HomeMy WebLinkAbout2009-09-23 Hatem Q
September23,2009
Hatem Qamhieh
7251 Clearwater Drive,
Centerville, MN 55038
Honorable Mayor and City Council
City of Centerville
1880 Main Street
Centerville, MN 55038
Dear Mayor and coundl:
I appreciate your time to let me present to you what is going on Clearwater Drive in Centerville since
the construction started on 2009 5treet and Utility Improvement Project #000616-07158-0.
On July 15, 2009, I contacted Dallas larson by phone to let him know what is going on and what
Forest lake Construction, Inc. is doing on Clearwater Drive (Please see the email I sent to Dallas
larson on Friday, July 17, 2009).
On Friday, July 31, 2009, Oty Engineer Mark 5tatz called me back after several attempts to connect
with each other. I discussed with him the situation on Clearwater Drive and informed him that Forest
lake Construction, Inc. using the Cul-De-Sac as full staging area for their construction resulted in
total damage for the road surface. Mark mentioned to me that he had visited the Clearwater Drive
two weeks before our conversation and he is going to send a letter to every body on the cul-de-sac
that next year they will do Fog and Seal for the road. I told him that the damage is ten times worse
since your observation two weeks ago and I recommended for him to do mill and over lay for the
road. Mark responded that it will be too expensive for the contractor to do that.
Forest lake Construction, Inc. staged the project on the cul-de-sac with poor coordination from the
beginning of the project. They excavated the middle of the cul-de-sag and the hydrant location eight
times.
Now we are at the end of September and the damage on Clearwater Drive is above and beyond since
my conversation with Mark on July 31. The Forest lake Construction, Inc. kept using the cul-de-sac
as staging area for their project from driving their heavy equipments and parking th~m on the road
such as bulldozers, scrapers, compactors, hauling trucks, water trucks which all have 'very high axel
load. They used the road to store their aggregates, such as sand, class 5 aggregate, top soils and
sand resulting in scraping the surface of the pavement when they try to use the material for the rest
of the project. Also they stored the stonm sewer pipes on the cul-de-sac.
I addressed only the basic things related to the problem. I would appredate knowing any planed
action to store the road to its original condition.
Please feel free to contact me at my home, telephone # 651-653-6643, if you have any questions
regarding this letter.
5~~~. _
~~hieh, P.E.
Page 1 of 1
.
HATEM QAMHIEH
From:
To:
Cc:
Sent:
"HATEM QAMHIEH" <qamh1hat@q.com>
<dlarson@centervillemn.com>
<qamh1 hat@q.com>
Friday, July 17, 2009 11 :00 AM
Good Morning,
I just want to thank you for your time you spent with me on the phone on July 15 regarding the construction on
Peltier Lake Drive and Clearwater Drive.
Yesterday, on July 16 Forest Lake Contracting cleaned all the material (Storm Culverts, Sand, Class 5 Aggregate,
Excavation Material and Water Main Pipe) from the Cull De-Sac. I checked the road surface conditions on
Clearwater Drive when I got home from work yesterday; I noticed visible significant damage to the road surface
on Clearwater Drive for using the road as Staging area for the project using large equipment and heavy truck
load to do their job. I would appreciate if you let me know if the Qty or the contractor going to fIX these visible
damage's.
Thanks,
Hatem Qamhieh
7251 Clearwater Drive
Centerville, MN 55038
9/22/2009
.
2335 Highway 36 W
51. Paul, MN ssm
101651-636-4600
Fax 651-636-1311
VNfW.bonE!Stroo.com
,
,
\.
February 27, 2008
\
... Bonestroo
Honorable Mayor and City Council
City of Centerville, Minnesota
1880 Main Street
Centerville, MN 55038-9794
'~
'I V'
t.~ if
}.~
,
Re: 2009 Street and Utility Improvements Project
Public Open House Feedback
80nestroo File No.: 000616-07158-0
Dear Mayor and Council:
The purpose of this letter is to outline the main issues voiced at the February 21, 2008 public open house
and possible steps the council could take to continue working with the public to reach a consensus on the
appropriate scope for the proposed 2009 Street and Utility Improvement Project.
