Laserfiche WebLink
Exhibit A <br />ELECTRICAL PERMIT FEES — City -of Gem L.ako — January 1, 2020 <br />HOMEOWNERS AND ELECTRICAL CONTRACTORS: Complete an electrical permit form available from the Building <br />inspections Division. Add $1.00 for State sutCharge to total cost of each permit. The fee.is the total of the .listed fees or the total number <br />of inspection trips x $45,00, whichever is'greater. <br />Residential panel. replacement is�$910.06; sub <br />panel $45.00. New service or power supply is: irctiits end Feeders <br />0 to 300 Amp <br />$55:00 <br />0-100 Amp <br />Woo <br />400 Amp <br />$71.60 <br />1Q1460Amp <br />$15,00 <br />500 Amp <br />$8T00 <br />201-300'Amp <br />W-,60 <br />600 Amp <br />$103.00 <br />301-400 Amp <br />$27.06 <br />800 Amp <br />$135.00 <br />401-500 Amp <br />$33.00 <br />1000 Amp <br />$167.00 <br />501-600 Amp <br />$39.00 <br />Add $16.00.for each additional 100•amps Add'$6.00 fbr each additional 100 amps <br />Minimum Fee: Maximum Fee., - <br />Minimum permit fee is $45.00 plus $1,00 Maxmum fee.for.single family dwelling or <br />State surcharge. This 1s for one inspection townhouse not over20d-amps (No max if <br />on€y.. Minimum fee for rough -in and final service is over 200Amps) is $190.00 pi us <br />inspection is.$90,00.ptus.$1.00 State surcharge: $1.00 State:surcharge. Maximum of 2 rough-in's and 1 final <br />inspection. (Failed inspections are an additional $45.00. each) <br />Apartment Buildings <br />Fee per unit of *an apartment or condominium complex is $80.00. <br />This does. not cover service, unit feeders or house panels. <br />Swimming Pools and Hot Tubs $90,00 plus circuits at:$9.00/each, This includes 2 fr)spedions. <br />Additions, Remodels or <br />Basement Finishes $90.00 this include up to 10 circuits and 2 inspections <br />Residential Accessory Structures <br />Traffic Signals <br />Street and Parking.Lot Lights <br />Transformers and Generators <br />Retrofit Lighting <br />Sign Transformer or Driver <br />Low voltage fire alarm, low voltage heating <br />and•air conditioning control wiring <br />Re=Inspection Fee in addition <br />to all other fees. <br />The. Greater of $55.00 for panel plus $9..00 per circuit or $90 for 2 <br />inspections: <br />$8.00 per each.standard. <br />$5.00 per each standard <br />$5 up to 1€7kva, $40.11 to.74kva,. $60 75kva to 299kva, over299kva is <br />$165 <br />$0.85 cents per fixture <br />$9.00 per transformer <br />$0.85 cents per device <br />$45.00 <br />Hourly. rate for carnivals $90.00 <br />Solar fees: <br />okw to 5kw $90 5.1kw to 10kw=. $160 <br />10.1kw to 20kw = $225 20.1kw to 30kw = $300. <br />30:1kw to 4.0kw = $375 40JkW.and larger is $375 plus $25 for each. additional 10kw <br />Electronic:inspection fee for these. items only.; furnace, .air conditioning, bath fan, fireplace or receptacle for water <br />heater vent is $40. <br />Refunds must be.requested in writing. No refunds unless.more than the minimum fee: Refunds are minus the cities 20% handling fee. <br />THE PERMIT FEE IS DOUBLED IF THE WORK STARTS BEFORE THE PERMIT IS ISSUED. <br />