|
crrY OF GEM LAKE, MINNESOTA
<br />FEE SCHEDULE
<br />1) CONSTRUCTION .PERMITS & INSPECTIONS:
<br />Building Permit - based on
<br />$0-$500
<br />$50 1 - $9,000
<br />$9,0.01 - $25,000
<br />$25,001 - $50,000
<br />$50,001 - $100,000
<br />$100,001 - $500,000
<br />$500.001 $1,000,000
<br />Over .$1,000,000
<br />Bldg. Permit Plan Review
<br />value of construction
<br />$ 125.00
<br />$ I25.00
<br />$ 125.00 + $1 4.00 per $1,000
<br />$ 350.00 + $10.10 per $1,000
<br />$ 602.50 + $7.00 per $1,000
<br />$ 952.50 + $5.60 per $1,000
<br />$3,192.50 + $4.75 per $1,000
<br />$5 567.50 + $3.65 per $1,000
<br />Soil Erosion Control Inspection
<br />Required with each building permit
<br />with activity that disturbs over 1 acre of property
<br />65% of building permit fee
<br />Relocation of Dwelling permit
<br />Demolition permit- Residential
<br />Demolition permit - Commercial
<br />Driveway permits (Asphalt/Concrete)
<br />Grading and Filling permits
<br />400 - 1,000 cubic yards
<br />1,001 to 10,000 cubic yards
<br />10,001 to 100,000 cubic yards
<br />Over 100,000 cubic yards.
<br />$ 100.00
<br />$1,000.00
<br />$ 125.00
<br />$ 350.00
<br />$ 35,00.
<br />$37.00 4 $17.50 per 100
<br />cubic yards over 100
<br />$194.50 + $14.50 per 1,0.00.
<br />cubic yards over 1,000
<br />$325.00 + $66.00 per 10,000
<br />cubic yards over 10,000
<br />$910.00 + $36.50 per 10,000
<br />cubic yards over 100,000
<br />NOTE: Ail grading. and.` filling permits that will disturb greater than 1 acre of land
<br />will alsd.be charged.for a Soil Erosion permit
<br />Grading and Filling plan review
<br />400 to 1,000 cubic yards
<br />1,001 to 10,000 cubic yards.
<br />10,001 to 100,000 cubic yards
<br />100,001 to 200,000 cubic: yards
<br />Over 200,000 cubic yards
<br />$37.00
<br />$49,25
<br />$49.25 - $24.50 per 10,00.0
<br />cubic yards over 10,000
<br />$26.9.75 + $13.25 per 10.000
<br />cubic yards over 100,000
<br />$402.25 + $7.25 per 10,000.
<br />cubicyards over 200,000
<br />Page 1 of 7
<br />Most Recently Amended by Ordinance 107, 511.9/2009
<br />
|