark.Statz@bonestroo.com] Wednesday, May 14, 20082:08 PM gregg@metroswcd.org PPalzer@Centervil/emn.com; Tom Lee; Kevin Amundsen; Seeley Suzanne; McDowell, Jeff J; dlarson@centervillemn.com; kstephan@centervillemn.com Subject: FW: Centervil/e Rain Garden Attachments: DSC03789.JPG; DSC03822.JPG From: Sent: To: Cc: Gregg, Thanks for taking the time to do your test. We'll take a look at what we can do for the two isolated areas to make them drain out. We still intend to do a structured test of the drain down time by filling the garden with the nearby hydrant and monitoring its draw-down. We just need to find a 2 day stretch without rain in the forcast. Mark Statz, PE Associate Tel 651-604-4709 Cell 651-775-5126 mark.statz@bonestroo.com . Bonestroo From: Gregg Thompson [mailto:metroswcd@isd.net] Sent: Tuesday, May 13, 20085:56 PM To: Statz, Mark R Cc: thompson, gregg Subject: Re: Centerville Rain Garden Mark, Yes. I did the compaction test on Friday. The soil-compaction meter I have is a 30" long probe. I was able to sink the probe all the way (staying within acceptable compaction limits) throughout most of the raingarden area, with the exception of the area just beyond the rock at the inlet and the area immediately before the outlet. I'm attaching two photos of the raingarden from this past Friday - photo 3789 shows the soil-penetrometer. Photo 3822 shows the rock inlet I sediment-trap area still ponding water (I don't know when the last substantial rain- event was in Centerville that filled this area). If the inlet area has continuous ponding, this would be cause for some concern regarding mosquito-production, if it continues to hold water as we go into mosquito-season. The inlet may need more monitoring to see if it dries out, and how long that takes after a substantial rain-event. Do you know if anyone has monitored the period of time it takes for the raingarden's above-ground ponding area to dry after a substantial rain-event, since we had met on-site when the soils were still frozen? Hope this helps. Also, I'm going to phase out this email account very soon - have switched to: gregg@metroswcd.org - so please update your address book. 5/30/2008 ,~ .' '-~..s-] lr.::r-..:~~ ~.:~~~" ' ~_~. . . ' .. kw~~~&~~.l~~ iW!.~~ ,;";"..,,,",~... ,/ "'" < "";;- '.. '" ,e.,. ~." ,., f~'" .< <'--"< ,/, -'< C', ", ..,'.. ~w,,'''''' .. ..' , .,., '^ .' .. " ,"HZ:',.>"," ,-,," '... ," ',' ..., ,...,.. - -. ,. y ~ "..'" " ___~d~~~a ~ .... .~V .......;:t .~,,","" ~ ~ '.~" - to', l cU' .f..:. .'-'"::;:.... _..._......~ ' .' _ ..,' ~.' }">-'- .'. 3",. ...... ~ - ,~.-:-~ .. L_ f'~t~~~~:4f"'~'-"" ...\ ..........~ ... ~...__. ~....~~.~ L,,~ .&J'J II: [ ~ Page 1 of 1 Kim Stephan From: Statz, Mark R [Mark.Statz@bonestroo.com] Sent: Friday, May 16, 200811:08AM To: kstephan@centervillemn.com; Kevin Amundsen; Seeley Suzanne; Tom Lee Cc: dlarson@centervillemn.com; PPalzer@Centervillemn.com; McDowell, Jeff J; Smyth, John R Subject: Hidden Spring Park All, I thought I should drop you a line to update you on our schedule. I think, originally, at the Parks Board meeting last week, I had said we would be on-site on the 19th. At that point, I thought that we would be doing the work with our own crews. Since that time, my folks have shied away from doing it ourselves because it will involve heavy equipment. The design calls for the rock gabion to be "notched" into the lake bed which will require a backhoe. I have spoken with two contractors recommended by Gregg Thompson and they are in the process of getting me quotes. I hope to have those quotes by later today or early next week. We will quickly make a decision on which contractor to use and try to get them on site as rapidly as possible. I apologize for making the promise of a schedule I am now not keeping. As soon as we have a contractor on board and they give me their schedule, I will update everyone again. Again, thank you for your patience and please feel free to call me with any questions. Mark Statz, PE Associate Tel 651-604-4709 Cell 651-775-5126 mark.statz@bonestroo.com . Bonestroo 2335 Highway 36 W St. Paul, MN 55113 Tel 651-636-4600 Fax 651-636-1311 www.bonestroo.com CONFIDENTIAUTY NOTICE: The information contained in this e-mail communication and any attached documentation may be privileged, confidential or otherwise protected from disclosure and Is Intended only for the use of the designated reclpient(s). It is not