I
The public open house began at 6:00 p.m. with a short presentation at 7:00. Following the presentation a
question and answer formatted discussion began. The following is our summary of the major discussion
topics from the meeting:
Q: Can't this project wait? This is generally a bad time for burdensome assessments due to current
economic conditions.
A: If the council is committed to providing water to all its residents by 2012, the water main and
service installation portions of this project should move forward.
Additionally, D and E type improvements are being done to protect the City's investment in the
existing street subbase and bituminous base, respectively. Delaying these improvements would be
detrimental to those streets resulting in higher life cycle costs.
Type C 1 improvements could be delayed because we have determined that there is no salvage
value left in the existing bituminous or gravel subbase. Delaying these improvements does not
increase the lite cycle costs as long as people are willing to tolerate their existing condition and the
City is able to maintain reasonably safe driving conditions without extensive maintenance costs.
Some Type Cl improvement areas are imbedded in other improvement classifications. Delaying
these few areas would necessitate driving heavy trucks and other construction equipment across
the other improvements when the Type Cl work is completed in the future. For this reason and
for the general continuity of the project, we would recommend that these' imbedded" areas of
Type Cl improvements remain in the scope of work for 2009. This is shown graphically on the
attached figures.
City of Centerville
2009 5tneet and Utility Improvements Project
Page 2
February 27. 2008
Some residents indicated that they would be less opposed to the project with different timing. The
City could consider a short (1-5 year) deferment of their assessments. This may be possible if a
bond could be structured such that payments could be city-paid for the first few years, and
assessment funded towards the end of the bond. This would ailow the residents to effectively
"ride-out" fluctuations in the economy and begin payments at a later date when economic
conditions may be more favorable.
Q: Is an $8 million project irresponsible for a town this size, especially at this time?
A: If the recommendations presented herein are followed, the remaining project is estimated at $6.6
million a difference of approximately $1.3 million. Much of that reduction would be City
participation items. Since no water main would be eliminated (assessed at 100%), and most of
the work eliminated would be road work (assessed at a much lower percentage), this would
significantly cut the City's portion of the project costs. It would be our recommendation to plan for
the work eliminated from this project for construction in 2014.
Q: Our street is in decent condition; does it need these improvements right now?
A: As stated above, we feel strongly that Type D and E improvements are time sensitive and are
needed now to avoid further deterioration of the street. Type C improvements, because they
cannot get any worse, could wait as long as residents will tolerate their existing condition and the
City is able to maintain reasonably safe driving conditions without extensive maintenance costs.
Q: Can other Type B improvement areas (Mill Rd. N. of Prairie Dr., Robin In. Area. Clearwater Dr..
Pehier lk. Dr.) consider alternative water main installation techniques (boulevard. back yards.
directional drilling) to avoid ripping up a decent street as was considered on Center St?
. A: Mill Road. North of Prairie Drive - We still feel strongly that this section of roadway should be
urban section (curb). However, if the water main was installed in the boulevard, the street
subbase could be salvaged, perhaps decreasing the costs in this area. The section could then
be classified as a D3 Type improvement.
Robin Lane Area - Members of the public suggested installing the water main down the rear
yard lot lines. Several issues are raised by this suggestion:
. Construction easements would need to be obtained from all residents since the backyard
easements are a total of only ten feet wide.
. A number of fences and mature trees would have to be removed.
. The risk of a water main break flooding a home would need to be considered.
. The City would have to strictly enforce the easement restrictions, ensuring nothing is
planted or constructed within the easement.
. Winter access may be problematic in the event of a water main break since the area
would not be plowed. .
This decision should be carefully considered and made in close consultation with the Public Works
Staff. We would not re,ommend ,hanging the scope of work in this area.
Clearwater Drive - Originally, it was the desire of the Public Works Department to reduce the
size of this cul-de-sac in an effort to minimize maintenance costs and to reduce runoff. Coupled
with the addition of water main, this necessitated reconstruction of the roadway. Several residents
of this area are opposed to changes in the size of the cul-de-sac. If the cul-de-sac was not
. .
.
Oly of CenteMlle
ZOO9 Street and Utilily Improvements Project
Page 3
February Z7, Z008
changed, the water main may be able to be directionally drilled and services tapped out of one
access point in the center of the sac. This style of water main installation may allow the street to
forego reconstruction. This could be changed to a Type A 1 improvement.
