My WebLink
|
Help
|
About
|
Sign Out
Home
2025 03-18 CC Packet
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2025
>
2025 03-18 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2025 9:23:34 AM
Creation date
10/9/2025 9:20:26 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
CITY COUNCIL PACKETS
Destruction
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
Show annotations
View images
View plain text
<br />Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 85 <br />Action <br />Number Jurisdiction <br />Mitigation Action <br />Name <br />What is the problem <br />the action is solving? How does the action solve the problem? <br />Is this a <br />continuing <br />action from <br />2019 plan? <br />Action <br />Status <br />56 Saint Paul <br />Flood Mitigation - <br />NOAA Data Update <br />This project solves <br />problems related to <br />outdated flood data, <br />inaccurate floodplain <br />boundaries, <br />ineffective mitigation <br />planning, regulatory <br />non-compliance, and <br />higher insurance <br />costs, improving flood <br />risk management and <br />resilience in Saint <br />Paul. <br />Localized NOAA Atlas 14 Map Assessment <br />Update Project - Utilize current data and <br />provide updated assessment for Saint Paul <br />flood plain. Yes Not Started <br />57 Saint Paul <br />Flood Mitigation - <br />Mechanical Gate <br />The mechanical gate <br />prevents water entry, <br />reducing the need for <br />expensive post-flood <br />repairs and clean-up <br />efforts. The <br />mechanical gate helps <br />ensure continuous <br />operations by <br />preventing water <br />intrusion. <br />Mechanical gate used as a levee system to <br />block water from infrastructure No Not Started <br />58 Saint Paul Flood Mitigation <br />Addresses problems <br />related to erosion, <br />structural damage, <br />navigation hazards, <br />maintenance costs, <br />public safety, and <br />environmental <br />protection, ensuring <br />the long-term <br />resilience of the <br />bridge and <br />surrounding area. <br />Raspberry Island - Bridge Deflector Project <br />needed. Develop plan and complete <br />programming and construction Yes Not Started
The URL can be used to link to this page
Your browser does not support the video tag.