intended for transmission to, or receipt by, any unauthorized person. The use, distribution, transmittal or re-transmlttal by an unintended recipient of this communication is strictly prohibited without our express approval In writing or bye-mail. If you are not the intended recipient of this e-mail, please delete It from your system without copying it and notify the above sender so that our e-mail address may be corrected. Receipt by anyone other than the Intended recipient Is not a waiver of any attorney-client or work-product privilege. This email has been scanned by the MessageLabs Email Security System. For more information please visit http://www.messagelabs.comlemail 5/30/2008 tffj/.,P E I W _",._n !.yt... iz.!.yd 5,1"". DATE: SUBMITTED TO: ATTENTION: PROJECT: LOCATION: BID DATE: PROPOSAL: INCLUSIONS: EXCLUSIONS: ESTIMATOR: SMART PAVING SMART LANDSCAPING SMART LAKES & STREAMS SMART DESIGN & PLANNING May 23, 2008 Bonestroo Mark Statz, PE City of Centerville - Lakeshore Stabilization Hidden Springs Park Centerville, MN Open Based on the design prepared by the Anoka Conservation District to stabilize 225 linear feet of shoreline on Centerville Lake, we will complete the work for Thirty Three Thousand Four Hundred Thirty Seven Dollars ($ 33.437.00). 11.5 gauge chain link fence 6' height and ties to cinch mesh together Large landscape rock (3-6") for gabions 10 foot Biologs (23) Geosynthetics (as specified) Dead branch bundles (primarily cedar will be used) Eco stakes for branch bundles Native plugs (plugs only, as specified) Native plantings (pots) Damage to the existing landscape (note: precautions will be taken to prevent damage to the existing plantings, but we cannot guarantee their survival due to equipment access and replanting). Stacy Anderson iJilatural Shore Technologies, Inc. "II.' www.NaturaIShore.com ~,~ l ~275 FagenkopfKoad, Maple Flain, MN 55359 612-703-758 I 27 May 2008 RE: Centerville Lake Project Bid Hello Mark- Below is a breakdown for the Centerville Lake Park Shoreland Restoration Project. As we discussed with Gregg on site, it makes sense to conduct the restoration during summer low water. The rock gabions should be set approximately 12" below the lake bottom substrate. In order to do this, it would be most efficient to have the substrate exposed when conducting this excavation. I also talked to Gregg about using gabions that are 3'x3' in dimension. This would allow for stability and also allow a portion of the gabion to be set above the NWL. Plants associated with the restoration will have ample time to establish. The quoted price is for 220' of shoreland. We have itemized a list of materials that we typically use in projects like these. We have also included maintenance in the bid - if you would like for us to monitor and weed the site. Project Elements Project Management, Mobilization Site preparation, excavation, soil, gab ion placement Plants and seed Erosion Control Materials - gabion boxes, rock, biologs, fabric Maintenance TOTAL = $2,000 $6,540 $3,193.00 $14,635.00 $960.00 $27,328.00 List of Materials and Services Erosion control blanket - NAG C-350, NAG SC150-BN Rock - limestone - 3" to 6" - 73 CY Gabion baskets - 3' x 3' Soil (to fin behind baskets) - 30 CY Biologs - 16" heavy duty #9 Plant - 3" container (these do much better than 2" in this situation) Custom native plant seed mix for behind the gabions - for quick cover - plants will be planted through EC blanket. Maintenance - performed by college graduates trained in ecological restoration Another advantage with using our company is that Rob Langer, a co-owner of Natural Shores Inc., will be on site at all steps of the project guiding the installation. Our company prides itself in specializing with all aspects of shoreland restoration. We are the only company in Minnesota that focuses on this sort of ecological restoration. Thanks again for the opportunity to work with you. Please call if you have any questions concerning this bid. Best Regards, William M. Bartodziej Restoration Ecologist, M.S. Re: Centerville bid letter Kim Stephan From: bill.b [bill.b@naturalshore.com] Sent: Thursday, May 29,200812:31 PM To: Statz, Mark R Cc: haley.e@naturalshore.com; gregg@metroswcd.org; Smyth, John R; McDowell, Jeff J; rob Subject: Re: Centerville bid letter Hi Mark- The dogwoods are not included. I did not see this itemized on Gregg's spreadsheet. We like to use bare root