Laserfiche WebLink
4815 White Bear Parkway • St. Paul, MN 55110 • Phone 651.771.1000 <br /> 4175 123rd Street • Eau Claire, WI 54729 • Phone 715.831.8752 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />March 18, 2025 <br />Melissa Lawerence <br />C/O City of Gem Lake <br />4200 Otter Lake Rd. <br />Gem Lake, MN. 55110 <br /> <br /> <br /> <br />RE: Generator Installation <br /> <br />We propose to furnish and install all labor, material and permit fees to perform the following electrical <br />installation at the above location. Electrical work is to be done in accordance with local and national electrical <br />codes governing such. <br /> <br /> <br />General Clarifications: <br />• All work to be done during normal business hours 7am-3:15pm M-F <br />• Utility Fees are not included <br />• Generator to be located within 50ft of the CT can <br />• Initial diesel fill included <br />• Generator lead time of 26 to 36 weeks after release <br />• Aluminum conductors for feeders <br />• Tax included <br /> <br />45-KVA Option – 100 amps for building operations <br /> <br />Included: <br />• 45-KVA 3-Phase Natural Gas Generator <br />• 400-amp Nema 3R service rated Automatic Transfer Switch. <br />• Include Saw-Cutting & Replacement of Concrete Sidewalk to Allow for Conduit Run to Generator. <br />• Supply & Install Concrete Pad for Generator <br />• Rework Existing Electrical Panel to be fed from transfer switch <br />• Supply Permit & Inspection. <br />• Locates <br /> <br />Exclusions: <br />• Painting <br />• Premium time <br />• Utility fee’s <br />• Site restoration beyond leveling and seeding <br /> <br />Total Cost 45-KVA Generator: $77,900.00 <br /> <br />