HomeMy WebLinkAbout2008-08-27 CC - Set Agenda & Handouts
~eroiffe
'Estafiisfm[ 1857
CITY COUNCIL MEETING AGENDA
Wednesday, August 27, 2008
OPEN FORUM 6:30 p.m.: An opportunity for members of the public to address the City Council on items not on
the current agenda. Items requiring Council action may be deferred to staff or Boards and Commissions for
research and future Council Agendas if appropriate. You will be limited to two (2) minutes and we ask that you
conduct yourself in a professional, courteous manner, and refrain from the use of profanity. Failure to abide by this
policy may result in the loss of your privilege to speak. Persons wishing to speak will be required to complete a
sign-up sheet and give it to the Mayor or a Staff person by 6: 15 p.m.
I. CALL TO ORDER at 6:30 p.m. or shortly thereafter
1. Roll Call
II. PUBLIC HEARING
III. APPROVAL OF AGENDA
IV. APPROVAL OF MINUTES
1. August 13, 2008 City Council Meeting Minutes (Pages 1-9)
2. August 13,2008 City Council Work Session Meeting Minutes (Pages 10-11)
V. CONSENT AGENDA
1. City of Centerville August 14,2008 through August 27, 2008 Claims (Page
12 & 12a)
2. Centennial Fire District Claims through August 19, 2008 (Page 13)
3. Centennial Lakes Police Department Claims through August 14,2008
(Pages 14-16)
4. Encroachment Agreement (Shed) - 7317 Brian Drive, Mr. & Mrs. Ankrum
(Pages 17-23)
5. Mr. Jeff Colchiak - Massage Therapist Certificate, Serenity Now Healing
(Page 24) - All Required Document & Background Check Have Been
Successfully Received
VI. A W ARDS/PRESENTATIONS/APPEARANCES
VII. OLD BUSINESS
1. Downtown Drainage Pond - St. Genevieve
VIII. NEW BUSINESS
1. City Property Storm Damage Repair - A.J. Ross Concrete & Masonry
IV. ANNOUNCEMENTSIUPDATES
1. City Administrator, Mr. Dallas Larson
x. ADJOURNMENT
* *REMINDERS * *
City Hall Office Closed In Observance of Labor Day - September 1, 2008
Planning & Zoning Commission Meeting - September 2, 2008,6:30 p.m. Council Chambers
Parks & Recreation Committee Meeting - September 3, 2008, 6;30 p.m. Council Chambers
September 9, 2008 - State Primary - St. Genevieve's Community Parish Center, 6995
Centerville Road **Exercise Your Right to Vote** - 7;00 a.m. to 8;00 p.m.
City Council Meeting - September 10, 2008, 6:30 p.m. Council Chambers
City Council Meeting - September 24, 2008, 6:30 p.m. Council Chambers
CITY OF CENTERVILLE
08/27/08 3:41 PM
Page 1
'tervi{[e
*Check Summary Register@
'Estalltislit'{{ 185?
AUGUST 2008
IJPDATE
Name
Check Date
10100 MAIN STREET BANK
Paid Chk# 023628 BONESTROO, ROSENE, ANDERL 8/27/2008
Paid Chk# 023629 LINCOLN MUTUAL LIFE & CASUA 8/27/2008
Paid Chk# 023630 MN DEPARTMENT OF HEALTH 8/27/2008
Paid Chk# 023631 QWEST 8/27/2008
Paid Chk# 023632 TACHNEY ROOFING & SIDING IN 8/27/2008
Paid Chk# 023633 US BANK" 8/27/2008
Paid Chk# 500191E BI-WEEKLY ACH 8/7/2008
Paid Chk# 500206E BI-WEEKL Y ACH 8/21/2008
Total Checks
Check Amt
$49,329.56 GENERAL - SERV THRU 7-26-08
$248.56 SEPT. 2008 L1F INS.