Peltier Lake Drive (CSAH 14to Centerville Road) - This area has a narrower right-of-way
(50' vs. 60' or 66') and steeper boulevards necessitating the water main to be installed in the
roadway. Additionally, we feel strongly about the need for the reconstruction of this roadway with
a standard City section including curb and gutter due to its poor condition. We feel that this need
for reconstruction is independent of the water main installation. We would not recommend
changing the scope of work in this area.
Peltier Lake Drive (Between Peltier Circle) - This area has a 60-foot right-of-way allowing
the water main to be installed in the boulevard. However, we feel strongly about the need for the
reconstruction of this roadway with a standard City section including curb and gutter due to its
poor condition. We feel that this need for reconstruction is independent of the water main
installation. We would not recommend changing the scope of work in this area.
Peltier Lake Drive (Centerville Road to Mill Road excluding area between Peltier
Circle) and Centerville Road (North of development break) - This area was previously
included within the C 1 improvement type. These are small areas that require a full reconstruction
with new curb and gutter due to their deteriorating condition. Water main already exists in these
areas. For clarification purposes another Type B improvement category could be created for further
distinction and more accurate costs. This could be then be dassified as a 82
improvement.
Q: Could the scope of our road improvements be reconsidered? Can we meet with the engineer to
discuss our street's proposed improvements?
A: . We stand behind our recommendations with regard to the scope of work needed on streets not
affected by water main work. As discussed above, the timing of some of the improvements could
be reconsidered. The Council should consider authorizing meetings between engineering staff and
residents on a per street basis in order to address outstanding concerns about specific street
improvements.
Q: Can the City hire another engineering !inn to look at Bonestroo's recommendations?
A: The City paid $10,000 to Braun Intertec to take soil borings and produce a signed engineering
report complete with recommended street sections. Those recommendations align with
Bonestroo's recommendations.
Q: Why are some people allowed to wait until2012 to hook to City water while we are being forced
to do so by2010?
A: City ordinance identifies two requirements for the City water system.
1. All residents must be connected by 2012.
2. Residents must connect within one year of water service being made available to them.
The City could consider enforcing the 2012 connection year in order to maintain enforcement
consistency throughout the City.
tervi{{e
'Estab[isfietf 1857
Feasibility Study
2009 Street and Utility Improvement Project
City of Centerville
March 2008
Project Number: 000616-07158-0
#' Bonestroo
2335 Highway 36 W
St Paul, MN 55113
Tel 651-636-4600
Fax 651-636-1311
www.bonestroo.com
March 26, 2008
.. Bonestroo
Honorable Mayor and City Council
City of Centerville
1880 Main Street
Centerville, MN 55038-9794
Re: 2009 Street and Utility Improvements
City of Centerville
Bonestroo File No.: 000616-07158-0
Dear Mayor and Council:
We are pleased to present the Feasibility Report for the 2009 Street and Utility Improvements Project. This
project was first contemplated by the 2003 Pavement Management Study. The report updates the findings
of that study and examines in greater detail the proposed improvements and estimated costs.
The report finds that the improvements are necessary, cost effective and feasible. This report is required
under Minnesota Chapter429 if the project is to be specially assessed in any amount.
Sincerely,
BONESTROO
Mark Statz, PE
City Engineer
651-604-4709
I hereby certify that this plan, specification, or report
was prepared by me or under my direct supervision
and that I am a duly licensed Professional Engineer
under the laws of the State of Minnesota.
