My WebLink
|
Help
|
About
|
Sign Out
Home
2008 09-16 CCP
GemLake
>
CITY COUNCIL
>
PACKETS
>
2000 - 2009
>
2008
>
2008 09-16 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2026 3:04:46 PM
Creation date
7/22/2019 8:23:54 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
AGENDA PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
Show annotations
View images
View plain text
TABLE 2-2-A - GRADING PLAN REVIEW FEES <br />50 cubic yards (38.2 m3) or less No Fee <br />51 to 100 cubic yards (40 m3 to 76.5 m3) $ 23.50 <br />101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) $ 37.00. <br />1,001 to 10,000 cubic yards (765.3 m3 to 7645.5 m3) $ 49.25 <br />10,001 to 100,000 cubic yards (7646.3 m3 to 76 455 m3) - $49.25 for the first <br />10,000 cubic yards (7645.5 m3), plus $24.50 for each additional 10,000 yards <br />(7645.5 m3) or fraction thereof. <br />100,001 to 200,000 cubic yards (76 456 m3 to 152 911 m3) - $269.75 for the first <br />100,000 cubic yards (76 455 m j, plus $13.25 for each additional 10,000 cubic <br />yards (7645.5 m3) or fraction thereof. <br />200,001 cubic yards (152 912 m3) or more - $402.25 for the first 200,000 cubic <br />yards (152 911 m3), plus $7.25 for each additional 10,000 cubic yards (7645.5 <br />m3) or fraction thereof <br />Other Fees: <br />Additional plan review required by changes, additions or revisions <br />to approved plans (minimum charg_e - one-half hour) $ 50.50/hr <br />TABLE 2-2-B - GRADING PERMIT FEES1-2 <br />50 cubic yards (38.2 m3) or less $ 23.50 <br />51 to 100 cubic yards (40 m3 to 76.5 m3) $ 37.00 <br />101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) - $37.00 for the first 100 cubic <br />yards (76.5 m3) plus $17.50 for each additional 100 cubic yards (76.5 m3) or <br />fraction thereof. <br />1,001 to 10,000 cubic yards (765.3 m3 to 7645.5 m3) - $194.50 for the first 1,000 <br />cubic yards (764.6 m3), plus $14.50 for each additional 1,000 cubic yards (764.6 <br />m3) or fraction thereof. <br />10,001 to 100,000 cubic yards (7646.3 m3 to 76 455 m3) - $325.00 for the first <br />10,000 cubic yards (7645.5 m3), plus $66.00 for each additional 10,000 cubic <br />yards (7645.5 m3) or fraction thereof. <br />100,001 cubic yards (76 456 m3) or more - $919.00 for the first 100,000 cubic <br />yards (76 455 m3), plus $36.50 for each additional 10,00.0 cubic yards (7645.5 <br />m3) or fraction thereof. <br />Other Inspections and Fees: <br />1. Inspections outside of normal business hours $ 50.50/hr <br />(Minimum charge -two hours) <br />2. Reinspection fees assessed $ 50.50/hr <br />3. Inspections for which no fee is specifically indicated $ 50.50/hr <br />(Minimum charge - two hours) <br />, <br />i ne tee for a grading permit authorizing additional work to that under a valid permit shall. <br />be the difference between the fee paid for the original permit and the fee shown for the <br />entire project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.