material, and this would run $2.50 for a 3' shrub, installed. It is a great deal, much better than the bare root material. But if you would like for us to use bare root, we can do that. It would be the same price per stem. I did discuss the 3'x3' gabions with Gregg, and he was o.k. with us including this in the bid. If the larger gabions are used, it may make sense to drop the brush bundles. Gregg, do you have a preference? TRM was not included around the logs. We did include it behind the logs in a 6' strip. If the logs are set behind the gabions, then the wrap may not be needed. Gregg, again, this is up to you. Yes, the plant list is great, and we plan to use this as guidance in the project. Bill Statz, Mark R writes: > Bill, > > A couple of questions on your proposal: > > 1. I don't see dogwood live-stakes. If you look closely at Gregg > Thompson's design, he had a note that said to use dogwood live-stakes in > the area with the trees. > 2. The 3x3 gabion uses almost 4 times as much rock as Gregg's > design. Please discuss the need for this large of a gabion with Gregg. > 3. Gregg called out TRM around the biolog. Please conftrm whether > or not this is in your proposal. > 4. Gregg was very speciftc with the types of plants to be used > (speciftcally "seges") when talking with the parks board. They will > expect us to do exactly what Gregg has proposed. > > Could you please address some of these issues? Thanks, 5/30/2008 Page 1 of2 Parks & Recreation Committee Meeting Minutes May 7, 2008 PARKS AND RECREATION COMMITTEE MEETING MINUTES Wednesday, May 7, 2008 - 6:00 p.m. Pursuant to due call and notice thereof, the Parks & Recreation Committee of the City of Centerville held the regularly scheduled Wednesday, May 7, 2008 meeting at City Hall, 1880 Main Street. Present: Chairperson Suzanne Seeley Vice-Chairperson Kevin Amundsen Committee Member Lori Harris Committee Member Patrick Branch Committee Member Mark Haiden Committee Member Savannah Lee M[Ji)@~~[[@W@@] Absent: Committee Member Kevin Selander Council: Council Liaison Tom Lee Staff: Staff Liaison Kim Stephan Mr. Paul Palzer, Public Works Director I. CALL TO ORDER 1. Roll Call Chairperson Seeley called the May 7, 2008 Parks & Recreation Committee Meeting to order at 6:36 p.m. II. SET AGENDA Chairperson Seeley requested adding Mr. Lynn Johnson under appearances to discuss the proposal for the Centerville Lions to erect a building in Laurie LaMotte Memorial Park. Mr. Paul Palzer requested adding Mr. Andy Ross, also under appearances, to discuss the cement coloring and reQ,ovations at Tracie McBride Memorial Park. Motion was made by Vice-Chairperson Amundsen, seconded by Committee Member Branch to set the agenda as presented with the above additions. All in favor. Motion carried unanimously. III. APPEARANCES Mr. Lvnn Johnson. Centerville Lions lof6 L Parks & Recreation Committee Meeting Minutes May 7, 2008 Mr. Lynn Johnson, Centerville Lions, requested to be on the agenda to discuss a proposal that the Parks & Recreation Committee donate a parcel of land at Laurie LaMotte Memorial Park for the Centerville Lions to build a building on. With the moving of the Public Works to a new building, the Centerville Lions no longer have a place to store their trailers and will lose the storage building at the old site. Mr. Johnson said in talking to Mr. Palzer, he said he didn't think there would be a problem storing the trailers on the new site, but there would not be a storage building available. The proposed building would have a garage to store the Lion's equipment, a meeting room, rest rooms and a kitchen. Mr. Johnson stated the meeting room could be used for many different things, such as committee and commission meetings, Boy Scouts, Girl Scouts and any other clubs or organizations in Centerville that would like to use it. At this time the only place in the City of Centerville for clubs or organizations to meet is the St. Genevieve's Parish Center. The parcel being requested is in the northeast-southeast part of Laurie LaMotte Memorial Park because of the access to water and electrical, as well as access to the trail and Centerville Road. Council Member Lee stated that while in theory this was a great idea for the community, he had checked with the City Attorney and it is not possible for the City to donate public property to a private organization, so even if the committee desired to make this