HomeMy WebLinkAbout2009-09-23 CC - Set Agenda w/Handouts
"1
1880 ~ain SUed, Omtervi{[e, '.M!J{ 55038
651-429-3232 or q:fi.(651-429~8629
PUBLIC COMMENT SIGN-UP SHEET
The City Council wish to afford an opportunity for members of the public to address the City Council on
items not on the current agenda Items requiring ColDlcil action maybe deferred to staff or Boards and
Commissions for research and future CoW1cil Agendas if appropriate. You wiIl be limited to two (2)
minutes and we ask that you conduct yowself in a professional, courteous manner, and refrain from the use
of profanity. Failure to abide by this policy may result in the loss of your privilege to speak.
Persons wishing to ~ will be required to complete a sign-up sheet and give it to the mayor or a staff
person prior to the start of the meeting.
~rU)
Address: '7 L.57
tlt-ltLflJ;/J;~ :>
;J~AAU)/1~ .l.
General description of your comments: _ A /:/ ~~4 /J'7r L; <7.4 /KL4./ r
~~ /l..MrrJA'P /!h,vJ;i;/fI"T;~) - /_flM// czf J,..,d./.?~
,x:1I.(y,,; l' mhl~ ?'
............................................................................
Please give this sheet to the Mayor or Presiding Officer, to the City Administrator
or to the City Attorney prior to the start of the meeting.
'.
6;=~
CITY OF CENTERVILLE
COUNCIL MEETING & CLOSED
EXECUTIVE SESSION AGENDA
VVednesday, SepteDlber23, 2009
6:30 p.m. or sbortly thereafter
OPEN FORUM 6:30 p.m.: An opportunity for members of the public to address the City Council on items not on
the current agenda. Items requiring Council action may be deferred to staff or Boards and Commissions for
research and future Council Agendas if appropriate. You will be limited to two (2) minutes and we ask that you
conduct yourself in a professional, courteous manner, and refrain from the use of profanity. Failure to abide by this
policy may result in the loss of your privilege to speak. Persons wishing to speak will be required to complete a
sign-up sheet and give it to the Mayor or a Staff person by 6:15 p.m.
COUNCIL MEETING
I. CALL TO ORDER
1. Roll Can
II. PUBLIC HEARING(S)
III. APPROVAL OF AGENDA
IV. APPROVAL OF MINUTES
1. SepteDlber 9, 2009 City Council Meeting Minutes (Page 1-5)
V. CONSENT AGENDA
1. City of Centerville SepteDlber 23, 2009 through SepteDlber 4, 2009 ClaiDls
(Check #24761-24791) (Page 6) & Clteck #24792-24804 (Page 6a)
2. Centennial Lakes Police DepartDtent ClaiDls through SepteDlber 10,2009
(Check #7429-7453) (Page 7)
3. Centennial Fire District ClaiDls through SepteDlber 8, 2009 (Check #3923-
3934) (Page 8)
VI. A VV ARDSIPRESENT ATIONS/APPEARANCES
1. Mr. George Ellertson, Northland Securities - Bond Results
VII. OLD BUSINESS
VIII. NEVV BUSINESS
1. Res. #09-OXX - Awarding the sale of $2,475,000 General Obligation (pages
9-33)
2. Res. #09-OXX - Interfund Loan - 2181 AvenuelBackage Road IDlproveDlents
(pages 34-35)
3. Speed Study CSAH14 East of City Han (Page 35a)
4. EDlergency Preparedness & Response Plan (H1N1) (pages 36-53)
5. Forest Lake Contracting Requestfor Time Extension Due to Swamp Deposits
{Pages 54-56}
6. Forest Lake Contracting Pay Request #5 - $105,522.67 (Peltier Lake Drive
Street & Utility ImpI'ovements 2009.01) (Pages 57-62)
7. Forest Lake Contracting Pay Request #5 - $49,017.61 (2009 Street
Improvements 2009.02) (Pages 63-68)
~ ANNOUNCEMENTSffiPDATES
1. City Administrator, Dallas Larson
2. EDA Events (M. Capra)
CLOSED EXECUTIVE SESSION
1. Labor Agreement
X. ADJOURNMENT
**REMINDERS**
CSAH14 Ribbon Cutting - September 21.2009,3:00 p.m. Peltier Lake Boat Launch
Planning & Zoning Commission Meeting - October 6, 2009, 6:30 p.m. Council Chambers
Parks & Recreation Committee Meeting - October 7, 2009, 6:30 p.m. Council Chambcrs
City Council Meeting - October 14,2009,6:30 p.m. Council Chambers
City Council Meeting - October 28.2009,6:30 p.m. Council Chambers
CITY OF CENTERVILLE
09/23/093:04 PM
Page 1
emife
*Check Summary Register@
',C'Ia/ili...Ii.<'d-.1.'i'?
Name
10100 MAIN STREET BANK
Paid Chk# 024792 ABDO, EiCK & MEYER, LLP
Paid Chk# 024793 BONESTROO, ROSENE,
Paid Chk# 024794 CHASE, RICHARD
Paid Chk# 024795 CDMCAST
Paid Chk# 024796 DELTA DENTAL
Paid Chk# 024797 FOREST LAKE CONTRACTING
Paid Chk# 024798 LARSON, DALLAS
Paid Chk# 024799 METROPOLITAN COUNCIL
Paid Chk# 024800 MINNESOTA POLLUTION
Paid Chk# 024801 M-R SIGN COMPANY, INC.
Paid Chk# 024B02 SCHWMB INC.
Paid Chk# 024803 SPRI NT
Paid Chk# 024B04 US BANK'
Paid Chk# BJ-WEEKL Y ACH
Paid Chk# BI-WEEKL Y ACH
SEPTEMBER 2009
UPDATE
Check Date
9/23/2009
9/23/2009
9/23/2009
9/23/2009
9/23/2009
9/23/2009
9/23/2009
9/23/2009
9123/2009
9/23/2009
9/2312009
9/23/2009
9/23/2009
9/3/2009
9/17/2009
Total Checks
Check Am!
$750.00 GASB 45 VALUATiON FOR YEAR END
$24,797.44 BACKAGE RD121ST AVE IMPR - SER
$94.97 CLOTHING ALLOTMENT REIMBURSEME
$66.64 CABLE -INTERNET
$423.05 DENTAL iNS. FOR OCTOBER 2009
$154,540.28 PELTIER LAKE DR ST & UT IMPRV.
$41.30 OVER PYMT ON LIFE INSURANCE
$2,020.00 SAC CHARGES
$23.00 A. ANDERSON - WASTE WATER OPER
$359.67 STREET SIGNS
$48.07 2-SELF INKING NOTARY STAMPS/BL
$248.96 CELL PHONE SERV THRU 9-14-09
$968.38 DVD RECORDER. 19" WIDESCREEN M
$20,846.77
$18,758.34
$223,984.87
WCL
,
September 23, 2009
To whom it may concern:
I would like to ask the Centerville City Council to consider a request for a speed study for
CRl4 from CentervilIe Road to Interstate 35E. .
The following is list is my concerns and why I feel the speed should be reduced to a
35mph or less through the area of concern. .
. The proximity of homes in relation to the road is about SO feet. Several ofthese
homes have children that I see playing on the driveways, sidewalks, and./lhoulders
of the road. A vehicle driving in excess of 45mph has no chance of stopping or
avoiding a .child tttat has entered the traffic lane.
. We have several Bus Stops along CRI4. Do we want kids stand"mg along a road
with cars going in excess of 45 mph?
. It is difficult for anyone to cross CRI4. Whether or not you are in the crosswalk,
it is very difficult for my customers, children, or people with pets to safely cross
the road.
