My WebLink
|
Help
|
About
|
Sign Out
Home
2020 10-20 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2020
>
2020 10-20 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2025 11:41:57 AM
Creation date
11/19/2025 11:40:36 AM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
AGENDA PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
Show annotations
View images
View plain text
io/mm <br />Sec, 103E,525 MN Statutes <br />2019 Minnesota Statutes <br />Office of the Revisor of.Statutes <br />103E.525 COXiSTRUCTING AND MAINTAINING BRIDGES AND' d[1LVEIXTS. <br />Auffieotica,te,0 2p <br />Szibdivlslon 1. Hydraulic capacity. A public or private bridge or culvert may not be..onstructed or maintained across or in a <br />drainage system with less hydraulic capacity thanspecified in the. detailed survey report,. except. with the written approval of the. <br />director, if the detailed survey report does not specify. the hydraulic capacity, a public or private bridge or culvert In or.across .a <br />drainage system ditch may not constructed without the .director's approval of the hydraulic capacity. <br />Subd, 2. Road authority responsibility. Bridges and culverts oil public roads required by tha'coristruction or improvement oft <br />drainage project or system rnust.be constructed and maintained by the road authprity responsible forkcaeping the road in repair, except <br />as provided in..this section.. <br />Subd. 3, Notice; charging cost: The auditor shall notify the state and each railroad company,.corporatioh, or political <br />subdivision that they are to construct a required bridge or culvert on a road or right of -way under their jurisdiction, within a <br />reasonable time as stated. in the notice, If the work is not done within the prescribed time, the.drainage authority may order the bridge <br />or culvert constructed as part of the drainage project construction. The cost must be deducted from the damages awarded to the <br />corporation. or :collected, froinit as an assessment for benefits. If the detailed survey, report or viewers' report shows that the <br />construction of the bridge.' or culvert is uccessary, the drainage authority may, by order, retain an amouintto secure the construction of. <br />the bridge or culvert from amounts to be paid to.a railroad, corporation, or political subdivision. <br />Subd. 4. Construction on line behveen two cities. The costs of constructin; a bridge or culvert that is required by construction <br />of a drainage project on. a public road that is not a state trunk highway .on the line between two statutory or home rule charter cities, <br />whether inthe same . couttty,'gr not,.must be paid jointly, in equal shares,.by the cities. The cities shall pay jointly,. in.equal. shares, for <br />the cot of maintaining the l ndac or culvert. <br />$ubd. S. Construction on:toWn acid colsut;-11190.. The. costof constructing and maintaining bridges and culverts on a town or <br />county road:acrgss a drainage system ditch.constructed:61ong.the. boundary line between towns <br />:or counties., with excavated material <br />deposited on the boundary line or within 33 feet of the line, must be. -paid equally by the town of county where the bridge or culvert is <br />located and the other town twcounty adjoining the boundary. <br />History; 1P.90c 327 art q. s 68, ZQ13 c 4. s 11: <br />Q2PY.rJ9hL_Q.2019 by the Revtsor.of Statutes, State of Minnesota. All rights reserved. <br />https://www.rbvisor.mn.gov/statuIi&s/oite/lO3E,625 q11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.