recommendation to the City Council, it is not legally possible. The only way this could be done would be for the Lions to donate the money to the City and the City build, and own, the building. It was discussed whether there was other City owned property available for such a purpose and while there may be, the City also cannot donate property or sell property for less than it is worth. Mr. Andrew Ross I Tracie McBride Memorial Park Renovations Mr. Andrew Ross was present, at Mr. Palzer's request, to discuss the renovations at Tracie McBride Memorial Park, as well as have the committee select a color and product for the cement. Mr. Ross is the contractor hired to perform the work at the park. There are different options available to color cement. The committee had originally discussed having a product added to the cement mixture which goes completely through the cement so if any chipping were to occur in the future the cement would all be the same color. This option is expensive and the price goes up considerably to get a darker color, for instance a light tan is not as difficult to obtain as a primary red or a blue. Mr. Ross recommended a stain product which is applied after the cement is cured and is more cost efficient and easy to repair if it chips later. It is a penetrating stain that also seals and the colors created with stain are far superior to fully colored cement. The playground equipment is primary contrasting colors The committee discussed the options and decided the stain is more economical and would be able to achieve a more pleasing color. The committee selected a primary blue and Mr. Ross will also paint all the posts the same blue to match the cement. Mr. Ross is coordinating his preparation of the site with Game Time's installation of the equipment and the project should be completed by the middle of June. The park will have to be shut down for a few days. In an effort to make the pump house look more appealing a false window with shutters was added. Council Member Lee brought up his concern with it being an area vandals would fmd enticing. Mr. Palzer, Mr. Larson and Mr. Ross discussed the option of removing the window, but because the siding would have to be removed and redone, the cost estimate for a redo would be about $1,000. The committee opted to leave it and see what happens, if it is vandalized it will be done different next time. 20f6 Parks & Recreation Committee Meeting Minutes May 7, 2008 Committee Member Harris mentioned it is muddy under the drinking fountain to which Mr. Ross replied that area is not yet completed and since it needs to be ADA accessible, it has to have asphalt or stepping stones of some kind underneath it to meet the requirements. Mr. Mark Sta~ Citv Emrineer - Hidden Sprine: Park Mr. Mark Statz, City Engineer made an appearance to update the committee on the status of the work to be completed at Hidden Spring Park and to discuss options for the shoreline stabilization. Included in the packet was a proposal from Mr. Gregg Thompson, Urban Conservation Specialist, for the shoreline stabilization project. Mr. Statz talked to Mr. Gregg Thompson regarding the soil compaction test Mr. Thompson was going to do on the rain garden and thought it would be done yet this week. The rain garden is currently dry and some plants are coming up. Mr. Statz would like to give it a few more weeks to determine what is yet to come up before the plantings are replaced which did not survive the winter. The recycled materials for the glider bench have been ordered by Bonestroo, at no cost to the City, and will be replaced when the parts arrive. Mr. Paul Palzer, Public Works Director, was also in attendance and reported the artesian well was turned on today and is running full force. The water table is probably up and the well has been filling up for 6 months while it was turned off, so it is not possible to say what this means for future water pressure from the well. Mr. Statz said one of the water falls will be adjusted, as the water is flowing behind the rocks instead of over them. Chairperson Seeley questioned whether the divots in the asphalt trails will be repaired which were damaged by equipment. Mr. Statz replied that they would be repaired. Mr. Statz stated he expected all the work to be completed by the end of May, except for the shoreline restoration, which is a lengthier process. Mr. Statz informed the committee