. Each tenant of our Strip Center at 1990 Main Street is suffering due to the "Arrow
Only" turns at the intersection. I asked Anoka County why we don't have "Turn
On Green" that is evident across Anoka County, and their response was that "the
speed is too high". If the speed is reduced, residents and customers will have the
ability to turn on green and they won't need to wait 45 seconds for the light cycle.
. All Retail is struggling on Main Street. We need to reduce the speed so the
transient traffic will stop and patronize our locations. We need traffic from
outside of CentervilIe to stop at our locations in order for us to survive.
. People are driving in excess of 45mph on a regular basis. 45mph seems to mean
50mph or 55mph if the light is green.
As a resident and business owner in Centerville, I feel we need to prove to Anoka County
that the speed is too hig!l along CRI4. This reconstruction project has divided our
.
community and made it difficult for many businesses to survive. I will be willing to
discuss my concerns with Council, Anoka County, or the MNDOT.
.
Thank you for your ,time! .
Todd t
Comer xpress & Wiseguys Pizza
1990 Main St.
CentervilIe, MN 55038
v{(.l, \M {uJl~~~1'-<J ?,'?'?q .r;- ~L1~
I!/,llj /<:' ,EJ'.5 U&lIaf(
~ cy~~ ~~~ti'\=<>~
J5CL,;
lorlJstlaltlJ
c- ~ ClIII111Jcunl/, Inc.
September 17, 2009
Bonestroo
c/o Mr. Mark Statz, City Engineer
2335 Highway 36 W
Sl. Paul, MN 55113
14777 Lalce Drive
F01est Lalce, MN 55025
PH: (651} 464-4500
FAX: (651 }464-4722
Dear Mark:
Re: Request for Time Extension Due to Swamp Deposits
FLC requests an Extension of Time to the Substantial Completion date due to work associated
with the previously unknown swamp deposits that were discovered between approximate street
stations 15+50 to 20+50 while installing watermain.
At this stage of the project, installation of watermain was the progress controlling operation. The
watermain crew was delayed two (2) days because of lost production to install pipe through the
swamp area and to remove bridge debris. The watermain crew was delayed an additional seven
(7) days while grading crews excavated the muck and backfilled with woodchips.
We are requesting a 9-day extension due to swamp deposits resulting in a revised Substantial
Completion date of October 22, 2009.
Sincerely,
FOREST LAKE CONTRACTING, INC.
/ZLJo.umJ
Robert D. Vollhaber
Vice President
Attachments:
Peltier Lake Drive Updated #3 Schedule
2009 Streets Updated #3 Schedule
AN EQUAL OPPORTUNITY EMPLOYER
61
o
~
c5 J!l
zwc:
-...J'"
I-::lE
~O '"
~w>
O:::r E
1-00.
Z"E
o _
O"'~
w"'"
~S!
j.JJc;;
I- a.."
cn:)g
w N
0<:
o
IL
.
'"
Q
~
.,
~
o
,
~
~II
'"
.
"
~
.
~
o
-"i
~
o
>
o
Z
g
-
.
---- -T"'------ ----
- II . -
D..
..
.IT
..
.
~
.
8'"
Nil'
'"
-- ------------
1-- -
.--
I
I I
.
.
.,
~
o
,
~
I _.
- .-.-
0_8888888888888888888888888888888888888888888
E~~~~~~~M~M~MN~~~~~~g~~~~~N~CN==~~N~~ro~.N..NN
,0 -
0-
~m~~~8~~8~888mm88mgg~gg8~~~~~~i8~~~~~888188
~~m~m ma_~~~~~a~~___I~~~_~.~m~ ~__~~_a~a ~~
"'C "...........N(\j .........N.......... ~.....~_ ..... IE5:::!- NC\lNN .....N g............... .-
.n il'~I~I~I~iL "1;1~lli'<\:,~-d~I~IL,,;.;;;;O~ oUou~.,~~I~I~li llo~
o~~~~~,<<~woo~~ <w~<w<ww<<<w , <~oooo6
Imm8m8mmgg~8~gm8~888m8gm~gmm~8gg8g8~~8~~m~~8
~ ~8~~~o~o~V~~~_M a~~~~ m~~_~oo~o~v a~~~_~~
li I~ l'i'I~IJ1H ~ - ~I~ H n H ~'''I'iI'i'I'1'j'1' . : - - . ~Ih \l ~ ~ h~I'i:ln li \l
00 f '~~~~"~~oooo~,"'I~,~I~I~I~woo~ ~oooooooo~"'~'v.lv.ooo
11 ~
I ~ l! ;'0 II
~Gl '8 ~ J ~ j
IV ~ X Il/l VJ '- ~ t: lB III VI
~ ~ J!l 1f i- ....l!!ii~ ~ ~ 1.!iig~IllL01Cb !i!.....l!!1:....~ _5 Is lit
~:. ~ tmC>l!n"5nH~~~ ~~ 1~1~~~~I3~-~ -~mgl~~~ ~~~I~~~
E~~~~~am~~~i~ ~s _I~ 0N w~ N~~.~ ~~~~B~~
~ ~Iclll() ",Q...,i5ltiDm.E ~~II1IJ::!B6-;B5CL. 1lIIO"liI!i1i#'iijClmll:lwlIlj
c ~ '" ,gIn! ! 11 ~ ~ g j g ~ ~ t: fl jl '- tt. ~ tI) E fa .~ -= ~ ~ ~ i 6 ~ 6ft !Il ~ B ~ ~ ~ 2 U)
E ~EI b~e~ i~mo~S~~~~€~~3~~~~~~~~~~BIt~lI1i~~~
:I~. ~~~~ ~~~~~.!~~o8ua~I~.~lg~~51.-~a~I~~
~~It'" ~ult~mOwtl)iltm()Om ~ olt~moo~m()oo~wm~oooo
~ ~
~__N~~~~~~ g~~~'~~~~~~N~~~~re~~reg~~~~~~~~~~;~~
"
Di
>.
~~
hi
, -.
"'''
<J
- T
~
'a
.
'"
J~
Iiii'
a. a.
55
o
z
-
~
"w
~..J
I-=>>
00 ~
~wo
I-Zep
zo~
oCl)..J
OM~
=ltep
WW:';:;
~I-Ci)
:3~0-
1-0-
CI)=>>
w
0:::
o
LL
...,
c:
;:)
...,
I"-
0
0 >-
N III
~
.....
e.
<(
c:~ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
.Q (/) 0 0 0 0 0 0 0 0 0 0 0 Cl 0 0 0 0 0 0 0
..... >- N N 0 0 0 N .q- N 00 00 .q- .q- 0 (0 (") 00 <ri N .....
~ III (") ..... .q- N ..... .....
;:)0
O-
m m m m m m m m m m m m m m m m m 0 0
Q 0 0 0 0 ~ 0 0 0 Q Q 0 0 0 0 Q ~ ..... .....
-- -- -- -- -- -- -- -- -- -- -- -- --
I"- ..... (") I"- (") .q- ..... (") (0 l"- N l() 00 (0 (") l() (")
-u 0 ..... ~ Q 0 0 N Q 0 ..... ..... N 0 0 ..... N ~ ..... ~
c: ~ ~ g 9 9 Q 9 9 9 U U U U --
UJ c: ;:) 51 c: c:
III III ;:) ..., ;:) Q) ;:) Q) Q) Q) Q) 0 0 0 0 0 ;:) ;:)
~ ~ ..., <( C/J <( C/J en en C/J en ...., ....,
m m m 0) 0) m 0) m 0) 0) m 0) m m m 0) m 0 0
0 0 Q 0 0 0 0 Q 0 0 0 0 Q Q 0 0 Q ..... .....
