My WebLink
|
Help
|
About
|
Sign Out
Home
2025 05-20 CC Packet
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2025
>
2025 05-20 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2025 9:25:33 AM
Creation date
10/9/2025 9:24:15 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
CITY COUNCIL PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
Show annotations
View images
View plain text
<br />ATTACHMENT B <br /> <br />Description of Public Infrastructure Improvements <br /> <br /> <br />THE PUBLIC INFRASTRUCTURE IMPROVEMENTS CONSIST OF NEW STORM SEWER <br />AND MANHOLES ALONG THE NEW NORTH PROPERTY LINE. SPECIFICALLY, <br />THERE IS A NEW MANHOLE AT THE NEW NORTHWEST CORNER OF THE 3610 <br />HIGHWAY 61 PROPERTY (PARCEL A) OVER THE EXISTING PUBLIC STORMWATER <br />LINE PARALLEL TO HIGHWAY 61. A NEW 21” STORM SEWER PIPE WILL BE <br />INSTALLED HEADING EAST FROM THIS MANHOLE ALONG THE NEW NORTH <br />PROPERTY LINE ON THE 3610 HIGHWAY 61 LOT (PARCEL A) FOR APPROXIMATELY <br />211’ TO THE INTERSECTION OF THE NEW PROPERTY LINE AND THE PREVIOUS <br />PROPERTY LINE. AT THIS INTERSECTION A NEW MANHOLE WILL CONNECT THE <br />NEW STORM SEWER AND THE OLD STORM SEWER ALONG WITH A CONNECTION <br />TO BARNETT’S NEW PRIVATE STORM WATER SYSTEM. ALL WORK IS PER <br />APPROVED PLANS. <br /> <br />THE REASONIBLE ESTIMATED COST OF THIS PUBLIC INFRASTRUCTURE <br />IMPROVEMENT IS FORTY THOUSAND DOLLARS ($40,000.00). <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.