My WebLink
|
Help
|
About
|
Sign Out
Home
2025 06-10 PC Packet
GemLake
>
PLANNING
>
PACKETS
>
2020 - 2029
>
2025
>
2025 06-10 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 10:36:58 AM
Creation date
10/27/2025 10:33:45 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
PLANNING COMMISSION PACKETS
Destruction
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
Show annotations
View images
View plain text
Ordinance No. 129 64F Municipal Water and Sanitary Sewer System Page 2 of 11 <br /> <br />All connections to or extensions of the systems shall be in accordance with relevant portions of the <br />Minnesota Building Code, Minnesota Plumbing Code, and City of Gem Lake Standard Details for utility <br />construction. <br />1. <br />1. <br />2. Sanitary Sewer Fund. The City shall maintain on the official books and records of the City a separate and <br />special fund to be designated as the Sanitary Sewer Fund, which shall be held and administered by the City <br />separate and apart from all other funds until the purposes for its creation have been accomplished. <br />2. <br /> <br />Section 4. Connections with Sewer Required. <br />1. Existing Structures. Any buildings presently used or capable of being used for human habitation or in <br />which a toilet or other plumbing facilities for disposal of human waste is installed and located on property <br />adjacent to a sewer main, or in the platted block through which t he system extends, shall be connected to <br />the Municipal municipal Sanitary sSewer Ssystem within one year from the date on which a connection is <br />available to such building. Where the property owner has failed to connect to the sanitary sewer system <br />within ten years or within six months if the septic system fails, the following procedures shall be followed: <br /> <br />1. The property owner shall be notified that it is the intent of the City to connect the property to the <br />sanitary sewer system and assess the cost of connection against the property owner. The notice <br />shall be mailed by registered mail to the property address. <br /> <br />2. The cost of the improvement shall include all costs incurred by the City in order to connect the <br />property to the main sewer line and shall include City permit and connection charges which must <br />be submitted to the Metropolitan Council Environmental ServicesMCES. <br /> <br />2. New Structures. All buildings hereafter constructed within the City on property adjacent to a sewer main <br />or in a platted block through which the Municipal Sanitary municipal Ssewer sSystem extends, shall be <br />provided with a connection to the municipal sewer system for disposal of all human waste before <br />occupancy of the building shall be allowed or a certificate of occupancy issued. <br /> <br />3. Sewer Not Available. Where sewer is not available to a building, the building shall be connected to and <br />deliver waste to an ISTS meeting the requirements of Ordinance 67D. <br />Section 5. Municipal Sanitary Sewer System Charges. A portion of the cost of constructing and maintaining the <br />municipal sanitary sewer systemmunicipal sewer system shall be recovered by the imposition of special assessments <br />pursuant to Minnesota Statute 429, a connection charge, and a sewer availability charge (SAC) collected on behalf <br />of the Metropolitan CouncilMCES. <br />1. Connection Charge and Connection Permits. A connection charge, as determined from time to time by the <br />City’s Fee Schedule as adopted by ordinance shall be collected when properties are connected to the Municipal <br />Sanitary Ssewer sSystem. In addition, before a connection permit will be issued, the City shall determine that <br />one of the following conditions exist: <br /> <br />1. The lot or tract of land to be served by such connection has been specially assessed for the cost of <br />construction of the sanitary sewer main with which the connection is made; or <br /> <br />2. If no special assessment has been levied for such construction cost, the proceedings for levying the <br />special assessments have been or will be commenced and completed in due course; or <br /> <br />3. If no special assessment has been levied, and no special assessment proceedings will be completed in <br />due course, a sum equal to the portion of the cost of construction of the sanitary sewer main which <br />would be assessable against said lot or tract has been paid to the Citycity; or <br /> <br />4. If none of the above conditions are met, no permit to connect to any sanitary sewer main shall be <br />issued unless the applicant shall pay an additional connection fee which shall be equal to the portion of <br />the cost of construction of the said sanitary sewer main which would be specially assessed against said <br />lot or tract served by such connection. Said assessable cost is to be determined by the Engineer upon
The URL can be used to link to this page
Your browser does not support the video tag.