-- -- -- -- -- -- -- -- -- -- -- -- -- --
t (0 00 N .q- m l() l() ..... l() .q- .q- l"- N ..... .q- .q- 0) .q- (")
0 0 ..... N 0 0 0 (") N 0 ..... ..... N 0 ..... ..... ..... ..... ~
III ~ ~ ~ -- -- ~ g ~ g Q. Q Q. 0. U U U U --
..... c: c: c: c:
C/J III III III ;:) ;:) ;:) ;:) ;:) ;:) Q) Q) Q) Q) 0 0 0 0 ;:) ;:)
~ ~ ~ ..., ..., <( <( <( <( C/J en en en ...., ...,
g
'0.
~ III
..... (.)
~ 0 (/)
..... -u
..... .....
Q) 0 c:
i ~ l() Q) ce l\l I
Q) Q) ..... 0:: 'U ...J
E en III ~ .;:: oes
~ ..... .0
III C/J (/)
Z en :~ III c: (/)
III 0 c: (/) lJ.. Q) Q) Q) g ..... .....
..l<:: :!: ..... III Q) 't: Q) III c:
(/) > c: N en ..... .2 l/l C) -u > l/l Q) '0
III 0 III ~ ~ Q) ..... III III
E -- III oes III > g S ...,
I- C/J ..... III c: 2: a.. ..... ce
Q) ..... ce C) C) III
Q) -- .~ C/J Q) Q) -- 0 a..
c: ~ III c: l/l l/l III
0::: "iij E en en 0 $ ..... Q) ;:) 10 c: ;:) Q)
Q) ..... Q) Q) III
-- (.) 0 0
E E C/J en 0 ..... E ..... :;:; ~ Qi ..... Q) en
Q) Q) III III c: .S ~ c:
..... E ..... .... ..... .... ..... > ..... ~ III 0 oes
III Q) $ Q) III 0 III Q) (.) ..... E Q) E
.0 (.) ...... ..... :0::; S ..... S III '8 c: Q) -- ~
III 0 III Q) C/J (.) c: ;:) > "0 ;:)
0 Q) x 0 III 0 :!: .;:: 0 ...... III
S ..... S ii5
~ 0::: en a.. UJ <( 0 0:: l- ce 0 C/J C/J
~ ..... N (") .q- l() co I"- 00 0) 0 ..... N (") .q- l() (0 I"- 00 m
0 ..... ..... ..... ..... ..... ..... ..... ..... ..... .....
0:::'1:1:
o
>-
III
2:'Qi
III 0
E-u
E Q)
;:).~
enLJ..
<J
Q)
c:
o
.....
(/)
Q)
~
c
c
c-
0)
o r
--
I"-
.....
--
e.
Q)
en
-u .....
$Q)
C:0>
"i:: m
a.. a..
S(p
CONTRACTOR'S COpy
FOR YOUR FILE
-#-
Bonestroo
Owner: Cltv of Centerville, 1880 Main S1, Centerville, MN 55038 Date: September 21, 2009
For Pellod 8121/2009 to 9/21/2009 Reauest No: 5
Contrattor Forest lake Contractina, 14777 lake Dr, Forest lake, MN 55025
CONTRACTOR'S REQUEST FOR PAYMENl
PELTIER lAKE DRIVE STREET AND UTILITY IMPROVEMENTS
80NESTROO filE NO 000616-09169-0
CITY PROJECT NO 200901
SUMMARY
1 Original Contract Amount
2 Change Order - Addition
3 Change Order - Deduction
4 Revised Contract Amount
5 Value Completed to Date
6 Material on Hand
7 Amount Earned
8 Less Retainage 5%
9 Subtotal
10 Less Amount Paid Previously
11 Liquidated damages -
12 AMOUNT DUE THIS REQUEST FOR PAYMENT NO.
$ 1,534,085 11
$ 265,418.85
$ 0.00
$ 1,799,503.96
$ 937,330 11
$ 0.00
$ 937,330.11
$ 46,86651
$ 890,46360
$ 784,940.93
$ 0.00
5 $ 105,52267
Recommended for Approval by:
BONESTROO
~~
Approved by Contractor
FOREST LAKE CONTRACTING
Approved by Owner:
CITY OF CENTERVILLE
Specified Contract Completion Date:
Date
B1609169REQ5 xis
61
(on tract Unit Current Quantity Amount
No. Item Unit Quantity Price Quantity to Date to Date
PART 1 - PROJECT MANAGEMENT:
1 MOBILIZATION LS 75000 00 0.1 0.6 145.00000
2 TRAffiC CONTROL LS 4000.00 0.1 0.6 12,40000
TOTAL PART 1 . PROJECT MANAGEMENT: $47,40000
PART 2A. TYPE I, II, AND III IMPROVEMENTS . PELTIER LAKE DR & CENTERVILLE RD AREAS:
3 TEMPORARY ROCK CONSTRUCTION ENTRANCE TN 150 5.00 105 $52500
4 FLOTATION SILT CURTAIN LF m 800 190 $1,52000
5 SILT FENCE, MACHINE SLICED LF 3050 TOO 782 $782.00
6 TEMPORARY MAILBOXES LS 1 750.00 1 $750.00
7 DEWATERING LS 1 0.01 1 $0.01
8 REMOVE BITUMINOUS PAVEMENT 5Y 14500 TOO 12913 $12,91300
9 REMOVE CONCRETE CURB AND GUTTER LF 100 6.00 112 $672.00
10 REMOVE BITUMINOUS DRIVEWAY SY 1425 3.00 12 12 $3600
11 REMOVE CONCRETE DRIVEWAY PAVEMENT 5Y 800 4.00 450 500 $2,00000
12 REMOVE FENCE LF 250 2.00 189 $37800
13 REMOVE WOOD WEIR EA 1 300.00 $0.00
14 REMOVE SANITARY SEWER PIPE LF 500 300 529 $1,58700
15 REMOVE SANITARY SEWER SERVICE PIPE LF 400 3.00 5 118 $354.00
16 REMOVE STORM SEWER PIPE LF 700 700 83 652 $4,56400
17 REMOVE FLARED END SECTION EA 2 200.00 1 2 $400 00
18 REMOVE WATER MAIN LF 50 5.00 27 $135 00
19 REMOVE TREE EA 30 100.00 30 $3,00000
20 REMOVE STORM SEWER CATCH BASIN MANHOLE EA 8 30000 8 $2,40000
21 REMOVE STORM SEWER CATCH BASIN EA 2 30000 2 $600 00
22 SALVAGE AND REINSTALL MAilBOX EA 65 50.00 33 $1,65000
23 SALVAGE GATE VALVE AND BOX EA 1 300 00 $0.00
24 SALVAGE HYDRANT, GATE VALVE, 8' X 6' TEE, AND PLUG EA 1 600.00 1 $600 00
25 SALVAGE HYDRANT, VALVE, AND 8" X 6" REDUCER EA 1 60000 1 $600 00
26 REINSTALL SALVAGED HYDRANT AND VALVE EA 2 800.00 2 $1,60000
27 SALVAGE AND REINSTALL SIGN EA 25 85.00 $0.00
28 SALVAGE AND REINSTALL IRRIGATION LINES LF 1500 3.00 $000
29 SALVAGE AND REINSTALL IRRIGATION HEADS EA 30 6000 $0.00
30 ADJUST EXISTING CUR8 BOX EA 8 5000 $000
31 ADJUST EXISTING VALVE BOX EA 2 600.00 $000
32 ADJUST EXISTING SANITARY SEWER MANHOLE FRAME AND
RING CASTING EA 38 400.00 $0.00
