My WebLink
|
Help
|
About
|
Sign Out
Home
2025 07-08 PC Packet
GemLake
>
PLANNING
>
PLANNING COMMISSION
>
PACKETS
>
2020 - 2029
>
2025
>
2025 07-08 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 10:39:40 AM
Creation date
10/27/2025 10:36:59 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
PLANNING COMMISSION PACKETS
Destruction
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
Show annotations
View images
View plain text
Updated June 2025 – Gem Lake Consolidated Land Use Ordinance No. 131 83 <br /> <br />5. Conditional and Interim Use Permits. <br /> <br />1. Purpose and Intent. The City Council may, by resolution, grant Conditional or Interim Use Permits for the uses <br />and purposes described elsewhere in this Ordinance as Conditional or Interim Uses and may, in the granting of <br />such Conditional or Interim Use Permits, impose conditions and safeguards which promote the guidelines set forth <br />in the Comprehensive Municipal Plan and which are in harmony with the general purpose and intent of this <br />Ordinance. <br /> <br />2. Application. An application for a Conditional or Interim Use permit shall be made on a form provided by the City. <br />If the Conditional or Interim Use Permit is to be considered in association with any other building permits, <br />variances, or subdivision, all related applications shall be submitted simultaneously with the Conditional or Interim <br />Use Permit application so as to represent the full intent of the applicant. The application(s) shall be accompanied by <br />a fee payable to the City in an aggregate amount as established in the City’s fee schedule. The application(s) shall <br />state fully all facts relied upon by the applicant and shall be supplemented by suc h maps, plans, or additional data <br />for consideration of the application as required and communicated by the Zoning Administrator. An application <br />will be considered complete on the date the application(s), fee(s), and all supplemental materials requested hav e <br />been received by the Zoning Administrator. As required under Minn. Stat. § 15.99, the City shall act on the <br />application within the 60-day period unless said required period is extended or waived. <br /> <br />1. When reviewing Conditional and Interim Use Permit applications, except those for residential building <br />height, impact on the following criteria shall be reviewed and measured by the Planning Commission <br />and City Council: <br /> <br />1. Adjacent Uses; and <br /> <br />2. Air and Water Quality; and <br /> <br />3. Traffic Generations; and <br /> <br />4. Public Safety and Health; and <br /> <br />5. Area Aesthetics; and <br /> <br />6. Economic Impact on the Entire Area; and <br /> <br />7. Consistency with the Comprehensive Municipal Plan; and <br /> <br />8. Anticipated Duration of the Conditional or Interim Use. <br /> <br />2. Residential Building Heights. When reviewing Conditional Use Permit applications which deal <br />exclusively with residential building heights, the matter shall be forwarded to the Gem Lake Plan <br />Review Commission who shall, in a timely manner, review all such applications in accordance with <br />criteria established and, from time to time, modified . Upon completion of the review, the Plan Review <br />Commission shall forward the application along with its written recommendation to the City Council for <br />consideration and approval or denial at its next regular meeting. No review by the Planning Commission <br />as required in Section 17.5.3 or Public Hearing as required in Section 17.5.4 shall be required for this <br />Conditional Use unless specifically ordered by the City Council. In all such matters, the City Council <br />shall be considered the Board of Appeals. <br /> <br />3. Referral to Planning Commission. The matter along with all related information shall be referred to the Planning <br />Commission which shall review the application(s) and hear the applicant or representative thereof at its first regular <br />meeting following receipt of complete application(s). To ensure preservation of health, safety, and general welfare <br />of the public, the Planning Commission shall have authority to request additional information from the applicant <br />concerning the application or to retain expert testimony with the consent and at the expense of the applica nt <br />concerning the application. The Planning Commission shall review the matter determining the effect of the <br />proposed Conditional or Interim Use on: the Comprehensive Plan; the character and development of the <br />neighborhood and Zoning District; conformance with the Performance Standards and other provisions of this <br />Ordinance; compliance with other applicable law, regulations, and provisions which may affect the Condition al or <br />Interim Use. <br /> <br />4. Public Hearing. In consideration of the application(s), a public hearing shall be held before the Planning <br />Commission or the City Council to receive public comment on the matter. Notice of the public hearing shall be
The URL can be used to link to this page
Your browser does not support the video tag.