My WebLink
|
Help
|
About
|
Sign Out
Home
2024 12-17 CC Packet
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2024
>
2024 12-17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2025 9:55:22 AM
Creation date
10/9/2025 9:54:11 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
City Council Packets
Destruction
Permanent
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
Show annotations
View images
View plain text
HVAC Commercial/Industrial Installation ♦ Scheduled Maintenance ♦ 24 hr Service <br /> Energy Management ♦ Design Build Engineering <br /> PROPOSAL <br /> <br />DATE: 12/17/2024 <br />SUBMITTED TO: Melissa Lawrence <br />FROM: Kevin Alger <br />JOB NAME: Boiler Replacement <br />LOCATION: Gem Lake City Hall <br /> 4200 Otter Lake Rd <br /> White Bear Lake, MN 55110 <br /> <br />We propose the following: <br /> <br />We propose to provide labor and material to replace the existing boiler with a new direct replacement Weil- <br />McLain Ultra Series 4 230,00 BTU High Efficiency boiler. The following is included in our scope: <br />• Disconnect and reconnect to existing venting, water piping, gas piping, electrical, & controls. <br />• Reuse existing system glycol. <br />• Furnish and install a new boiler circulating pump and system thermometers. <br />• Furnish and install a new gas pressure regulator. <br />• Recycling of the old unit. <br />• Permit <br />• Startup <br /> <br />COST: $14,485.00 <br /> <br />Excluded: Engineering <br /> Overtime labor <br /> <br /> <br />All material is guaranteed to be as specified. All work to be completed in a workman like manner according to standard practices. Any <br />alteration or deviation from above specifications involving extra cost will become an extra charge over and above the estimate. All <br />agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary <br />insurance. Our workers are fully covered by Workman’s Compensation Insurance. Price is firm for 30 days. <br />AUTHORIZED SIGNATURE: <br />ACCEPTANCE OF PROPOSAL: The above prices, specifications and conditions are satisfactory and are hereby accepted. You are <br />authorized to do the work as specified. Payment will be made as outlined above. <br />AUTHORIZED SIGNATURE: ___________________________ <br /> <br />DATE OF ACCEPTANCE:____________________ <br /> <br /> <br /> <br /> <br /> <br />5114 Hillsboro Avenue North ♦ New Hope, MN 55428 <br /> Phone: (763) 533-3070 ♦ Fax: (763) 533-3464 ♦ www.corporatemechanical.com <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.