33 ADJUST EXISTING STORM SEWER MANHOLE FRAME AND RING
CASTING EA 1 600.00 $000
34 R-1914-A CASTING PLACED IN PATHWAY OR SIDEWALK EA 8 300.00 $000
35 RECONSTRUCT EXISTING VALVE BOX EA 1 300.00 $000
36 RECONSTRUCT SANITARY SEWER MANHOLE LF 14 300.00 10 10 $3,00000
37 RECONSTRUCT SANITARY SEWER OUTSIDE DROP LF 10 800 00 0.5 $400.00
38 GROUT EXISTING STRUCTURE, INCL DOGHOUSES, INVERTS,
BENCHES EA 10 90.00 $000
39 SAWING BITUMINOUS PAVEMENT LF 1675 4.00 21 21 $84.00
40 SAWING CONCRETE PAVEMENT LF 700 4.00 55 77 $30800
41 CONNfCTTO EXISTING 8' WATER MAIN EA 4 800.00 1 4 $3,20000
42 8" PVC C900 WATER MAIN, DR 18 LF 2800 30.00 2739 $82,17000
43 6" PVC C900WATER MAIN, DR 18 LF 200 25.00 30 115 $2,87500
44 8" GATE VALVE AND BOX EA 5 150000 3 $4,50000
45 HYDRANT WITH VALVE EA 7 400000 2 6 $24,00000
46 DUCTILE IRON FITTINGS LB 5750 2.20 100 4100 $9,02000
47 HYDRANT EXTENSION LF 3 50000 2 $1, 000 00
48 CONNECT WATER SERVICE TO EXISTING PLUMBING INSIDE
HOME EA 24 500 00 12 26 $13,00000
49 1" CORPORATION STOP WITH 8" SADDLE EA 48 300.00 27 45 $13,50000
50 1" CURB STOP AND BOX EA 48 300.00 27 45 $13,50000
51 1" WATER SERVICE. MAIN TO CURB STOP LF 1700 1400 755 1200 $16,80000
61609169REQ5Jds 61
Contract Unit Current Quantity Amount
No, Item Unit Quantity Price Quantity to Date to Date
52 1" WATER SERVICE DIRECTIONAL DRILLED - CURB STOP TO
HOME LF 1250 14.00 322 1700 123,80000
53 INSULATION, 4" THICK SY 150 2000 3.6 $7200
54 IMPROVED PIPE FOUNDATION, PER 6" INCREMENT - WATER
MAIN LF 1500 400 1054 14,21600
55 CLOSED CIRCUIT TV INSPECTION LF 3800 1 50 $0.00
56 CONNECT TO EXISTING SANITARY 5EWER VCP EA 12 400.00 9 $3,60000
57 CONNECT TO EXISTING SANITARY SEWER MANHOLE EA 6 800.00 6 $4,800.00
58 8" PVC SANITARY SEWER, 5DR 26, 0' - 1]' DEEP LF 450 38.00 303 $11,514.00
59 8" PVC SANITARY SEWER, 5DR 26, 13' AND DEEPER LF 350 55.00 258 $14,19000
60 RECONNECT 4" 5ANITARY SEWER SERVICE EA 20 150.00 7 15 $2,25000
61 4" PVC, SCH. 40 SERVICE PIPE LF 400 3500 100 $3,50000
62 4" PVC, 5CH. 80 RISER PIPE LF 250 2500 $0.00
63 8" X 4" PVC WYE, 5DR 26 EA 20 15000 8 $1.20000
64 IMPROVED PIPE FOUNDATION, PER 6" INCREMENT - SANITARY
SEWER LF 1500 400 748 $2,99200
TOTAL PART 2A- TYPE I, II, AND III IMPROVEMENTS - PEL TIER LAKE DR & CENTERVILLE RD AREAS: $296,557.01
PART 2B- TYPE I, II, AND III IMPROVEMENTS - PELTIER LAKE DR & CENTERVILLE RD AREAS:
65 CLEAN EXISTING STORM PIPE LF 400 5.00 $0.00
66 CONNECT TO EXISTING RCP STORM SEWER EA 2 600 00 2 11,20000
67 12" RCP FLARED END SECTION, INCL TRASH GUARD EA 1 700.00 1 170000
68 18" RCP FLARED END SECTION, INCL TRASH GUARD EA 4 700.00 1 4 12,80000
69 12" RCP STORM SEWER, CLASS S LF 466 2S.00 310 457 111,42S00
70 15" RCP STORM SEWER, CLASS S LF 279 2800 268 $7,50400
71 18" RCP STORM SEWER, CLASS S LF 762 30.00 83 72S 121,750.00
72 21" RCP STORM SEWER, CLASS 4 LF 32 32.00 32 11,02400
73 CLASS III RANDOM RIPRAP CY 114 70.00 85 15,95000
74 2' X 3' CB, INCL. R-3067-V CSTG AND CONC ADJ RINGS EA 8 150000 6 $9,00000
75 4' DIA STORM SEWER CBMH, INCL R-3067-V CSTG AND CONC
ADJ RINGS EA 14 1700.00 2 12 120,400.00
76 4' DIA STORM SEWER MH, INCL R-1642-B C5TG AND CONC ADJ
RINGS EA 17DD 00 11)0000
77 5' DIA STORM MH, INCL R-1642-B CSTG AND CONC ADJ RINGS EA 170000 11)0000
78 2' X 3' CB WITH 2' SUMP, INCL. R-3067-V CSTG AND CONC ADJ
RINGS EA 1800.00 11,800.00
79 4' DIA CBMH WITH 2' SUMP, INCL R-3067-V CSTG AND CONC
ADJ RINGS EA 1 23DOOD 12,30000
80 WOOD WEIR EA 2 1600 00 10.OD
81 4" PERFORATED POLYETHYLENE DRAINTILE PIPE WITH SOCK
WRAP LF 10050 200 2622 7041 114,08200
82 IMPROVED PIPE FOUNDATION, PER 6" INCREMENT - 5TORM
SEWER LF 400 500 154 $770 00
83 COMMON EXCAVATION (EV) CY 125DO 800 1000 9000 $72,00000
84 SUBGRADE EXCAVATION (EV) CY 5750 1 DO 35 $3500
85 SUBGRADE PREPARATION - STREET SY 16500 0.01 1850 11000 111000
86 GEOTEXTILE FABRIC, TYPE V SY 16500 130 11000 114,30000
87 SElECT GRANULAR BORROW (CV) CY 9750 1400 1000 8DDD 1112,00000
88 AGGREGATE BASE, CLASS 5 TN 8100 8.00 60D 5000 14D,OOO 00
89 AGGREGATE BASE, ClASS 5 - SIDEWALKS AND DRIVEWAYS TN 1000 13.00 $000
90 TYPE LV4 WEARING COURSE MIXTURE (B) - DRIVEWAYS TN 375 9200 1000
91 TYPE LV 3 NON WEARING COURSE MIXTURE (B) TN 1625 5515 1000
92 TYPE LV 3 WEARING COURSE MIXTURE (B) - 2010 TN 1125 6170 1000
93 BITUMINOUS MATERIAL FOR TACK COAT - 2010 GAL 825 215 $000
94 SAW AND SEAL TRANSVERSE JOINTS IN BITUMINOUS WEAR
COURSE -2010 LF 3750 165 $000
95 B618 CONCRETE CURB AND GUTTER LF 7800 884 $0 00
96 SURMOUNTABLE CONCRETE CURB AND GUTTER LF 220 983 $0.00
97 SURMOUNTABLE CONCRETE CURB AND GUTTER- HAND WORK LF 100 1530 $0 00