$1,524.00 SAFE WATER TEST FEE
$420.07 651-429-4750 PH SERV THRU 9-15
$5.75 REFUND BLDG PERMIT 08-863 -OV
$628.92 ENDICIA INTERNET POST
$17,436.69
$16,801.06
$86,394.61
/-:>
// t2.../
Mel11o..,
TO: Honorable Mayor and Council Members
FROM: City Clerk, Teresa Bender
SUBJECT: Application for Massage Therapist Certification, Mr. Jeffrey Korolchuk-
Practicing at Serenity Now Healing (7043 - 20th Avenue South)
DATE: August 22,2008
The following submission of documentation and a required background check by the
Centennial Lakes Police Department have successfully been received and completed by
the City and will remain on file:
. Centennial Lakes Police Department Background Check (local records)
Completed: August 19.2008.
. Faxed Letter from Health Partners Stating That Applicant is Free of
Communicable Diseases at this Time: Julv 16. 2008.
· Completed Application for Massage Therapist Certification/License and
Submitted Associated Fee: Julv 16. 2008.
· Completed Authorization & Release Form: July 16.2008.
· Copy of Minnesota Driver's License (Expiration Date: August 1,2012).
· American Massage Therapy Association Membership Confirmation, "Student":
2008-2009 - Expires June 30. 2009.
. Letter from Globe University Minnesota School of Business Verifying
Enrollment in the Associate of Applied Science Massage Therapy Program &
Completion of 1,090 Hours of Same. Anticipated Graduation Date: September
19,2008.: Julv 15.2008.
c: NX XI'"' :E:II .....)10 em!:: r-I'"' I'"' I'"' I'"'~ ~~ n I'"'
~ 0-. -I>> I>>~ 00 ;::t~;::t lili I>> I>> I>> 0 ~ 0
(/I =~ Q,~ COo I I ~aI 0
0 ~i ;'1>> ;::3 f(!f(! !!'.
~ .. - ~ii"f(! i~ XN ~
"Tl ~::s ot~ 0'1l ~;:~ On o'
i'~ ~'1l ~I>> ~~ C 0 ~
;- ~ : )Io~ g ~ g gg X r- :E'1l tII ~
.. :I. :1.1>> CDQ, 0 ~ 1>>1>> CD_
S !e~ < .. 0 < .. "'.... 0 3~ Ii
~~ I !D W ,.. !
~ if:!! ;:~ '1l ~ ~
-0 So I>> aI 'II:
CD l 0 x
~ S' il- l>> '" =
a CD
~ '" ~ '"
CD
I'"'
0
0
N NNN NN .... ... ... ... ....... ... ... ... ... .... 'II:
W WWN ....0 coco .....'" Ul"W "'.... ooco coco ............ ....
-< ~ ~ ~~ ~~ ~~ 6~ c:: ::s ::s i: ~ i~ -<z -< 0
i 00 = 0 lJ I>>
(/I tII '" tII tII '" "'''' '" (/I '" :1
~
CD
c::
l!!.
z
0
~ ~~ ~ ~ ~ -< :II
CD ~
(II (II (II (II (II 0> (II
~ c:: "Tl
or
'" 0> 0>
:T
~'
~ ~ ~ "Tl
'"
'" 0> 0> 0
iir
~ CIl
(II 0:
~'
0
-< C> ~
CD c:
0> Ii
iil 0
....
0
~ -< ~ CD
CD ::l
'" 0> -
~ CD
::s S.
ur ii'
~ ~ ~ 9:;0 ~
CD 0 0> 3~ ::J
CD ~ '" Q.
::J a ~
0>
'" (II
=;'
~ ~ ~ '" [ ~'lit~ {G
lC
(II (II 0> ::Ja~
III ::J
1>> 5' ~
'" lC (I)
e,
0 ~
X
Q.
0 (II
0
iil
oQ.;lJ < OJ 0;0 ;0 ;og;lJ zc: ~ti1~ CDCDg'Q
o III 0 CD CD 8 ~ CD OlC
a~g, ~~ ::0 ~Cim -, ::J' 3"2.lC ~'2.=::r
..., ::J ::J ~. CD g '" - ~fJ~ .., Q) c.. CD
(I) lC 0 0> or 2-~ .r 0>::0 ~ ~ ~. -.