Mark Statz, PE
Date: March 26. 2008
Reg. No. 42717
Centerville Road 140' North of Lakeland Cir Peltier Lake Drive 575
Clear RidQe Mill Road CDS 0Nl 1260
Clearwater Drive' Peltier Lake Dr CDS (S) 310
Fox Run Peterson Trail CDS 525
Fox Run Brian Drive Peterson Trail 720
GrainQeview 40' North of CDS CDS (S) 150
Grainoeview Clear RidQe 40' North of CDS 180
Hayfield Road Peterson Trail Mill Road 740
Houle Circle Peterson Trail CDS 660
Ivv Court Center Street CDS(N) 420
Lavalle Drive' Centerville Lake 120' SWof CSAH 14 530
Mill Road Main Street 600' North of Main St 825
Mill Road 600' North of Main St Prairie Dr 895
Mill Road Prairie Drive Dead End (N) 915
Mound Trail' Cttv Border 1200' NE 1200
Mound Trail' 1200' NE of Citv 80rder CSAH 14 1650
Peltier Lake Drive CSAH 14 Dead End (E) 2500
Peltier Lake Drive . Peltier Circle Peltier Circle 600
Peltier Lake Drive Centerville Road Peltier Circle - West Leo 380
Peltier Lake Drive Peltier Circle - East Leo Mill Road 370
Peterson Trail CSAH 14 Fox Run 1600
Peterson Trail Prairie Drive 73rd Street 290
Prairie Drive Mill Road CDS(E) 1300
Robin Lane N W Robin Lane 20th Avenue N 525
Robin Lane S 20th Avenue N W Robin Lane . 525
Robin Lane W N Robin Lane S Robin Lane 500
Sumac Court Center Street CDS(S) 420
Twin Lakes Avenue 73rd Street 72nd 1/2 Street 670
Unitv Avenue 72nd and 1/2 Street CDS (N) 700
. DOES NOT INCLUDE ANY STREET WORK. ONLY UTILITY WORK IS PROPOSED.
The streets analyzed in this feasibility study have been separated into five sections to better illustrate the
detail of the proposed improvements. A map with these sections highlighted is shown in Figure 1.
EXISITING CONDITIONS
The streets being analyzed in this study are at various points in their Iifecycle and are in need of varying
degrees of improvement based on a lifecycle cost analysis. Many factors play into the condition of the
streets including the following:
. Surface and Subsurface Drainage
. Street Section (exist. thickness of bituminous and gravel)
. Subgrade soils
. Amount and Type ofT rafflc
. Age of Pavement
. Maintenance throughout the Lifespan
City ofCenterville
2009 Street and Utility Improvement Project
.. Bonestroo
" Project No: 616-O7~158-O
Page 4
In June and July of 2007, Bonestroo, along with City Staff, did a thorough inspection of all streets identified
for the study and their respective existing conditions. Since ratings based on the PASER (PAvement Surface
Evaluation and Rating) System were established in 2003, this inspection focused on updating those findings
and identifying new deficiencies of individual streets and utility needs. In March of 2008, further inspection
of the proposed streets was done by City and Bonestroo Staff. The timing of this inspection allowed
measurements of the frost heave to be made. The following summarizes the quantitative information used
in the analysis of the existing condition:
. 2003 PASER findings
. July 2007 Visual inspection of the pavement surface
. March 2008 Frost heave measurements
. November 2007 Braun Intertec Geotechnical Report (soil borings)
Based on these metrics, the proposed streets were categorized based on the recommended levels of repairs
needed.
PROPOSED IMPROVEMENTS
The improvements proposed for each street were based on the existing conditions observed in the walking
inspection and whether or not the area required the installation of new water main. Several areas
throughout town do not currently have City water main, but do have fully developed streets with City
Sewer. The addition of water main to some of these areas will necessitate the full reconstruction of the
street regardless of the condition of the existing pavement. This is due to the urban topography, the width
of the existing right-of-way. the number of water services required and the lack of adequate permanent
easements.
Many options and iterations were considered in order to optimize the proposed improvements for these
sections. In other words, make sure that work is not done unnecessarily. These improvements can be
divided into five primary categories:
A. WATER SYSTEM IMPROVEMENTS ONLY:
The area shown as "Section 1" in Figure 1 includes the extension of water main to the end of Mound Trail.
This work would be confined to the north boulevard and should not affect the roadway. Services would be
directionally drilled under the roadway to avoid pavement impacts. No road improvements are proposed for
this area.
The homes in this area are not hooked to City water. Water main was extended past some of the homes in
2005, but the residents were not forced to hook to the new main, nor were services from the new main
extended to the property line.
Lavalle and Clearwater Drives, which are shown in "Section 2", also include the extension of water main
from an existing stub. This main along with individual services would be directionally drilled under the
existing roadway. As such, no road improvements would be completed in these areas.