61609169REQ5.x1s 69
Contract Unit Current Quantity Amount
No. Item Unit Quantity Price Quantity to Date to Date
98 CURB REINFORCEMENT BARS, NO.4 LF 100 093 \0.00
99 INSTALL STEEL PLATE COVERS. BOX CULVERTS ON PEL TIER LAKE
DRIVE EA 2 200000 2 \4,00000
100 CONCRETE FLUME SF 100 S 40 \000
101 6" CONCRETE DRIVEWAY PAVEMENT SY 800 4400 \0.00
102 6" CONCRETE PEDESTRIAN RAMP SY SO 4300 \0.00
103 4" CONCRETE SIDEWALK SY 1010 21.00 $0.00
104 TRUNCATED DOME PANEL SF 60 32.00 $0.00
101 MILL BITUMINOUI CONSTRUCTION JOINT LF 200 410 $000
106 TOPSOIL BORROW (LV) CY 2110 200 $0.00
107 SODDING, lAWN TYPE SY 13410 261 $000
108 TURF REINFORCEMENT MAT SY 10 910 $0.00
109 SEGMENTAL RETAINING WALL SF 1710 1600 $0.00
110 CONITRUCT RAIN GARDEN SF 12100 3 II $0.00
111 SEEDING, INCt MNDOT SEED MIX 270 AND EROSION CONTROl
BLANKET, CATER GORY 3, BIOOEGRADABlE NETTING SY 1350 125 $0.00
112 GRADING AND SHAPING BEHIND THE CURBlINE. TYPE I AND II
IMPROVEMENT AREAl ONLY LS 1 100 $0.00
113 CATCH BAliN PROTECTION EA 23 5000 23 $1,15000
114 STREET SWEEPER (PICKUP BROOM W/OPERATOR) HR 25 8000 4.25 1375 $1,10000
TOTAL PART 2B. TYPE I, II, AND III IMPROVEMENTS . PELTIER lAKE DR & CENTERVllLE RDAREAS: $348,80000
PART 3. ClEARWATER DRIVE" DIRECTIONAL DRill WATER MAIN AND SERVICES:
115 SALVAGE AND REINSTAll MAILBOX EA 2 75.00 $0.00
116 REMOVE BITUMINOUS PAVEMENT SY 600 300 300 $900.00
117 REMOVE CONCRETE CURB AND GUTTER LF 100 600 $0.00
118 SALVAGE AND REINSTALL IRRIGATION LINES IF 100 3.00 $000
119 SALVAGE AND REINSTALL IRRIGATION HEADS EA 5 90.00 $000
120 ADJUST EXISTING SANITARY SEWER MANHOLE FRAME AND
RING CASTING EA 600.00 $0.00
121 GROUT EXISTING STRUCTURE, INCl DOGHOUSES, INVERTS,
BENCHES EA 1 90.00 $0.00
122 SAWING BITUMINOUS PAVEMENT LF 300 3.00 $0.00
123 6" WATER MAIN DIRECTIONAL DRILLED LF 375 30.00 375 $11,25000
124 6" GATE VALVE AND BOX EA 1 1100.00 1 $1,100.00
125 HYDRANT WITH VALVE EA \ 410000 1 $4,10000
126 DUCTILE IRON FITTINGS lB 350 3.00 300 300 $900.00
127 CONNECT WATER SERVICE TO EXISTING PLUMBING INSIDE
HOME EA 3 SOO.OO 3 $1,50000
128 1" CORPORATION STOP WITH 8" SADDLE EA S 300 00 5 $1,50000
129 1" CURB STOP AND BOX EA S 300 00 5 $1,50000
130 1" WATER SERVICE DIRECTIONAL DRILLED. MAIN TO CURB
STOP LF 350 2200 300 $6,60000
131 1" WATER SERVICE DIRECTIONAL DRilLED. ClIRB STOP TO
HOME LF 2S0 2800 300 $8,40000
132 IMPROVED PIPE FOUNDATION, PER 6" INCREMENT WATER
MAIN LF 50 500 $000
133 AGGREGATE 8ASE, CLASS 5 TN 250 12.00 30 $360.00
134 TYPE LV4 WEARING COURSE MIXTURE (B). DRIVEWAYI TN 2S 11000 $0.00
13S BITUMINOUS PATCHING. STREET, TYPE LV 3 NON WEARING
COURSE MIXTURE (B) TN 100 76.00 $0.00
136 BITUMINOUS PATCHING. STREET, TYPE LV 3 WEARING COURSE
MIXTURE (B) TN 60 7700 $0.00
137 BITUMINOUS MATERIAL FOR TACK COAT. 2009 GAL 4S 640 $000
138 SURMOUNTABLE CONCRETE CURB AND GUTTER. HAND WORK IF 100 16.00 $000
139 TOPSOil BORROW (LV) CY 50 4.00 $000
140 SODDING. lAWN TYPE SY 200 261 $0.00
141 ITREET SWEEPER (PICKUP BROOM WIOPERATOR) HR 3 8000 $0.00
TOTAL PART 3. CLEARWATER DRIVE. DIRECTIONAL ORILL WATER MAIN AND SERVICES: $38,11000
61609169REQ5x1s ~()
Contract Unit Current Quantity Amount
No. Item Unit Quantity Price Quantity to Date to Date
8 ACCESS ROAD GRAVEL TN 131 800 135 11,08000
9 CREW HOURS HR 21 755.00 21 11.58150
10 DRYING/SEPARATING/HAULING OFFSITE lS 1 1600.00 1 11,60000
TOTAL CHANGE ORDER NO.3 1179,33650
CHANGE ORDER NO.4
1 CLAIM 1 (WO #1349) II 1 3992.00 13,99200
2 CLAIM 2 (WO #4801) lS 1 381.17 138157
3 CLAIM 3 (WO #4222) II 1 2404.26 12.40426
4 CLAIM 4 (WO #4160) lS 1 2699.00 12,69900
6 CLAIM 6 - DEDUCTION FOR ENDING ARRA REQUIREMENTS lS 1 -1100.00 ($1,10000)
7 CLAIM 7 - UNIT PRICE REDUCTION SY 1350 -038 1000
8 CLAIM 8 (WO #1310) lS 1 366072 13,66072
9 CLAIM 9 (WO #3410 AND 3412) lS 1 117801 15,17805
TOTAL CHANGE ORDER NO 4 116,81160
TOTAL PART 1 - PROJECT MANAGEMENT-
TOTAL PART 2A- TYPE I, II, AND III IMPROVEMENTS - PELTIER lAKE DR & CENTERVlllE RD AREAl:
TOTAL PART 2B- TYPE I, II, AND IIIIMPROVEMENTI - PElTIER lAKE DR & CENTERVlllE RD AREAS:
TOTAL PART 3 - ClEARWATER DRIVE - DIRECTIONAL DRill WATER MAIN AND IERVICEI:
TOTAL PART 4 - OFF PROJECT. DIRECTIONAL DRill WATER SERVICES:
TOTAL CHANGE ORDER NO 1
TOTAL CHANGE ORDER NO 2
TOTAL CHANGE ORDER NO 3
TOTAL CHANGE ORDER NO.4
TOTAL WORK COMPLETED TO DATE
147.40000
$296,157.01
$348,80000
$38,110.00
$2,311.00
18,00000
$000
1179,33650
$16,81160
1937,330 11
61609169REQ5xls
!PI
PROJEG PAYMENT STATUS
OWNER CITY OF CENTERVILLE
CITY PROJECT NO. 200901
BONESTROO FILE NO. 000616-09169-0
CONTRACTOR FOREST LAKE CONTRACTING
CHANGE ORDERS
No.
