Laserfiche WebLink
Updated January 1, 2025 9 <br /> <br />Administration Fee Comments <br />Administrative Charge $50.00 <br />Copying Documents <br /> 1 to 100 Pages $0.25/page MN Statutes, Section 13.03 <br /> 1 to 100 Pages – Double Sided $0.50/page MN Statutes, Section 13.03 <br /> Over 100 Pages Actual Cost of Data Collection & Copies MN Statutes, Section 13.03 <br />Document Research $100.00/hr Minimum 15 minutes <br />Mailing (Postage) and Packaging of Documents and Plans $40.00 <br />Property Assessment and Searches <br /> Property Assessment Searches $50.00 Per Address/PIN <br /> If needed within 24 Hours $100.00 Per Address/PIN <br />Return Check Charges $30.00 <br />Use of City Professional Services <br /> Outside Consultants (Planner, Engineer, Attorney, etc.) Actual Cost to the City <br /> Zoning Administrator Actual Cost to the City Minimum 1 hour <br />Miscellaneous Fees Fee Comments <br />Burning Permit Refer to the City of White Bear Lake page for permit and fees <br />Comprehensive Plan, Local Water Management Plan, Water <br />Distribution or Sewer Plan $200.00 Per Document plus Postage <br />City Codes or Ordinances As indicated on the front page of said document <br />Land Mining (400 yards or more) $2,500.00, plus $3,000.00 escrow for review <br />Tree & Vegetation Permits When a building permit has not been issued <br /> Per Development/Subdivision $1,500.00 <br /> Escrow for Review $3,000.00 <br /> Per Building Site $250.00 <br /> Escrow for Review $750.00 <br /> <br />Right-Of-Way Fees Fee Comments <br />Excavation Permit Hole excavation: $125.00 <br />Emergency Hole: $55.00 <br />Trench: $125.00 + $70 per 100 lineal feet of <br />trench <br /> <br />Obstruction Permit $50.00, plus $.05 per lineal foot of obstruction <br />Small Wireless Facility Permit $150.00 <br />Small Wireless Facility - Colocation Agreement $150 per year for rent to collocate on a city structure, plus $25 per year for maintenance <br />associated with the collocation. <br />Monthly fee for electrical service as follows: <br />• $73 per radio node less than or equal to 100 maximum watts. <br />• $182 per radio node over 100 maximum watts. or <br />• The actual costs of electricity, if the actual cost exceed the foregoing. <br />Permit Extensions $55.00 <br />Delay Penalty Fee $60.00 for the first three (3) days of delay, and <br />$10.00 per day thereafter <br /> <br /> <br />White Bear Township Fees for Services to the City of Gem Lake <br />Flat rate of $95.00 per hour for all services (Accounting Clerk/Receptionist, Building Inspector, Clerk Treasurer, Finance Analyst and Officer, Para Legal Secretary, <br />Planner, Secretary Receptionist, Public Works Director and all public works staff) <br /> <br />