"'(J)'O cO' g: ::J' ::r~::S C,!l. (J)Q.1l1
lS .!, 3 3 III (II 0> al' iil c: "'_
"is ? ::J '" -, cO' cO' ::J '" CD c: ::J '" (I)
Q. ~~ ? '" ~ Q Ul s~ Q.1i
Q ~ Ii"> ag- CD iil
~ 5' Ql' 5' "il::J
~ III < 3 Q~ all
::J c: (J) '"
iii' iil ~~ 0 '"
::J' ::J ';'l =0
fil !D Q. ::J
(I)
~ ~ ~~ ~ , , , ~ ~ , ~ (")
0
8l ~ I-.> ::J
~ """" <.II ..... ~ 0 )Ioi5"
Co> -..... u,c..n ."" N ~ <0 ~
::! ~ coO:> g N <II
OCO ..... "" <.II
! ~ ~ ~~ ~ , , , ~ ~ , ~ (")
0
5' <.II ~ '"
Q. W co .......... "" <.n ~ ..... OJi5"
~l' <0 N (.no, a, ~ ~ <0 ~
<.II I-.> 00 "" CD .eo. .....
<i w 0 00 0 0 0 w
Ul
CD ~ ~~ ~ ~ ~~ ~ ~~ ~~ ~ ~
~
6l
<i "" ~
..... CON .w <.II I-.>~ I-.>
<n <nO> ~ w 'Ow w ww Ou. .0 w
~ 1-.>0 ~ 0 00 0 00 00 0 0
00 0 00 0 00 00 0 0
AJ ROSS CONCREIE AND MASONRY
PROPOSAL
RE: Centerville storm damage
>> location #1
Total for this location
>> Location #7
Total for this location
>> Location #9
Total for this location
>> Location #17
Total for this location
>> Location #20-#21
Total for these locations
>> Location #23
Total for this location
Roof Replacement
Parapet flashing around Fire Hall
Gutter and Downspouts
t1R" replacement
Misc. Painting
$17973.00
Roof Replacement
Facia Replacement
$1440.00
Roof Replacement
Facia Replacement
Painting of doors and window trim
$5480.00
Roof Replacement
Facia Replacement
Pipe Vent Replacement
Handrail Replacement
$4840.00
Metal Roofing Replacement
$7500.00 each
Ext. $15.000
Roof Vent Replacement (3)
Parapet Flashing Replacement
Screens Replacement
Painting
Sign Repair - co!ty Ivvn b":ltL'j
$9220.00
AJ ROSS CONCRETE AND MASONRY 7244 BRIAN DR CENTERVILLE, MN
763-742-4741
[D)[E@[E[] ~~
till AUG 1 D i:UUB ~
By
I
<~,
~ 63,9.
~
AJ ROSS CONCRETE AND MASONRY
CENTERVILLE ROOFING REPAIRS
LOCA TION#
I
ROOF PITCH
-r. ^" ~W I-tU rf' ~V
'l... ""0<"
SHINGLE
t,.vdu",";' t\L.
SHINGLE MFG
COLOR
n::llt~
WI' firotect bushes and shrubs from debris
"", Remove existing roof materials, R1~se boards
o Install new sheeting, extra c7s,Z ~ f) Ii) per sheet. Not included in price below
o ..,...Roof board replacement is . 0 per ft. Not included in cost below
~ Install Ice and water barrier on roof eaves, valleys, and roof penetrations (per dty code)
V Apply 15 lb. tar paper over remaining portion of roof deck
o ./D-Style roof edge on gable edgey /
V ~eplace soil-stack covers. ~eplace roof vents Painted '
V"" r starter on bottom edge
o~ /tlvanized pre-formed .y{' valley
w' /1 oof nails will be used to fasten shingles per manufacturers specification
Shingle entire roof area complete with ridge cap, caulk as needed
o Replace dormer flashing
o Replace furnace pipe accessories
o ./Install new metal flashing in chimney
~ Remove all roof debris from job site. Magnetic sweep included
~ ROSS Concrete and Masonry guarantees roof for 7 years against leaks except for building structure changes or severe
weather, etc.
or / Manufacturer warranties shingles for~ears.
~ ~~~Si~?FJ1?~~'~~~~
Building permits and all sales tax included in total cost of the job.