Date
Description
Amount
1 4/20/2009 This Change Order provides for additional work on this project. See $8,000.00
Change Order
2 5/21/2009 This Change Order provides for additional work for this project. See $67,895.7S
Change Order
3 5/29/2009 This Change Order provides for additional work on this project. See $173,220.50
Change Order
4 8/20/2009 This Change Order provides for adjustments to this project. See $16,302.60
Change Order
Total Change Orders $265,418.85
PAYMENT SUMMARY
No. From To Payment Retainage Comoleted
1 05/04/2009 05/19/09 38,952.10 2,050.11 41,00221
2 OS/20/2009 06/17/09 257,763.97 15,616.64 312,332.71
3 06/18/2009 07/15/09 187,869.30 25,504.49 510,08986
4 07/16/2009 08/20/09 300,355.56 41,312.68 826,253.61
I 5 08/21/2009 09/21/09 105,522.67 46,866 51 937,330.11
Material on Hand
Total Payment to Date $890,46360 Original Contract $1,534,085.11
Retainage Pay No. 5 46,866.51 Change Orders $ 265,41885
Total Amount Earned $937,330 11 Revised Contract $1,799,503.96
61609169REQS,xls
01-
CONTRACTOR"S cut" T
FOR YOUR FILE
#
Bonestroo
Owner: Citv of Centerville, 1880 Main 51., Centerville, MN 55038 Date'. SeptembN 21, 2009
For Period: 8/21/200910 9/21/2009 Request No: 5
Contractor: Forest Lake Contractino, 14777 Lake Dr, Forest Lake, MN 55025
CONTRACTOR'S REQUEST FOR PAYMENT
2009 STREET IMPROVEMENTS
BONESTROO FILE NO 000616-09170-0
CITY PROJECT NO. 2009.02
SUMMARY
1 Original Contract Amount
2 Change Order - Addition
3 Change Order - Deduction
4 Revised Contract Amount
5 Value Completed to Date
6 Material on Hand
7 Amount Earned
8 Less Retainage 5%
9 Subtotal
10 Less Amount Paid Previously
11 Liquidated damages -
12 AMOUNT DUE THIS REQUEST FOR PAYMENT NO.
$ 1,351)3725
$ 51,30716
$ 000
$ 1,403,04441
$ 666,49936
$ 000
$ 666,49936
$ 33,32497
$ 633,17439
$ 584,156 78
$ 0.00
5 $ 49,01761
Recommended lor Approval by:
BONESTROO
~A-
Approved by Contractor'
FOREST LAKE CONTRACTING
Approved Dy Owner:
CITY OF CENTERVILLE
Specified Contract Completion Date
Date
61609170REQ5xJs
63
Contract Unit Current Quantity Amount
No, Item Unit Quantity Price Quantity to Date to Date
PART 1 "PROJECT MANAGEMEN1:
1 MOBILIZATION lS ZZOOO,OO 0,8 117,60000
2 TRAFFIC CONTROL lS 4000,00 OS 12,00000
TOTAL PART 1 - PROJECT MANAGEMENT: 119,60000
PARl 2 " TYPE III & IV IMPROVEMEN1S:
3 TEMPORARY ROCK CONSTRUCTION ENTRANCE TN SO 1500 $000
4 51l T FENCE, MACHINE SLICED IF 1700 040 1252 1500,80
5 REMOVE BITUMINOUS PAVEMENT SY 29300 2,00 3342 26000 152,00000
6 REMOVE CONCRETE CURB AND GUTTER IF ZZ50 4,00 99 2700 110,80000
7 REMOVE BITUMINOUS DRIVEWAY SY 375 4,00 10,00
8 REMOVE CONCRETE DRIVEWAY PAVEMENT SY 50 500 21 46 1230 00
9 REMOVE STORM SEWER PIPE IF 100 8,00 18 18 114400
10 REMOVE TREE EA 10 9500 7 1665,00
11 REMOVE STORM SEWER CATCH BASIN MANHOLE EA 4 300,00 4 11,20000
12 BOLT REPLACEMENT - HYDRANT AND GATE VALVE EA 15 110000 lS 116,SOOOO
13 BOLT REPLACEMENT - GATE VALVE EA 24 400,00 18 17,20000
14 SALVAGE AND REINSTALL IRRIGATION LINES IF 250 JOO 10,00
lS SALVAGE AND REINSTAll IRRIGATION HEADS EA 10 80,00 $0,00
16 ADJUST EXISTING CURB BOX EA 10 11 000 1110,00
17 ADJUST EXISTING VALVE BOX EA 23 300,00 1000
18 ADJUST EXISTING SANITARY SEWER MANHOLE FRAME AND
RING CASTING EA 39 SOOOO $000
19 ADJUST EXISTING STORM SEWER CATCHBASIN FRAME AND
RING CASTING EA 7 300 00 2 $600 00
20 ADJUST EXISTING STORM SEWER CATCHBASIN MANHOLE
FRAME AND RING CASTING EA 16 600,00 S 13,00000
21 RECONSTRUCT SANITARY MANHOlE LF 11 300,00 4 8 12,40000
ZZ RECONSTRUCT EXISTING VALVE BOX EA 7 30000 1000
23 GROUT EXISTING STRUCTURE, INCl, DOGHOUSES, INVERTS,
BENCHES EA 25 250,00 $0,00
24 SAWING BITUMINOUS PAVEMENT IF 775 300 753 $2,25900
25 5AWING CONCRETE PAVEMENT IF 50 400 100 120 $480 00
26 MILL BITUMINOUS CONSTRUCTION JOINT IF 300 JOO $000
27 REMOVE EXISTING 18" TRASH GUARD EA 1 60,00 $0,00
28 ClEAN EXISTING STORM PIPE LF 300 5,00 $0,00
29 CONNECT TO EXISTING STORM 5EWER STRUCTURE EA 1 600,00 $600,00
30 CONNECT TO EXISTING RCP STORM SEWER EA 5 60000 $600,00
31 INSTALL 18" TRASH GUARD ON EXISTING FLARED END SECTION EA 1 35000 $000
32 15" RCP FLARED END SECTION, INCL TRASH GUARD EA 2 800,00 2 11,60000
33 12" RCP STORM SEWER, CLASS 5 IF 135 3000 128 13,840,00
34 15" RCF STORM SEWER, CLAS5 5 IF 365 noo 47.5 406 113,39800
3S 18" RCP STORM SEWER, ClASS 5 IF 48 36,00 1000
36 ClASS III RANDOM RIPRAP CY 70 70,00 18 $1,26000
37 2' X 3' C8, INCL R-3067-V CSTG AND CONC ADJ RINGS EA 3 1600 00 3 14,80000
38 4' DIA STORM SEWER CBMH, INCl, R-3067-V CSTG AND CONC
ADJ RINGS EA 1800,00 6 $10,80000
39 CONSTRUCT 4' DIA CBMH OVER EXISTING STORM SEWER PIPE,
INCl R-3067-V CSTG AND CONC ADJ RINGS EA 1 2500,00 1 12,50000
40 CONNECT DRAINTILE TO EXISTING STORM STRUCTURE EA 42 18000 6 36 16,480 00
41 4" PERFORATED POLYETHYLENE DRAINTllE PIPE WITH SOCK
WRAP IF 3500 300 302 3400 110,20000
42 4" PERFORATED POLYETHYlENE DRAINTILE PIPE WITH COARSE
FilTER AGGREGATE, GEOTEXTILE WRAP, AND SOCK WRAP IF 12400 800 6355 11554 $92,432,00
43 IMPROVED PIPE FOUNDATION, PER 6" INCREMENT - STORM
SEWER LF 300 500 1000
44 COMMON EXCAVATION (EV) CY 5000 700 114 4000 \28,00000
45 COMMON EXCAVATION (EV) , STORM SEWER CROSSINGS CY 4500 001 -1401 1548 $1548
46 SUBGRADE EXCAVATION (EV) CY 2000 700 259 259 $1,813 00
61609170REQSxls ~1
Contract Unit Current Quantity Amount
No. Item Unit Quantity Price Quantity to Date to DatE!
