My WebLink
|
Help
|
About
|
Sign Out
Home
2025 08-19 CC Packet
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2025
>
2025 08-19 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2025 9:29:58 AM
Creation date
10/9/2025 9:26:19 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
CITY COUNCIL PACKETS
Destruction
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
Show annotations
View images
View plain text
Updated January 2025 – Gem Lake Consolidated Land Use Ordinance No. 131 126 <br /> <br />16. No change in the use or ownership of an approved tower or antenna may be made without the written consent of <br />the City Council. <br /> <br />17. Co-location of antennas upon overhead power line poles or street light poles is encouraged provide the said antenna <br />meets all applicable federal state spacing requirements and inference regulation. <br /> <br />4. Proof of Non-Interference. <br /> <br />1. Each application for construction of a commercial Broadcast or Wireless telecommunication facility shall include <br />either a certified statement that the construction of the tower/antenna, including reception and transmission <br />functions, will not interfere with the radio, television, or other service enjoyed by adjacent residential and non - <br />residential properties. If interference is found after the facility has been built has been erected, the applicant has to <br />solve any problems his equipment has caused, at his cost. <br /> <br />5. Tower Setbacks. <br /> <br />1. Where adjacent parcels are zoned for commercial or industrial uses, setbacks equivalent to those established for the <br />principle structure shall be provided for any tower/antenna. Setbacks equal to the height of the tower shall be <br />established on sites that are adjacent to parcels developed or able to be developed for residential use. <br /> <br />6. Permit Applications and Plan Review. <br /> <br />1. Conditional Use Permit. Applicants for a tower/antenna Conditional Use Permit must file a Conditional Use <br />Permit application with the City of Gem Lake and pay any and all associated fees. <br /> <br />2. Planning Commission/City Council review. All applications for a Broadcast/Telecommunications tower must <br />first be sent to the Planning Commission which shall review the application and may recommend to the City <br />Council approval or denial. The City Council will hold the necessary Public hearing(s) on this matter and will then <br />approve or deny the request. The applicant is responsible for supplying a certified list of the property owners within <br />three-hundred (350') feet of the proposed tower/antenna site and pay all costs for notifying all such parties of the <br />public hearing(s) needed. <br /> <br />7. Exceptions. <br /> <br />1. The following towers and/or antennas supporting structures and antennas are not subject to the restrictions of <br />Section 21 of this Ordinance: <br /> <br />1. Towers and/or antennas identified as “Accessory and Secondary Antennas” in this Ordinance are exempt. <br />All Amateur Radio “Accessory and Secondary” antennas and/or towers must be installed in accordance <br />with instructions furnished by the manufacturer of the tower/antenna. <br /> <br />2. Towers and antennas that are located entirely with a structure that complies with the height, bulk and <br />density and area requirements of the City of Gem Lake Zoning Ordinance and are not visible from the <br />exterior of the structure are also exempt. <br /> <br />3. Towers/antennas for radio/telecommunications equipment owned and operated by the City of Gem Lake <br />are also exempt. <br />
The URL can be used to link to this page
Your browser does not support the video tag.