Laserfiche WebLink
Open Cut of Road to Tap Main $6.0.00 <br />Sewer Line Repair Permit <br />Water Connection Charge <br />Water Use Charge <br />Water Tap <br />Underground Sprinkler <br />System Permit <br />Hot Water Boiler Permit <br />$22.00 <br />$650.00 per dwelling unit <br />To be determined by City <br />$60.00 <br />$40.00 + release form <br />$40.00 <br />SECTION 3: MECHANICAL PERMITS <br />All Permits have a $.50 State Surcharge <br />GaslHeati ngNenti lation. <br />Permit <br />Each Gas Appliance <br />Gas Piping <br />1st $500 Valuation <br />Each Add'I $500 <br />Gas Burner Furnace. <br />Heating System <br />Steam/Air/Water <br />Air Conditioning. <br />Ventilation <br />S <br />1t .2,000 CFM. <br />Each Add'i 'I 000 CFM <br />Changeover/Conversion <br />to Natural Gas <br />Maximum Heating Permit <br />New Home <br />$25.00 minimum <br />$20.00 <br />$25.00 <br />$15.00. <br />$40.00 <br />$40.00 <br />$35.00 <br />$25.00 <br />$15.0.0 <br />$50.00 <br />$60.00/85.00 w NC <br />Commercial Heating, <br />Ventilation and A/C Permit Fee is 1% of valuation + a surcharge <br />of .0005 x valuation <br />5 <br />