Laserfiche WebLink
South Scheuneman Road Construction <br />Cost Breakdown Summary <br />11 /1f712009. <br />Item Description <br />Amount <br />Comments <br />Construction Costs (Street) <br />$112,9.47,74 <br />Nate: This is a preliminary fatal <br />based on estimated final gty's. <br />Construction Costs (Sanitary Sewer) <br />$43,820:52 <br />Total Construction Costs <br />$156,768.26' <br />SEH Engineering Fee (Street) <br />$27,06.5.00 <br />SEH Engineering Fee (Sanitary Sewer) <br />$3,0.00.00 <br />Total Engineering Costs <br />$30r065.00- <br />Toal Project Costs <br />$186,833.26. <br />Street Assessment <br />Cost <br />$140;012.74 <br />City Contribution <br />-$44,460.0.0 <br />Portion of Ramsey County <br />Turnback Funds <br />Total Street Assessment <br />$95,552.74 <br />Includes SEH Engineering Fee <br />Sanitary Sewer Assessment <br />Cost <br />$46;820,52 <br />City Contribution <br />$0.00 <br />Total Sanitary Sewer Assessment <br />$46,820.52� Includes SEH Engineering Fee <br />