that in reviewing the lakeshore stabilization plan from Mr. Gregg Thompson, he has a few concerns with the design plan proposed by Mr. Thompson. The committee discussed the various ideas, benefits and the possible problems with each. Mr. Statz stated that he is concerned that Mr. Thompson's proposal may not be durable enough to work and Bonestroo would be held responsible when it was not the plan Mr. Statz had recommended. Bonestroo does not want to warranty the work if it is not done the way Bonestroo has proposed with rip rap boulders and live dogwood stakes. The committee is hesitant to use dogwood or willow as they do not want to obstruct the view of the lake and they feel rip rap is not the environmentally friendly way to show lake shore owners how to best preserve the lakeshore. Mr. Thompson's proposal has some dogwood, but uses a variety of other lakeshore stabilization methods which the committee would like to try before resorting to rip rap. The committee ultimately agreed that it would be best to get whatever plantings in that will maintain the shoreline in the best way possible, as soon as possible, and shrubs can always be removed or cut back later if they become intrusive. Mr. Statz has full confidence that the rip rap will work and stabilize the shoreline, but stated Bonestroo is also willing to go ahead and fully implement Mr. Thompson's plan if that is the Committee/Council's desire. The committee and Mr. Statz also felt that if we start to see failure, we can step in before we lose too much and go to the rip rap plan as a backup at a later time. Motion was made by Chairperson Seeley, seconded by Vice-Chairpenon Amundsen, to recommend City Council support the lake shore stabilization pian submitted by Mr. Gregg Thompson, keeping the lakeshore as natural and environmentally friendly as possible. All in favor. Motion carried unanimously. 30f6 Parks & Recreation Committee Meeting Minutes May 7, 2008 IV. CONSIDERATION OF MINUTES March 2. 2008 Parks and Recreation Committee Meetine: Minutes Motion was made by Committee Member Haiden, seconded by Vice-Chairperson Amundsen, to approve the April 2, 2008 Parks & Recreation Committee Meeting Minutes as is. All in favor. Motion carried unanimously. v. COMMITTEE BUSINESS Proposal to SpOnsor a WalklRun Around Centerville Lake for the Puroose ofStimulatine: Community Awareness in Centerville's Recreation Opportunities. SUPpOrtine: Centerville Businesses and Raisine: Parks & Recreation Fundine: Committee Member Branch submitted a proposal to the committee to consider sponsoring a run around Centerville Lake possibly in conjunction with Fete des Lacs as a fund raiser for the Parks & Recreation Committee. Committee Member Branch has done some preliminary research and because there is a lot of organization and planning involved, this would be an event for 2009, possibly during Fete des Lacs. The committee discussed the plan and was unanimously in favor of proceeding with the research to see what would be involved. Funding will be required up front, but should be able to be recouped with the run itself. Committee Member Branch will contact running organizations to determine how to proceed and report back to the committee. Eventually a subcommittee will be formed. Potential Summer Music Proe:ram in Centerville Submitted bv Mr. Fred Bailev Mr. Bailey sent information to the committee regarding two music groups he is involved with that are active in the Twin City Metro area and would be interested in participating in any Centerville summer music programs. Mr. Bailey's descriptions of the groups are as follows: 1) The Men In Black acappella vocal group (5 men). We do an eclectic mix of doo-wop, early rock and spirituals. We have performed publicly for more than 15 years. Our local performances include: Como Park Pavilion, Como Park Conservatory, Hazelden and numerous other public and private events throughout the north metro area. We have a demo CD that we would be pleased to send. 2) The White Bear Big Band: a 17 piece big band with a full repertoire of swing and jazz standard. We have performed for numerous public and private events in the north metro area. Our appearances have included regular Swing Dance performances at the NE Family YMCA, spring dances for the White Bear Lake Historical Society and private parties for retirees groups. We would be happy to provide references. While the committee has discussed offering a variety of music in the parks and are excited with the idea, they do not feel they have the time or the ability to take on another project this year. Hidden Spring and Tracie McBride Memorial Parks are still in various stages of renovation, CSAH 14 will be under construction, and the event the committee is currently working on is the Battle of the BandslBattle of the Boards for both June and Fete des Lacs. The committee would like to revisit this next winter and possibly use Mr. Bailey's band(s) in conjunction with the Fete des Lacs Run in 2009. 