Laserfiche WebLink
A Gem Lake land owner noted that the currentcity administration of Gem Lake is most talented and does <br />not need to be recognized by building a city hall and asked if the money could be spent on something else. <br />He noted that the school district is in dire straights and the money could be used forchildhood education. <br />He also questioned about the location of the proposed building noting that it would be better to have it <br />around Hoffman Road and Highway 61. This would provide for marketability :if necessary. <br />Artig-Swomleyasked about the plans for the building's driveways. Mark Sweet explained that one-half of <br />the Goose Lake Road right-of-way is still intact and that the other one-half has been vacated to the Town. <br />She asked what soft costs would be involved. It was noted that soft costs will include architectural fees; <br />legal fees; furniture; tight fixtures, etc: The Township's current video equipment for recording and <br />cablecasting meetings will be moved to the Town/City Hall facility. <br />Mayor Emeott closed the . Public Hearing. <br />Public Notices: Mayor Eineott reported thatthere are no public notices. <br />COMMITTEES. REPORTS: <br />RESOLVED: Motion by Watson, Second by Schilling to accept the Planning Commission Report was <br />unanimously approved. <br />RESOLVED: Motion by •Artig-Swomley, Second by Schilling to accept the City Treasurer's Report was <br />unanimously approved. <br />City Hall ./ Town Hall Construction Data: Mark Sweet, Gem. Lake. residentlConstruction. Manager, <br />reviewed and described the cooperative. effort between the. City ofGem Lake and White Bear Township for <br />this new building. He reviewed: the site plan for the proposed building. reporting. that the building. has. been <br />placed •to maximize. natural lighting, accessibility and expansion.. The driveway will be off of Otter Lake . <br />and Goose. Lake.Road. The :clusters of trees will be retained with only a few trees and some scrub which <br />need to be removed for the building pad. The building will be slab on grade: It will be handicapped <br />accessible..Storm Water drainage and water Ireatment will be done by use of a rain garden; which utilizes <br />natural plantings to..absorb the water. and remove: sediment. <br />The exterior elevations of the. building were reviewed, The: building will .be built utilizing LED <br />(Leadership in Energy & Environmental Design) guidelines.. He reviewed the niain.level floor plan of the <br />proposed building,. He noted that there will be a large lobby which can • serve. as an assembly area for <br />people waiting to:.go into or coming out of the large Meeting. morn. .This .large meeting room will serve as <br />the City Council's meeting hall. White Bear Township will also use • the building for their Town Board <br />.meetings from November 2007 to. April 2008, during the time that their •Old Town Hall. is .moved •and <br />restored. The. new building will also serve as the permanent location for the polling place for the Town's <br />41-"precinct. A City of Gem Lake administration office and a reception desk will be off the lobby. A <br />smaller Meeting room for smaller group meetings is also planned on the NW end. of the building. The <br />Ramsey County Sheriffs Department will .have an office/sub-station in the• building. This substation will <br />have access off the lobby with a separate entrance, Will be soundproofed, and will be available on a 24 <br />hours, basis: The. building will utilise vaulted ceilings. There will be two heating zones to provide control <br />for heating either unused or iirLuse portions of the building. A kitchenette, bulletin board. and display area <br />•will. be off the lobby. .A restroom area is also planned off the lobby. The restroom Will be larger than <br />• norrnal•due to. codes. for public. use facilities and Will be handicapped accessible. <br />RESOLVED: Motion by. Artig-Swoniley and Second. by Schilling to approve continued work on the City <br />Hall / Townhall construction was unanimously approved. <br />New Business <br />RESOLVED: Acceptance of Resolution 2007-05:. Motion by Schilling: and Second by Watson to <br />approve Resolution 2007-05 to authorize the sale of a General Obligation Capital Improvement PIan Bond <br />