47 TOlERANCE ClASS S - TYPE IV IMPROVEMENTS ONL Y IF 6500 250 1400 4160 $10,400 DO
48 SUBGRADE PREPARATION - STREET SY 10900 0.01 4996 $49.96
49 GEDTEXTllE FABRIC, TYPE V SY 10900 140 8000 $11,20000
50 SELECT GRANULAR BORROW (CV) CY 7000 1200 400 4000 $48,000 00
51 AGGREGATE BASE, ClASS 5 TN 5150 800 1263 7000 $56,00000
52 TYPE lV4 WEARING COURSE MIXTURE (B) - DRIVEWAYS TN 225 77 00 $000
53 TYPE l V 3 NON WEARING COUR5E MIXTURE (B) TN 3975 4750 1000 1000 $47,50000
54 TYPE LV 3 WEARING COURSE MIXTURE (B) - 2009 TN 2850 4B.00 $000
55 BITUMINOUS MATERIAL FOR TACK COAT - 2009 GAL 1850 US $0.00
56 SAW AND SEAL TRANSVERSE lOINT5 IN BITUMINOUS WEAR
COURSE - 2009 IF 6700 UO $0.00
57 CONCRETE CURB AND GUTTER IF 2250 1400 2106 $29,48400
58 CUR8 REINFORCEMENT BARS, NO.4 IF 1120 050 240 $120.00
59 6" CONCRETE DRIVEWAY PAVEMENT SY 55 4000 25 $1,00000
60 TOPSOIL BORROW (lV) CY 400 1200 112 $1,34400
61 SODDING, LAWN TYPE SY 2300 4 DO 463 $1,85200
62 TURF REINFORCEMENT MAT SY 50 12.50 $0.00
63 TRANSPLANT TREE - PINE EA 7 150.00 $0.00
64 TRANSPLANT TREE - DECIDUOUS EA 1 15000 $15000
65 SEGMENTAL RETAINING WAll SF 1750 1700 $0.00
66 CONSTRUCT RAIN GARDEN SF 8500 375 6DO 8000 $30,00000
67 SEEDING, INCl MNDOT SEED MIX 270 AND EROSION CONTROL
BLANKET, CATERGORY 3, 810DEGRADABLE NETTING SY 950 190 $000
68 DITCH EXCAVATION - 7JRD STREET, NORTH OF EXISTING
FLARED END SECTION LF 50 3iOO $000
69 CATCH BASIN PROTECTION EA 18 50.00 18 $900 00
70 STREET SWEEPER (PICKUP BROOM W/OPERATOR) HR 35 BOOO 45 17 $1,36000
TOTAL PART 2 - TYPE III & IV IMPROVEMENTS: $515,78724
PART 3 . TYPE V IMPROVEMENTS - CLEAR RIDGE, GRANGE VIEW, BRIAN WAY, BRIAN DRIVE, AND FOX RUN AREAS:
71 REMOVE BITUMINOUS PAVEMENT SY 1975 300 1500 $4,50000
72 REMOVE CONCRETE CURB AND GUTTER LF 750 400 1000 1237 $4,94800
73 REMOVE BITUMINOUS DRIVEWAY SY 150 4.00 $000
74 REMOVE BITUMINOUS PATH SY 20 4.00 $000
75 REMOVE STORM SEWER PIPE IF 80 8.00 $0.00
76 SALVAGE AND REINSTALL IRRIGATION LINES IF 100 300 $0.00
77 SALVAGE AND REINSTAll IRRIGATION HEADS EA 5 8000 $000
78 BOlT REPLACEMENT. HYDRANT AND GATE VALVE EA 9 110000 8 $8,80000
79 BOLT REPLACEMENT - GATE VALVE EA 9 500.00 9 $4,500 DO
80 SALVAGE AND REINSTAll MAilBOX EA 5 100 DO $000
Bl ADJUST EXISTING VALVE BOX EA 9 400 00 $000
82 ADJUST EXISTING SANITARY SEWER MANHOLE FRAME AND
RING CASTING EA 13 50000 $000
83 ADJUST EXISTING STORM SEWER CATCHBASIN FRAME AND
RING CASTING EA 3 300 00 $000
84 ADJUST EXISTING STORM SEWER CATCHBASIN MANHOLE
FRAME AND RING CASTING EA 6 60000 $000
85 GROUT EXISTING STRUCTURE. INCl DOGHOUSES, INVERTS.
BENCHES EA 5 30000 -376 $0.00
86 SAWING BITUMINOUS PAVEMENT IF 1500 3 DO 376 376 $1,128 DO
87 Mill BITUMINOUS CONSTRUCTION JOINT IF 185 300 $000
88 EDGE Mill BITUMINOUS 6' WIDE IF 7850 080 $000
89 CLEAN EXISTING STORM PIPE LF 200 500 $000
90 CONNECT DRAINTILE TO EXISTING STORM STRUCTURE EA 14 16000 $000
91 4" PERFORATED POLYETHYlENE DRAINTllE PIPE WITH SOCK
WRAP IF 300 300 141 $423.00
92 COMMON EXCAVATION (EV) - STORM SEWER CROSSINGS CY 5500 001 1156 $11 56
93 SUBGRADE EXCAVATION (EV) CY 1200 700 $000
94 GEOTEXTllE FABRIC. TYPE V SY 1750 140 1461 $2,04540
61609170REQ5xls ~6
Contract Unit Current Quantity Amount
No, Item Unit Quantity Price Quantity to Date to Date
95 SELECT GRANULAR BORROW (CV) CY 350 1800 559 110,06200
96 AGGREGATE 8A5E, ClAS5 5 TN 950 1500 500 $7,50000
97 AGGREGATE BA5E, CLASS 5 - SIDEWALKS AND DRIVEWAYS TN 75 22 00 61 61 11,34200
98 TYPE LV4 WEARING COURSE MIXTURE (B) - DRIVEWAYS TN 30 8200 $000
99 BITUMINOUS PATCHING - STREET, TYPE LV 3 NON WEARING
COUR5E MIXTURE (B) TN 575 6100 $0.00
100 TYPE LV 3 WEARING COURSE MIXTURE (B) - 2009 TN 1475 4800 $000
101 BITUMINOUS MATERIAL fOR TACK COAT - 2009 GAL 875 175 $000
102 CONCRETE CURB AND GUTTER Lf 750 1400 $0.00
103 CURB REINfORCEMENT BARS, NO 4 Lf 300 0.50 $000
104 6" CONCRETE PEDESTRIAN RAMP SY 10 4100 $000
105 4" CONCRETE SIDEWALK 5Y 130 nOD $0.00
106 TRUNCATED DOME PANEL 5f 12 40.00 $0.00
107 TOPSOIL BORROW (LV) CY 150 18.00 10.00
108 SODDING, LAWN TYPE SY 1000 5.00 $0.00
109 STREET SWEEPER (PICKUP BROOM W/OPERATOR) HR 10 80.00 $0.00
TOTAL PART 3 - TVPE V IMPROVEMENTS - CLEAR RIDGE, GRANGE VIEW, 8RIAN WAY, BRIAN DRIVE, AND fOX RUN
AREAS: $45,25996
PART 4 - BACKYARD DRAINAGE IMPROVEMENTS - BRIAN DRIVE, BRD STREET, AND QUEBEC STREET AREAS:
110 CLEAR AND GRUB AND REMOVE LANDSCAPE, BRIAN DRIVE
AREA LS 1 2000.00 $2,00000
111 REMOVE TREE - QUEBEC STREET AREA EA 4 95.00 $0.00
112 SALVAGE AND REINSTALL IRRIGATION LINES Lf 200 300 $0.00
113 SALVAGE AND REINSTALL IRRIGATION HEADS EA 10 80.00 $0.00