40f6 Parks & Recreation Committee Meeting Minutes May 7, 2008 Ollie & Companv. June Event Plannine: Committee Member Lee designed the flyer for the event and distributed copies at the Centennial High School. The same design will be used for the T-shirts which will be done in black and white. Colored shirts will be done for the Judges and Parks & Recreation Committee Members. The event will be held June 14,2008 from 1 to 5. There was some discussion as to how to select judges and it was suggested Ollie & Company be contacted to see if their staff would consider judging the bands as they would be neutral. Details of this event will be discussed at the June committee meeting. VI. UPDATES Tracie McBride Memorial Park Renovations Tracie McBride Memorial Park was discussed under appearances, but a few additional comments were made at this point in the meeting. Mr. Patzer explained where the drain tile is to be placed on the north side of the play structure, with the possibility of extending it in the future to the area where the tennis courts may be located. Mr. Patzer asked the committee what they would like to do with the sand area and did the committee want to just resod behind the pump house? The committee would like to see class 5 added and rolled behind the pump house to create an area for a picnic table(s). In regards to the sand the committee would like to see a sandbox area added between the pump house and the play structure using existing sand and extending the concrete border to include this area with the shovel that was previously removed installed in the sandbox. If cost is prohibitive then sod the area. Motion was made by Committee Member Harris, seconded by Chairperson Seeley to recommend Mr. Palzer authorize Mr. Ross, the contractor for Tracie McBride Memorial Park Renovations, to add a sandbox between the pump house and the play ground area using existing sand and shovel and request it be surrounded by extending the concrete border if this fits into the budget. All in favor. Motion passed unanimously. Committee Member Harris questioned whether the bubble panel on the play structure was being replaced as it is in such a visible place and it is scratched and worn. She would like to see it replaced with some type of play panel. Mr. Patzer said he would look into it and have staff order a new panel. Earth Dav Cleanup April19t1t - Review During the Earth Day Cleanup of the parks it was discovered that the wooded pine tree area of Eagle Park has been used for a 'hangout' for kids. An assortment of furniture, probable drug paraphernalia, bottles, cigarette butts, etc. was removed from a secluded area behind the trees, off of the trail. Residents have complained of hearing voices while walking the trail and not feeling safe in this park or on this trail. The committee would like to ultimately remove some trees, but for the short te~ trim up the tress approximately 2-3' from the ground opening the area up to be more visible to both the residents and the police. Vice-Chairperson Amundsen has volunteered to do the work and the question to City Council and City Attorney is would there be liability to the City to have a volunteer perform this work or does the work have to be done by Public Works Staff? This will be forwarded for City Council's consideration at the May 14,2008 City Council Meeting. 