My WebLink
|
Help
|
About
|
Sign Out
Home
2025 03-18 CC Packet
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2025
>
2025 03-18 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2025 9:23:34 AM
Creation date
10/9/2025 9:20:26 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
CITY COUNCIL PACKETS
Destruction
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
Show annotations
View images
View plain text
<br />Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 81 <br />Action <br />Number Jurisdiction <br />Mitigation Action <br />Name <br />What is the problem <br />the action is solving? How does the action solve the problem? <br />Is this a <br />continuing <br />action from <br />2019 plan? <br />Action <br />Status <br />48 Saint Paul <br />Flood Mitigation - <br />Upper Landing <br />Relocating the pump <br />pits for the Upper <br />Landing Feature <br />Fountains solves <br />problems related to <br />flooding, maintenance <br />costs, operational <br />disruptions, safety <br />hazards, and <br />extended downtime, <br />ensuring long-term <br />functionality and <br />safety of the <br />fountains. <br />Upper Landing Feature Fountains (4) - Pump <br />Pit Relocation Yes In Progress <br />49 Saint Paul Flood Mitigation <br />Reduces flooding, <br />improves public <br />safety, minimizes <br />disruptions, and <br />lowers maintenance <br />costs, ensuring long- <br />term resilience for <br />Water Street. <br />Water Street – Due to persistent flooding <br />events, elevate the street in numerous low <br />areas. Finalize plans and complete Yes In Progress <br />50 Saint Paul <br />Flood Mitigation - <br />Watergate Marina <br />This action solves <br />problems related to <br />flooding vulnerability, <br />operational <br />disruptions, high <br />maintenance costs, <br />safety risks, and <br />environmental <br />hazards, ensuring the <br />long-term resilience <br />and safety of <br />Watergate Marina's <br />electrical and fueling <br />systems. <br />Watergate Marina - Define and develop <br />new facility electrical and fueling station <br />systems to protect against annual flooding Yes In Progress
The URL can be used to link to this page
Your browser does not support the video tag.