Payment
J
ration for the servic s to be performed cy the contractor, client agrees to pay the sum of ($ /7773. (ii)
\ j ",\.~A -
CIC~/
AJ ROSS CONCRETE AND MASONRY
CENTERVlllE ROOFING REPAIRS
LOCATION# '# 7
ROOF PITCH
SHINGLE
SHINGLE MFG ~y.
COLOR
M-r;e..,( +- ~
(j
n:>t.. LD "'Z.....() ('
/
lfI'/protect bushes and shrubs from debris
V Remove existing roof materials, Re-nailloose boards
o Install new sheeting, extra cost is, per sheet. Not included in price below
o ./Roof board replacement is oer ft. Not included in cost below
..... ~stall ice and water barrier on roof eaves, valleys, and roof penetrations (per city code)
r/' Apply 15 lb. tar paper over remaining portion of roof deck
~ D-style roof edge on gable edges
o /Replace soil-stack covers. Replace roof vents
fI" 7" starter on bottom edge
o Galvanized pre-formed "w" valley
%Roof nails will be used to fasten shingles per manufacturers specification
~ Shingle entire roof area complete with ridge cap, caulk as needed
o Replace dormer flashing
o Replace furnace pipe accessories
o ./fnstall new metal flashing in chimney
f/' fiemove all roof debris from job site. Magnetic sweep included
,yI' AI ROSS Concrete and Masonry guarantees roof for 7 years against leaks except for building structure changes or severe
/weather, etc. 711
/ ~anufacturer warranties shingles for ~years.
01' Addmooo' ~:l ~ d1 g(~
w_ou ~~ _ _. _ ~ a ~~ ;~t _ .
~/~ ~ ~ . of ~ So k-
Painted
Building permits and all sales tax included in total cost of the job.
Payment
the contractor, client agr s to pay the sum of ($ l'l1 I. vv
-- Dollars
t:!){ OWN!"
AJ ROSS CONCRETE AND MASONRY
ROOF PITCH )-v
SHINGLE MFG~
SHINGLE
LOCATION# 'r
Ti"""bc-r-),.~
j::"'</.1.f- 6UP1
CENTERVILLE ROOFING REPAIRS
COLOR
n=-to
'D-)}
It' ~otect bushes and shrubs from debris
V Remove existing roof materials, Re- ai se _~ards
o Install new sheeting, extra coJ!: is, ~r sheet. Not included in price below
o ~oof board replacement is c> er ft. Not included in cost below
~ /fnstall ice and water barrier on roof eaves, valleys, and roof penetrations (per city code)
t/' / Apply 15 lb. tar paper over remaining portion of roof deck
v' /D-style roof edge on gable edges/' /'
V...,.Replace soil-stack covers. ~place roof vents vfainted
~ 7n starter on bottom edge
o Alvanized pre-formed n~ valley
V~oof nails will be used to fasten shingles per manufacturers specification
\V'" Shingle entire roof area complete with ridge cap, caulk as needed
~ ~Iace dormer flashing
~eI'" Replace furnace pipe accessories
o Install new metal flashing in chimney
r/ .Aemove all roof debris from job site. Magnetic sweep included
~OSS Concrete and Masonry guarantees roof for 7 years against leaks except for building structure changes or severe
~ther, etc. "7/\
anufacturer war ties shingles for~ears.
Additional d '
comments
Building permits and all sales tax included in total cost of the job.
Payment
J
the contractor, client agrees to pay the sum of ($ "r;-M. 0 d )
~-
- Dollars
tJl/Vtur
AJ ROSS CONCRETE AND MASONRY
CENTERVILLE ROOFING REPAIRS
LOCA TION#
/1
ROOF PITCH
SHINGLE
TiM-wI, ~
, .
SHINGLE MFG
aA=F
COLOR
n:at,:ll
v ""'protect bushes and shrubs from debris
fit" Remove existing roof materials. Re- ail se boards
o Install new sheetin& extra cost. . . V er sheet. Not included in price below
o /Roof board replacement is er ft. Not included in cost below
.r /Install ice and water barrier on roof eaves, valleys, and roof penetrations (per city code)
v'/Apply 15 lb. tar paper over remain' portion of roof deck
~Ie roof edge on gable edg
o eplace soil-stack covers. Replace roof vents Painted
r starter on bottom edge
~ Afalvanized pre-formed "w" valley
\Y"" Aoof nails will be used to fasten shingles per manufacturers specification
~ Shingle entire roof area complete with ridge caP. caulk as needed
o Replace dormer flashing
~ePlace furnace pipe accessories
o Install new metal flashing in chimney
~ ./Remove all roof debris from job site. Magnetic sweep included
~ AJ ROSS Concrete and Masonry guarantees roof for 7 years against leaks except for building structure changes or severe
~ather, etc.