50f6 Parks & Recreation Committee Meeting Minutes May 7, 2008 The committee also discussed recent vandalism at some of the parks; a slide was broken and had to be removed at Royal Meadows Park and a rail was stolen and graffiti spray painted at Wheels Skate Park. The equipment will be replaced. The police are looking for information as to the theft and vandalism, but have no leads at this time. YMCA Summer Prolmlm - UDdate from Ms. Liz Guimont The following update is from Ms. Liz Guimont: Centerville Park Play Days registration is looking great. It is definitely a GO for this summer! We haven't had much response for the Skate Park, but we'll keep our eye on it and keep you updated I was wondering if there is an indoor space where we might be able to keep a few supplies in. I know there was a warming house we had used before, could we get a key for that again? Just let me know any specifics about the park and anything else you need from us. I have copied Kate Bronson on this email; she will be the main contact over the summer. Thanks so much for collaborating with us and I'm very excitedfor the program to start! VIII. ADJOURNMENT Motion was made by Chairperson Seeley, seconded by Vice-Chairperson Amundsen to adjourn the May 7, 2008 Parks & Recreation Committee Meeting at 8:57 p.m. All in favor. Motion passed unanimously. Transcribed by Kim Stephan 60f6 - -- - -- [I] c::::::J - - - - - - 1_ - - * ....... I I-A~~ ~~Vl\.l-~ C~t'l N PROPOSED BllUMINOUS PATH PROPOSED CONCRETE SIDEWALK EXISTING BllUMINOUS "TRAIL EXISITNG CONCRETE SIDEWALK NUMBER OF NEW WATER SERVICES PROPOSED PARCEL NOT CURRENTLY SERVED WITH CITY WATER A1- WATER MAIN EXTENSION WITH SERVICES A2*- SERVICE INSTALLATION ONLY B1- FULL RECON WITH wt.4. SERVICES, NEW CURB & DRAIN TILE B2- FULL RECON WITH NEW CURB & DRAINTILE C1- FULL DEPTH RECON CURB SPOT REPAIRS & DRAINTILE C2- FULL DEPTH RECON WITH wt.4, CURB SPOT REPAIRS & DRAINTlLE 01- FULL BIT. R&R WITH CURB SPOT REPAIRS & DRAIN TILE 02*- FULL BIT. R&R WITH SERVICES & DRAINTlLE 03- FULL BIT. R&R WITH 'M.l, SERVICES, & DRAINTILE E- EDGE MILL & OVERLAY WITH CURB SPOT REPAIRS ASSESSMENT WILL VARY DRINKING WATER SUPPLY MANAGEMENT AREA *CONNECTION CHARGE WILL BE APPLIED IN LIEU OF WATER MAIN ASSSESSMENT 2009 PROPOSED IMPROVEMENTS --I / \/:- \-.1- '" : f/;k------:.,..-J :II: r\ \, ~;--:;_ __ n f7I "~f--~ , \ ,-/, H~ , 0 I \ ~ r-----tI ------ I ~ ~ -LI ~~- r1 - il i . I ~ --1-:* = !I /)H- --l ~I!!I ~ EI 1" ti-I I ~ ~m f-j..--t \'~ n:TTr I ~/~~-LLL- ~ll ~~:~',)-~~'-I~l/ > · \ ,..-.. 7>11D~ --~.. =il '-Kl- ~ o Ill!'.. ~ I ') ~2- r ~ ~"I ~PlD5---'. " \~/I'llTJi\~1 /?~ I l.Jt-E _.-*1 ~~~ - ~1t=1r__IU ~ '~ r "" ~- [ID' 1_ ___ I 'm_ -- ~ I II =sr ~~~f---'\ '~::il- I~ / I II t---..L...L~ ' -..~- tf1:1. \ ~f--- \::- ~ ~ I/,/ 1 I - ---4. i ~!E1 I"" i ~v:w ~ m I HAJ..,~ I.J., < - ---4, I ::ur::r:I.l:J c -=~,HtH \ \---j J"" II _ E.J H H J\~ImY-~1 ~iffiE ~' . .r.a~----. ~ ~ /l -. i'.... T ~a\'~ \ I ~ I -- -HI I I I ,~\ .J \ \ ....- ,- ::::l..ll -~ - u ff5rtJjK li~ik 'I ,- /ffl r- =~;l?- n I i~J~ rT~ EB am;:1 ~rm I I I -- hll U j I ;J AH31i8J~~ _ !_J9~ ~~ v l ~. ~~Ifj~1 2=1111 I sfJi~ ~~~ ' ~ ~ru J\yP---- , ~ A / .-y,~' ,j=- ~0"":::~ ~ "' " ~ Z/J \~f ~-~- ~'.8~&__--'1[d~_ LIT ~ I~ J_r~J\ v0QIu :S1~lRAL . I ,- *I~~ '-Vk= ~ I)' ~ ~ I L; I I I --' .-. I=YK~~.,L 10 IH 'r= CHIiR r-#h) J))-~!Jr~ J..~ li~ * N 111 T3 ~ K!l ~ v;-q ~II~ -. * \ 3B)'tl~ \ I * ~ ~ ~ r1EWJJ '~ trr{ II 7) 1'- ~/ =lp--J~ "'~ C iTiTrTl [tD - rJcR pEL r _.J~I ..... - ! ~ i ~ ~ \ \ 1\ - ..... FIGURE 2 . Bonestroo CITY OF CENTERVILLE 2009 STREET AND UTILITY IMPROVEMENT PROJECT 61607158F002. DWG DATE:3j20j08 COMM: 616-07-158 Page 1 of2 Kim Stephan From: pbranch [pbranch@cox.net] Sent: Monday, May 12, 2008 9:44 PM To: 'Kim Stephan' Cc: skseeley@yahoo.com Subject: FW: Fete De Lac First Annual 8K Attachments: Fete De Lac Prop. doc Kim and Suzanne Attached is a proposal I have received from Anderson Race Management. This is the first race management group I have approached. There are other ways we could do this. Such as, using Active.Com for on-line registration their fee would be paid for my the runners/walkers. We could and probably should do many of the other tasks ourselves. My questions to you Kim, is please look over Anderson's proposal and tell me what on that list of things you think that we can work ourselves or maybe the City doesn't need to do at all Pat Branch . .. -----OriginaJ Message----- From: Mary Anderson [mailto:mary@andersonraces.com] Sent: Monday, May 12, 2008 11:21 AM To: 'pbranch' Subject: RE: Fete De Lac First Annual 8K Hi Pat, Thanks for your interest. I have attached my bid for services currently. I am not sure about my 2009 schedule at this point, but if I am available I would be interested. Mary Anderson Anderson Race Management 4047 Camberwell Dr N Eagan, MN 55123 651-688-9143 From: pbranch [mailto:pbranch@cox.net] Sent: Saturday, May 10, 2008 7:51 