City ofCenterville
2009 Street and Utility Improvement Project
.. Bonestroo
ProjectNo: 616-O7-158"()
Page 6
It is the recommendation of this report to install service lines with a curb stop at the property line for all
homes which are not yet connected to City water. This would include homes in the area where water main
was previously extended as well as homes in the area where new water main is proposed. Services will be
installed via directional drilling technology to avoid impacts to the roadway.
Category A improvements are divided into two types as listed below:
A-' - Extension of new water main and services with no associated road work.
A-2 _ Water main already exists. but new services are proposed. with no associated road work.
B. FULL RECONSTRUCTION OF THE STREET SECTION:
The majority of Category B streets have no remaining salvage value in the existing bituminous or gravel
subbase. In other words. no portion of the road section could be reused in the restoration of the street. A
complete reconstruction of the street section is needed. .
Where curb exists. this will mean full removal and replacement of the curb and gutter along with the street
section. Saving the existing curb. as seen in Category C. was contemplated but proved to be impractical
and not cost effective in these instances. For the same reasons. saving portions of the pavement. or
patching, also proved to be counterproductive.
The largest factor in the lack of salvage value of these streets is drainage issues in the subbase. Therefore.
the proposed improvements include additional catch basins and storm sewer where it is both needed and
reasonably feasible. Additionally, in the areas where there is currently no existing curb, such as Peltier Lake
Drive. concrete curb and gutter will be constructed which will improve the drainage of the street and
consequently the subbase.
In the Robin Lanel Cardinal Drive area there is remaining salvage value to the roads. However, the road
improvement type is dictated by the addition of water main in this dense neighborhood. Options involving
the drilling of water main were explored in order to determine if it was possible to supply this neighborhood
with water without having to fully reconstruct the road. Two options were examined. Option one would be
to directionally drill the main within the existing front yard utility easement. The second would be to drill the
main within the utility easement in the backyards. These options were ruled out due to the following
prominent issues:
Front yard easement
. The homes within this area have smaller setbacks than in other areas. This would make the area
harder to work in and therefore add cost to the project.
. The yards. driveways. and landscaping within the easement would suffer extensive disturbance and
need to be replaced.
. The "runs" are too short to make directional drilling cost effective.
City of CenterviUe
2009 Street and Utili,ty Improvement Project
.. Bonestroo
Project No: 616-07-158-0
Page 7
2335 Highway 36 W
SI. Paul. MN SS113
Tel 651-636-4600
Fax 651-636-1311
www.bonestroo.com
June II, 2008
.. Bonestroo
Dallas Laf50ll
Administrator
City of Centerville
1880 Main Street
Centerville, MN 55038
Re: 2009 Street and Utility Improvements
Engineering Scope and Fee Proposal
City of Centerville
Bonestroo File No.: 000616-7158-0
Dear Dallas:
Thus far, we have submitted two short letter proposals which were subsequently approved by !he City
Cound!. The first authorized us to complete a Feasibility Report, the second authorized the Preliminary
Survey and some initial design work. Those three tasks have been completed. Additionally, we have done
some work ancillary to these tasks as changes in the project scope have developed induding exploration
and associated cost estimating for: the abandonment of lift Station 3, inclusion of water services between
the curb box and home, and well abanadonment. We have also prepared for, attended and performed
follow-up tasks for numerous public open houses, on-site neighborhood resident meetings, Council
workshops and offidal City Coundl meetings relating to the project
Having now refined the scope of this project to something with which the council is comfortable, it may be
appropriate to authorize the preparation of plans and specifications along with some other pre-bid work.
This letter is to serve as the scope and fee proposal for that work as described herein. If the Council wishes,
they could also authorize the advertisement for bids, or they could wait for that action until after the plans
have been prepared and approved.
~
The scope of the work leading up to the bid is divided into several categories.
SI. Paul
SI. Cloud
Roche51er
Milwaukee
Chicago
.
