My WebLink
|
Help
|
About
|
Sign Out
Home
2024 12-17 CC Packet
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2024
>
2024 12-17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2025 9:55:22 AM
Creation date
10/9/2025 9:54:11 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
City Council Packets
Destruction
Permanent
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
Show annotations
View images
View plain text
Updated January 1, 2025 9 <br /> <br />Administration Fee Comments <br />Administrative Charge $50.00 <br />Copying Documents <br /> 1 to 100 Pages $0.25/page MN Statutes, Section 13.03 <br /> 1 to 100 Pages – Double Sided $0.50/page MN Statutes, Section 13.03 <br /> Over 100 Pages Actual Cost of Data Collection & Copies MN Statutes, Section 13.03 <br />Document Research $100.00/hr Minimum 15 minutes <br />Mailing (Postage) and Packaging of Documents and Plans $40.00 <br />Property Assessment and Searches <br /> Property Assessment Searches $50.00 Per Address/PIN <br /> If needed within 24 Hours $100.00 Per Address/PIN <br />Return Check Charges $30.00 <br />Use of City Professional Services <br /> Outside Consultants (Planner, Engineer, Attorney, etc.) Actual Cost to the City <br /> Zoning Administrator Actual Cost to the City Minimum 1 hour <br />Miscellaneous Fees Fee Comments <br />Burning Permit Refer to the City of White Bear Lake page for permit and fees <br />Comprehensive Plan, Local Water Management Plan, Water <br />Distribution or Sewer Plan $200.00 Per Document plus Postage <br />City Codes or Ordinances As indicated on the front page of said document <br />Land Mining (400 yards or more) $2,500.00, plus $3,000.00 escrow for review <br />Tree & Vegetation Permits When a building permit has not been issued <br /> Per Development/Subdivision $1,500.00 <br /> Escrow for Review $3,000.00 <br /> Per Building Site $250.00 <br /> Escrow for Review $750.00 <br /> <br /> <br />White Bear Township Fees for Services to the City of Gem Lake <br />Flat rate of $95.00 per hour for all services (Accounting Clerk/Receptionist, Building Inspector, Clerk Treasurer, Finance Analyst and Officer, Para Legal Secretary, <br />Planner, Secretary Receptionist, Public Works Director and all public works staff) <br /> <br /> <br /> <br /> <br />Section 13 14 <br /> <br />Other Inspections & Fees <br /> <br />Fee Type Fee Comments <br />Building Plan Check Fee 65% of Building Permit Fee <br />Building Plan Check Fee for Similar Plans 25% of Building Permit Fee <br />Plan Check Fee for Decks / Pergola / Gazebo $50.00 <br />Street Maintenance Escrow – New Residential Construction $800.00 <br />Street Maintenance Escrow – New, Expansion or Addition for Commercial Buildings $5,000.00 <br />Erosion Control Escrow – Residential Construction $1,200.00 <br />Erosion Control Escrow – Commercial $5,000.00 <br />Soil Erosion Control Inspection $200.00 <br />Fire Inspections $100.00 per unit Includes follow-up <br />Inspections Outside of Normal Business Hours $100.00/hr Min Charge 2 Hrs <br />Re-inspection Fees $100.00/hr Min Charge 2 Hrs <br />Investigation Fee Up to the value of the permit with a min of $95.00 <br />State Surcharge – Fixed Fee Permit $1.00 <br />State Surcharge 1,000,000 or less .0005 × Valuation <br /> <br /> <br />Refund Policy <br /> <br />Request for refund must be in writing within 60 days of permit issuance. No more than 50% of the permit fee will be refunded. No refunds for plan review fees. The <br />State Surcharge is 100% refundable. See the Electrical Permits section for information on electrical permit refunds.
The URL can be used to link to this page
Your browser does not support the video tag.