Laserfiche WebLink
Attachment A <br />1. Preparation of. Construction Plans <br />Greg Anderson Reabar: Abdullah Resident Project Rep. ArilHanson Survey Crew TASK <br />Project Manager Professional Engineer Construction Observation Word Processing TOTAL <br />A. Perform topographic surveyand structure Survey. 1 2 8 <br />B. Prepare construction plans and specifications. 20 <br />C. Coordinate with Rsmsay County and private utilities. 1 <br />D, Review construction plans with City: 2 <br />E. Project advertising and bidding, 4 <br />2. Construction Administration <br />40 <br />4 <br />2 <br />4 <br />2 <br />A. Preconstruction conference & contract administration. 6 2 2 <br />B. On -site construction observation. <br />C. Construction staking, <br />D. Construction administration. 20 <br />D. Prepare "as -built' constnuction.drawings. 1 <br />TOTAL FEE <br />3. S I Ass <br />essment sessmen! .assistance <br />113 <br />A. Assessmentrole preparation assistance. <br />B. Attend special assessment hearing. <br />4 <br />3 <br />2 <br />4 <br />96 <br />2 <br />2 <br />2 <br />8 <br />$ 12,455 <br />$ 17,610 <br />5 30,055 <br />5 1.800 <br />