Final Scope Cost Estimates
City of Centerville, Minnesota
2009 Street and Utility Improvement Project
6/1112008
# Bonestroo
Average
Concrete Curb & Sanitary Sewer Watermain Storm Sewer Street Maintenance Cost
ODtiDn Street Name From To CIllMnth 1ft \ Sidewalk Cost Gutter Cost. Re irs Cost Cost.. Re irs Cost Construction Cost Per LF Total Cost
FULL RECONSTRUCTION
B' Peltier Lake Drive CSAH 14 Dead End (E) 2500 $28,320.3t $70,900.00 $42,600.00 $ 1 44.300.00 $81,000.00 $411,500.00 $330.00 $778,620.3 1
B' Peltier Lake Drive Peltier Circle Peltier Circle 600 $6,796.88 N/A $10,300.00 $33,800.00 $23,000.00 $ 139,600.00 $330.00 $213.496.B8
B' Centerville Road 140' North of Lakeland Cir Peltier Lake Drive 320 $3,625.00 $9,100.00 $3,900.00 N/A $21,600.00 $86,600.00 $380.00 $ 124,B25.00
B' Peltier lake Drive Centervi/Ie Road Peltier Circle - West Leq 380 $4,304.69 $ 1 0,800.00 $2,200.00 N/A $21,600.00 $101,100.00 B80.00 $ 1 40,004.69
FULL DEPTH RECONSTRUCT
(' Brian Wav Brian Drive 275' East of Brian Drive 275 $3,115.23 N/A N/A $3.400.00 $ 13,500.00 $6B,900.00 $250.00 $88,915.23
(' Centerville Road 140' North of Lakeland Cir Peltier Lake Drive 575 $6,513.67 N/A $3,900.00 $3,400.00 $21,600.00 $89,300.00 $250.00 $ 1 24.713.67
(' Grainneview 40' North of CDS CDS(S) 150 $ 1,699.22 N/A N/A $ 1.700.00 $21,600.00 $49,800.00 $250.00 $74,799.22
FULL BITUMINOUS R&R
0' 72nd Street UnitY Avenue Brian Drive 1050 $11,894.53 N/A $ 1 ,400.00 $6,800.00 $24,300.00 $107,100.00 $ 130.00 $151,494.53
0' Brian Drive 7200 Street 300' North of 73rd St 2080 $23,562.50 N/A N/A $6,800.00 $24,300.00 $181,300.00 $ 130.00 $235,962.50
0' Twin Lakes Avenue 73rd Street 7200 1/2 Street 670 $7,589.84 N/A N/A $3,400.00 $8,100.00 $76,200.00 $ 130.00 $95,289.84
0' Peterson Trail Prairie Drive 73rd Street 290 $3,285.16 N/A N/A $ 1.700.00 $0.00 $28,300.00 $0.00 $33,285.16
0' Prairie Drive Mill Road CDS (E) 1300 $14,726.56 N/A $700.00 $6,800.00 $ 1 6, 200.00 $114,100.00 $0.00 $ 152, 526. 56
0' Unilv Avenue 72nd and 1/2 Street CDS(N) 700 $7,929.69 N/A N/A $3,400.00 $8,100.00 $66.700.00 $0.00 $86,129.69
0 72nd 1/2 Street Unity Avenue Twin Lake Avenue 360 $4,078.13 N/A N/A $3,400.00 $8,100.00 $38,600.00 $0.00 $54,178.13
EDGE MILL & OVERLAY
E 8rian Drive (SAH 14 72nd Street 660 $7476.56 N/A N/A N/A $0.00 $47 900.00 $90.00 $55376.56
E Brian Wav 275' East of Brian Drive CDS(S) 560 $6,343.75 N/A N/A N/A $0.00 $28,600.00 $90.00 $34,943.75
E Clear Ridne Mill Road CDSrN) 1260 $14273.44 N1A $ 10700.00 N/A $ 13, 500.00 $63 600.00 $90.00 $102073.44
E Fox Run Brian Drive Peterson Trail 720 $8 156.25 N/A N/A N/A $0.00 $38000.00 $90.00 $46 156.25
:f'Pplies only where no cu or.9u.tter existed before reco~ction 16640 1 988.28 $101 300,00 $B99OO.00 $263800.00 $364 600.00 $2084000.00 $3,088 588.28
All costs over and above a 6 diameter are financed by City Trunk Fund