My WebLink
|
Help
|
About
|
Sign Out
Home
2025 07-15 CC Packet
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2025
>
2025 07-15 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2025 9:26:18 AM
Creation date
10/9/2025 9:25:50 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
CITY COUNCIL PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
Show annotations
View images
View plain text
Ordinance No. 129 Municipal Water System Page 2 of 9 <br /> <br />1. The property owner shall be notified that it is the intent of the City to connect the property to the <br />water system andsystem and assess the cost of connection against the property owner. The notice <br />shall be mailed by registered mail to the property address. <br />2.1. <br />3. The cost of the improvement shall include all costs incurred by the City in order to connect the <br />property to the main water line and shall include City permit and connection charges which must <br />be submitted to the Metropolitan Council Environmental Services , if connected to the municipal <br />wastewater system. <br />4.2. <br />3.2. New Structures. All buildings hereafter constructed within the City on property adjacent to a water line or <br />in a platted block through which the municipal water system extends, shall be provided with a connection <br />to the water system before occupancy of the building shall be allowed , or a certificate of occupancy issued. <br /> <br />Section 3. Municipal Water System Charges. A portion of the cost of constructing and maintaining the water <br />system shall be recovered by the imposition of special assessments pursuant to Minnesota Statutes Chapter 429, <br />trunk water facilities charges, and connection charges. <br />1. Trunk Water Facility Charges. The trunk water facility charge shall be collected when the property is <br />platted, subdivided, or otherwise developed. These charges are required to be paid to the City prior to the <br />City accepting the lateral water mains, pipes, and appurtenances constructed by the property owner. The <br />charge is calculated as a lump sum amount determined by multiplying a front foot charge , (as established <br />by the City’s Fee Schedule and adopted by ordinance) times the lineal feet of all streets within or abutting <br />the plat, subdivision or development and shall be computed by the EngineerCity Engineer and paid by the <br />property owner to the City prior to the issuance of any building permit. <br />2.1. <br />3. Connection Charge. A connection charge, as established by the City’s Fee Schedule and adopted by <br />ordinance, shall be collected when housing units are connected to the municipal water system. In addition, <br />before a connection permit will be issued, the City shall determine that one of the following conditions <br />exist: <br />4.2. <br />1. The lot or tract of land to be served by such connection or tap has been specially assessed for the <br />cost of constructing the water main and trunk water systems with which the connection is made; or <br />2.1. <br />3. If no special assessment has been levied for such construction cost, the proceedings for levying <br />special assessments have been or will be commenced and completed in due course; or <br />4.2. <br />5. If no special assessment has been levied, and no special assessment proceedings will be completed <br />in due course, a sum equal to the portion of the cost of constructing the water main and trunk <br />water system, which would be assessable against said lot or tract, has been paid to the City; o rr <br />6.3. <br />4. If none of the above conditions are met, the applicant shall pay an additional connection fee which <br />shall be equal to the portion of the cost of constructing the water main and trunk water system <br />which would be assessable against said lot or tract serviced by the connect ion. Said assessable cost <br />is to be determined by the City Engineer upon the same basis as any assessment previously levied <br />against other property for the water main and trunk water system. If no special assessment has <br />been levied, the assessable cost will be determined upon the basis o f the uniform charge which <br />may have been or which shall be charged for similar tapping or connection with said main and <br />trunk system, determined on the basis of the total assessable cost of the water main and trunk <br />water system, allocated on a frontage basis, plus the cost of service or services. <br />7.5. In the event that the City of Gem Lake is serving a property in an adjacent city or jurisdiction, the <br />connection charge applied by Gem Lake will be in addition to any connection charge required by <br />the city in which the property is located. <br />Section 4. Municipal Water Connection Permits. A permit must be obtained to connect to the water system. The <br />connection permit fee, as established by the City’s Fee Schedule and adopted by ordinance, shall be submitted at the <br />time of permit application. All permits for service installations shall be made by the owner of the property, or their
The URL can be used to link to this page
Your browser does not support the video tag.