My WebLink
|
Help
|
About
|
Sign Out
Home
1994 06-20 CCP
GemLake
>
CITY COUNCIL
>
PACKETS
>
1990 - 1999
>
1994
>
1994 06-20 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2026 8:59:47 AM
Creation date
6/19/2019 8:19:54 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
AGENDA PACKET CITY COUNCIL
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
Show annotations
View images
View plain text
ATTACHMENT TO PLANNING COMMISSION REPORT OF LTUNE 17, 1994 <br />SUMMARY OF CRITICAL POINTS REGARDING FONTANA DEV. PROPOSAL: <br />1. The proposal requires a change in the master plan for the Vadnais <br />Heights City Center from office/showroom to retail (i.e., it goes against <br />their own previous, thoughtful judgment). <br />2. Retail generates 4 times the traffic of office. <br />3. The Corridor Study raises significant questions regard-ing the <br />ability of the infrastructure to handle further develop-ment, before the. <br />Fontana proposal, and has led to serious soul-searching within Vadnais <br />Heights, to the extent of proposed changes to their goals and objectives. <br />4. With Target open in 1996, traffic on County Rd. E is forecast to <br />increase by 70 to 24,900 vehicles per day (VPD) from 14,600 in 1992.. <br />5. With full development of the E corridor, traffic volume will <br />reach 45,000 VPD (an average of 1 vehicle every 2 seconds, 24 hours per. <br />day!), with peak hour volume of 6,242 (1.7 vehicles per second!) <br />6. While we all respect our engineers and their projections, traffic <br />in the interchange grew by over 12% between the 1991 study and the 1993 <br />review without a City Center! <br />7. There will be 2 more traffic signals to deal with between Hwy. 61. <br />and 135E, and another on Hwy. 61 if you think you can sneak out that way. <br />8. Increased traffic will put enormous pressure on Ramsey County to <br />widen E, which imperils whatever vegetative landscape buffer we have or <br />create, as well as any proposed bike trails. <br />9. All of this adds to the pressure to allow the further en- <br />croachment of commercial zoning in our residential community, <br />specifically along E, contrary to our Comprehensive Plan. <br />10. Any extension/improvement of LaBore Rd. will allow quick access <br />to the interchange and retail areas to a large population in White Bear <br />Lake, creating another traffic issue and further potential development. <br />11. Although Fontana was required to investigate the impact on the <br />natural resources and wildlife at the site, there has been no <br />consideration of the impact of this level of traffic on the large and <br />valuable wildlife populations resident in the two large natural habitats <br />separated by E. namely Gem Lake and the H.B. Fuller wetland. The animal <br />kill will clearly escalate. <br />The Planning Commission feels that the traffic congestion resulting <br />from establishing two very large discount department stores directly <br />opposite one another in Vadnais Center will have a serious negative <br />impact on the quality of life in GL. We feel that the City Council <br />should resolve to protest this development on behalf of its constituents, <br />on the basis of the safety, noise, pollution, and general aesthetics <br />issues raised by this increase in traffic, as well as the inconvenience <br />caused our commuting residents. We feel that there should be time <br />allowed to further digest the Corridor Study information and to formulate <br />an overall plan, with long-term goals, for the entire community <br />surrounding 135E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.