114 SALVAGE AND REINSTAll fENCE If 775 1000 $000
115 DITCH EXCAVATION Lf 110 3300 $000
116 CONSTRUCT 4' DIA STORM SEWER MH OVER EXISTING STORM
SEWER PIPE, INCl R-1642-B CSTG AND CONC AD) RINGS EA 240000 $2,40000
117 6" PERfORATED PVC DRAINTlLE PIPE, SCHEDULE 40, WITH
COARSE fiLTER AGGREGATE AND GEOTEXTILE WRAP - QUEBEC
STREET AREA LF 800 2400 7BO $18,72000
118 6" PERFORATED PVC DRAINTILE PIPE, SCHEDULE 40, WITH
COARSE FILTER AGGREGATE AND GEOTEXTllE WRAP - BRIAN
DRIVE AREA LF 515 28.00 500 500 $14,000.00
119 6" PERFORATED PVC DRAINTILE PIPE, 5CHEDULE 40, WITH
COARSE FilTER AGGREGA TE AND GEOTEXTILE WRAP - 73RD
STREET AREA LF 175 2800 175 14,900 00
120 6" PVC 90 DEGREE BEND EA 7 2000 8 $16000
121 6" X 6' PVC TEE EA 10 30.00 $0.00
122 6' PVC ClEANOUT EA 7 74000 8 11,92000
123 6" YARD DRAIN EA 12 140.00 $000
124 6' RODENTCAP EA 2 2200 2 2 144.00
125 5" BLACK POLYETHYLENE LAWN EDGING LF 300 5.00 $0.00
126 1 1/2" WA5HED RIVER ROCK CY 100 60.00 100 100 $6,00000
127 CLA5S III RANDOM RIPRAP CY 16 80.00 15 15 11,20000
128 TOPSOIL BORROW (LV) CY 45 3000 55 100 13,00000
129 SODDING, lAWN TYPE SV 2500 400 1315 $5,26000
130 fiNAL GRADING AND SHAPING BACKYARD5 - 13RD STREET
AREA SY 450 100 157 $15700
131 FINAL GRADING AND SHAPING BACKYARDS - QUEBEC STREET
AREA SY 1150 100 1158 $1,15800
132 FINAL GRADING AND SHAPING BACKYARDS - BRIAN DRIVE
AREA SY 900 100 $000
TOTAL PART 4 - BACKYARD DRAINAGE IMPROVEMENTS - BRIAN DRIVE, 73RD STREET, AND QUEBEC STREET AREAS 160.91900
61609170REQ5x1s
!,t
Contract Unit Current Quantity Amount
No. Item Unit Quantity Price Quantity to Date to Date
ALTERNATE NO.1 - FUNDING AGENCY REQUIREMENTS:
133 ADDITIONAL COMPENSATION NEEDED IF FUNDING AGENCY
REQUIREMENTS ARE ADDED TO THE JOB lS 14000.00 114.000.00
TOTAL ALTERNATE NO 1 - FUNDING AGENCY REQUIREMENTS 114,00000
CHANGE ORDER NO.1
1 CLAIM 1 t-NO #3629) LS 1 B2914 1 IB2914
2 CLAIM 2 t-NO #5346) LS 1 106.00 1 110600
3 CLAIM 3 t-No #4215) LS 1 770.65 1 $770.65
4 REMOVE CONCRETE CURB AND GUTTER (TYPE III AND IV STREETS LF 2000 4.00 2000 18.000.00
5 CONCRETE CURB AND GUTTER (TYPE III AND IV STREETS) IF 2000 1400 $0.00
6 REMOVE CONCRETE CURB AND GUTTER (TYPE V STREETS) LF 1000 4.00 1000 $4,00000
7 CONCRETE CURB AND GUTTER (TYPE V STREETS) LF 1000 1400 $0 00
B CEASING ARRA REQUIREMENTS LS 1 -3000.00 1$3,00000)
9 HYDROSEEDlNG IN LIEU OF WOOD FIBER BLANKET SY 950 -O.3B $000
10 HYDROSEEDING IN LIEU OF SOD SY 2300 -0.55 $000
11 CLAIM 11 t-No #3409) LS 1 227.3) $227.3)
TOTAL CHANGE ORDER NO.1 $10,93316
TOTAL PART 1 - PROJECT MANAGEMENT:
TOTAL PART 2 - TYPE III & IV IMPROVEMENTS
TOTAL PART 3 - TYPE V IMPROVEMENTS - ClEAR RIDGE, GRANGE VIEW, BRIAN WAY, BRIAN DRIVE, AND FOX RUN
AREAS:
TOTAL PART 4 - BACKYARD DRAINAGE IMPROVEMENTS - BRIAN DRIVE, 73RD STREET. AND QUEBEC STREET AREAS
TOTAL ALTERNATE NO.1 - FUNDING AGENCY REQUIREMENTS:
TOTAL CHANGE ORDER NO 1
TOTAL WORK COMPLETED TO DATE
$19,60000
$515,78724
$45,25996
$60,919.00
$14,00000
$10,93316
$666,499.36
61609170REQ5.x1s
!o1
PROJECT PAYMENT STATUS
OWNER CITY OF CENTERVILLE
CITY PROJECT NO, 200902
BONESTROO FILE NO, 000616-09170-0
CONTRACTOR FOREST LAKE CONTRACTING
CHANGE ORDERS
No. Date DescriptIOn Amount
1 8/20/2009 This Change Order provides for adjustments to this project. See $51,30716
Change Order.
Total Change Orders $51,307.16
PAYMENT SUMMARY
No. From To Payment Retainage Completed
1 05/04/2009 05/19109 17,622.50 92750 18,550,00
2 OS/20/2009 06/17/09 102,97620 6,347,30 126,946,00
3 06/18/2009 0711 5/09 194,88521 16,604.42 332,08833
4 07116/2009 08/20/09 268,672,87 30,74509 614,901.87
5 08/21/2009 09/21/09 49,01761 33,324,97 666,49936
Material on Hand
Total Pavment to Date $633,17439 Original Contract $1,351,73725
Retainaqe Pay No, 5 33,324,97 Change Orders $51,30716
Total Amount Earned $666,499,36 Revised Contract $1,403,044,41
61609170REQ5x1s
hi
Sept 23, 2009
To: Centerville City Council
From: Tom Lee
Subject: Resignation
Due to increased professional and familiar obligations, I find that I am no
longer able to dedicate the kind oftime and energy that I feel the position of
Council member demands.
Regretfully, I feel the appropriate thing to do, is to resign my position as
Council member to allow another individual with more availability to serve
this community to the degree our citizens deserve.
It has been my honor and privilege to serve this community in this capacity
and I will forever be grateful for the opportunity.
Please accept my resignation effective at the conclusion of the September 23
regularly scheduled Council meeting.
Respectfully,
Thomas A. Lee
--~~(1-~
q ~~/09