~ ~ufacturer warranties shingles for ~ears.
y-- Additional .
comments Q..t.... '^
A
Building permits and all sales tax included in total cost of the job.
Payment
In consideration for the services to be performed cy the contractor, client agrees to pay the sum of ($
~ 71-vW)....ul_.R.')~+ ~./u'5
L{f~lJ. at)
Dollars
~ {lNNr
..
I
AJ ROSS CONCRETE AND MASONRY
ROOF PITCH
....(,.... fJ-...
LOCATION# Q 0 - 2.. )
SHINGLE fYI f:;J k L
COLOR ~ ltA.L-/9 f'~
CENTERVILLE ROOFING REPAIRS
SHINGLE MFG
O::.'to,
o Protect bushes and shrubs from debris
o Remove existing roof materials, Re-nail loose boards
o Install new sheeting, extra cost is, per sheet. Not included in price below
o Roof board replacement is per ft. Not included in cost below
o Install ice and water barrier on roof eaves, valleys, and roof penetrations (per city code)
o Apply lS lb. tar paper over remaining portion of roof deck
o D-style roof edge on gable edges
o Replace soil-stack covers. Replace roof vents Painted
o 7" starter on bottom edge
o Galvanized pre-formed "w" valley
o Roof nails will be used to fasten shingles per manufacturers specification
o Shingle entire roof area complete with ridge cap, caulk as needed
o Replace dormer flashing
o Replace fumace pipe accessories
~o II new metal flashing in chimney
<t" ./Remove all roof debris from job site. Magnetic sweep included
AJ ROSS Concrete and Masonry guarantees roof for 7 years against leaks except for building structure changes or severe
weather, etc.
o Manufacturer warranties shingles for _years.
o Additional -.M J I
oomm"~I~~ C<~fl:;l~~~~,
Building permits and all sales tax included in total cost of the job.
Payment
In con ideration for the services to be performed cy the contractor, client agrees to pay the sum of ($
, '. _//
~ -----
-:7t)O{). tlO I
Dollars
-*
Cx.~
C~+--
} .s;COO, OD
&2#t OU/lur'
AJ ROSS CONCRETE AND MASONRY
\
CENTERVILLE ROOFING REPAIRS
LOCATION# 23
ROOF PITCH
SHINGLE
SHINGLE MFG
COLOR
n:.1t-~
~
o Protect bushes and shrubs from debris
o Remove existing roof materials, Re-nailloose boards
o Install new sheeting, extra cost is, per sheet.Not induded in price below
o Roof board replacement is Der ft. Not induded in cost below
o Install ice and water barrier on roof eaves, valleys, and roof penetrations (per city code)
~IY 15 lb. tar paper over remaini portion of roof deck
o style roof edge on gable edge
Replace soil-stack covers. eplace roof vents Painted
o 7- starter on bottom edge
o Galvanized pre-formed -W- valley
o Roof nails will be used to fasten shingles per manufacturers specification
o Shingle entire roof area complete with ridge cap, caulk as needed
o Replace dormer flashing
o Replace furnace pipe accessories
o Install new metal flashing in chimney
o ...,.Remove all roof debris from job site. Magnetic sweep included
.,.r AJ ROSS Concrete and Masonry guarantees roof for 7 years against leaks except for building structure changes or severe
weather, etc.
o Manufacturer warranties shingles for _years.
o ~~:;c2::;bi;;~:?:r:~~~i
Building permits and all sales tax included in total cost of the job.
Payment
In consideration for the services to be performed cy the contractor, client agrees to pay the sum of ($ f:Jtd. O~
(J /~ iJ~ - /-<..J.(! hv.AW ~ -00"'"
(J,A/Jtlj/