My WebLink
|
Help
|
About
|
Sign Out
Home
2025 02-11 PC Packet
GemLake
>
PLANNING
>
PACKETS
>
2020 - 2029
>
2025
>
2025 02-11 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 10:33:25 AM
Creation date
10/27/2025 10:33:04 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
PLANNING COMMISSION PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
Show annotations
View images
View plain text
<br />Right-of-Way Ordinance No. 113 8 <br />5.i. A fee per radio node less than or equal to 100 maximum watts;watts. <br />6.ii. A fee per radio node over 100 maximum watts; or <br />7.iii. The actual costs of electricity, if the actual cost exceed the foregoing. <br />8. <br />9.3. The standard collocation agreement shall be in addition to, and not in lieu of, the required small wireless <br />facility permit, provided, however, that the applicant shall not be additionally required to obtain a license or <br />franchise in order to collocate. . Issuance of a small wireless facility permit does not supersede, alteralter, <br />or affect any then-existing agreement between the city and applicant. <br />4. Action on Small Wireless Facility Permit Applications. <br />a. Deadline for Action. The city shall approve or deny a small wireless facility permit application <br />within 90 days after filing of such application or within any timeline established by state law. The <br />small wireless facility permit, and any associated building permit application, shall be deemed <br />approved if the city fails to approve or deny the application within the review periods established <br />in this section. <br />b. Consolidated Applications. An applicant may file a consolidated small wireless facility permit <br />application addressing the proposed collocation of up to 15 small wireless facilities, or a greater <br />number if agreed to by a local government unit, provided that all small wireless facili ties in the <br />application: <br />i. are located within a two-mile radius. <br />ii. consist of substantially similar equipment; and <br />iii. are to be placed on similar types of wireless support structures. <br />c. In rendering a decision on a consolidated permit application, the city may approve some small <br />wireless facilities and deny others, but may not use denial of one or more permits as a basis to <br />deny all small wireless facilities in the application. <br />d. Tolling of Deadline. The 90-day deadline for action on a small wireless facility permit application <br />may be tolled if: <br />i. The city receives applications from one or more applicants seeking approval of permits <br />for more than 30 small wireless facilities within a seven-day period. In such case, the city <br />may extend the deadline for all such applications by 30 days by informing the affected <br />applicants in writing of such extension. <br />ii. The applicant fails to submit all required documents or information, and the city provides <br />written notice of incompleteness to the applicant within 30 days of receipt the <br />application. Upon submission of additional documents or information, the city shall have <br />ten days to notify the applicant in writing of any still-missing information. <br />iii. The city and a small wireless facility applicant agree in writing to toll the review period. <br />10.e. <br /> <br /> <br /> <br />Section 58. Permit Fees. The City Council establishes fees for permits, and shall from time to time examine and <br />adjust as needed to conform to the City’s actual costs of regulation, management, degradation, city engineering, and <br />make-ready or construction costs associated with collocation of small wireless facilitiesfees for permits and <br />applications governed by this Ordinance. Said fees shall be in the City Fee Schedule as adopted by Ordinance. <br /> <br />1. Excavation Permit Fee. A fee shall be collected with an application for an excavation permit, and the <br />amount of the fee is determined by the type of excavation proposed: <br />1. Hole excavation: $125.00 <br /> <br />2. Emergency Hole: $55.00 <br /> <br />3. Trench: $125.00 + $70 per 100 lineal feet of trench <br /> <br />2. Obstruction Permits Fee. A fee of $50.00 plus $.05 per lineal foot of obstruction shall be collected with an <br />application for a permit to obstruct a right-of-way. <br /> <br />Formatted <br />Formatted: Font: (Default) Times New Roman, 10 pt <br />Formatted: Normal, No bullets or numbering <br />Formatted: Font: (Default) Times New Roman, 10 pt <br />Formatted: Font: 8 pt, Not Bold <br />Formatted: Font: (Default) Times New Roman <br />Formatted: Font: Not Bold <br />Formatted: Font: Not Bold <br />Formatted: Font: 8 pt, Not Bold <br />Formatted: Font: 10 pt, Bold <br />Formatted: Font: 10 pt <br />Formatted <br />Formatted: Font: 10 pt <br />Formatted: Font: 10 pt, Bold <br />Formatted: Font: 10 pt <br />Formatted <br />Formatted: Font: 10 pt <br />Formatted: Font: 10 pt <br />Formatted: Font: 10 pt <br />Formatted <br />Formatted: Font: 10 pt <br />Formatted: Font: 10 pt <br />Formatted: Font: 10 pt <br />Formatted: Font: 10 pt <br />Formatted: Font: 10 pt
The URL can be used to link to this page
Your browser does not support the video tag.