PM To: info@andersonraces.com Subject: Fete De Lac First Annual 8K Mary, You were referred by MORA as a race management firm. I am a member of the Centerville Minnesota Park and Recreation Committee. We are in the very early stages of planning an 8K race around Centerville Lake. The race will be an 8K and will be first run as part of Centerville's annual festival in Aug 2009. What services can Anderson Race management provide? My first task is to gain the City Council's approval. To do that I must build a budget and a project a revenue steam. Any suggestion you have in that regard will be appreciated You can contact me on Monday or Tuesday evening at 703-323-0927. After Tuesday use by cell phone 703-501- 6815 5/30/2008 ANDERSON RACE MANAGEMENT May 12,2008 Pat Branch Fete De Lac Run The following is the proposal for the Fete De Lac RunlWalk in August 2009 in Centerville, MN. The proposal is for the event to beginlf"mish at Centerville Lake. Anderson Race Management proposes a fee of $2,500 (plus mileage for meetings/race) and includes the following: -Secure a site/race route for the event by submitting all permits. Working with City and Park Board to fulfill permit issuing requirements such as posting signage, etc. (Financial responsibility of Event) -Secure policelbarricades for safety of event (Financial responsibility of Event) -Measure, mark and secure race course on race day. -List race calendar postings on various MN and National running related websites. -Distribute entry forms to metro area running stores, fitness clubs and running clubs. -Submit forms for event insurance ifneeded (Financial responsibility of Event). -Arrange various equipment rentals/services such as tents, tables, portable toilets, announcer, etc. ARM works with preferred vendors to secure the lowest prices for equipment rental. (Financial responsibility of Event). -Design a layout for all activities (startlfinis~ registration, parking, refreshments, awards ceremony, etc.) -Coordinate all race day volunteer needs. Volunteers to be provided by Event. -Manage entry form collection process. -Arrange announcer services if requested. -Arrange paramedic services if requested. -Provide online listing and links on www.andersonraces.com. -Provide race site signage and mile markers. -Listing in ARM Newsletter (1 paragraph plus race logo)-distribution of 18,000 plus metro runner emails. -ARM Client preferred rates with metro area running related magazines. - Work with ARM preferred product sponsors to secure donated product. Any product requested, but not able to secure through sponsorship will be the financial responsibility of the Event. -Timing Services Breaksdown on second page. The following will serve as the proposal for Results/Timing Services for the event. ARM proposes the following price for timing the event: Tae: Timme: Results $1.25 Per Registered Participant Minimum Fee is $400 OR Chip Timme: Results $3.00 Per Registered Participant $1.50 for Prepared Chip Packets Not Used $10 Per Lost Chip Minimum Fee is $1,000 This includes: All data entry, which includes information submitted on the participant's entry form. Working with on-line registration. After the event, I will submit a file to the media outlets of your choice. You will receive electronic copies of the results submitted in numerical order of finish, as well as age category winners. Calendar Listing, Entry form pdf, and results listing on www.andersonraces.com. I will also provide Alpha and Numeric lists for pre-registration, as well as label race numbers (provided by you) with pre-registered participant's information. After the event is complete, you will also receive a mailing list file with all participants' information that can be used for results, registration forms, etc. Results labels may be provided at a cost of $.05/label to mail to all finishers. This bid also includes all finish line equipment, such as clock with stand, orange cones, spindles, stop watches, and any computer equipment necessary to compute results. -ARM will be allowed to stufIup to 2 entry forms in race packets. I hope that this proposal encompasses everything you are looking for. If you have any questions or concerns, please don't hesitate to call. Thank you for allowing me to prepare a proposal for this event. Sincerely, Mary Anderson Anderson Race Management 4047 Camberwell Dr N Eagan, MN 55123 651-688-9143 mary@andersonraces.com