|
General O ual i heat ions,
<br />Allied Blacktop Company offers atone year giulrantec'an workmanshi1) and materials on all scopes of work its ted.below, un[ess clarified. Please con Firm scope of worst
<br />detailed on Bile plan to ass ure.accnracy.AIIiedlilacktop will contact custoiner prior to construction. lVork will be done in a continuous fashion to in inimize.(bfit.tl6t.
<br />eliminate) custaIner.incanvenience: Allied Blacktop Company cnnaarases an on-sitc'.prc cons truction.meeting iFtraflic and staking issues arc a concern. Allied Blacktop
<br />Company is aotrespamihie for localina, repairing or replacing the.follnwift! Privale:utilities,.Parkink'lot Iighis, sprinkler brad, sprinkler.Ibiea; other nun-localed :items
<br />in the:copis truction area, Allied Blacktop k.not Iinble for asphalt areas broken by.equIpritent.during cons t ruction. 0 rocess. Arty dcvintian from orieinal approved scope of.
<br />work will only he completed with custorn er:Ipproval (wriiten change ordnrj. Prior to the, start of work, any obstructions in the construction area 41m11.be rcmpved by
<br />owner. Any delays ntay result in additional cltargc& Construction outside.of this contract resultirat in damage to project area will not % lWcovered under Allied Yvgrranty.
<br />Larch Brisin'Warranh [nFnrmntion and 0ualificatin ns:
<br />While Allied Blacktop Canipany makes:eveiy cMor to provide Gnn pricing on all but- pro .jecis it is innihossiblc to do so on catch basin rccolistructs in that the repair work is under grotuid
<br />and cannot be speciflcal ly ]de ntlfied wit] I'a surface inspection. No work beyond tire, and nnalcnala pricing will preccCd without VCR fication%arid appr#al'by t€te gWIler. Allied Blacktop'
<br />Companv wilt call for. locates is advance a f consirucl ion.
<br />Chili seai War ran tv.lnamnottion and Otialirrcalions:
<br />Quit l€ftcaiiohis: Tic one .yearguarantee does not ind Uneven wen6ng patterns in drive high traffie'arcas,eji posed AXtrcgatc asphalt surfaces, and plovv scraping. Ewessiio:
<br />silt/dirt areas that arc hot. able to be cleaned by reasonablc.incans, niay. hot. adhere properly and resttlt it premature wearing. Heavily slliuicd areas (ic, overhanging tmcs,.Ia1I buildings, etc:}
<br />Inay not properly cure, Low areas oil the.exisdug. asphalt surface ilia! hold water will reduce the lift expectancy of the scat. Sea] c[ial5 ;generally do not adhere well to epoxy striping
<br />nlateria[s. T7ie SpritiF folimv rig a cliip seal application, aflerlhe show. has mehed. may reveal loosened ay r regale :in j rass or.arcas where siipw has lxen piled. slits is i}pleat of a chip
<br />seal.applicarion and a second sweep in dhe spring should be considered at an additional charge (sweeping does not nicluder landscape areas). Weeds and v�cgctation rcnnovai.skill be done
<br />6y oWirer at least I .week prior to conmrucffon. Any areas not accessible. to chip seal rollers will not be warrantied, and arc excluded from the project unless otherwise noted,
<br />slater protruding fronn'tile asphalt. or adjacent amas.Ihat.nui into the seal coat area. MY affect ilia 'perfirmancc.ofIlie: seal coat and will riot: be Warrant led
<br />AdditionaI cliai'ges may apply for remol»Iixation to cojiiplete seat coat.
<br />Specifiral€oust All chip seals experience oil bleeding and aggteg ate tracking.. The pick -alp sweep of exccss.aggre:galc.is gencially'done 4 to wccks afier.apulication. Actual lot
<br />conditions, wcalher, and ollier factors will determine actual swcepinr iinic.ofar cgatc. Polymei9ud oils at low for quicker pickup sweep to minimize ag{ rogioe tracking (} cncrally 2
<br />to •€ weeks]. irog:seals will rnininwc. the aggregate tracking and oil bleeding. All Blnektop Company uses the Standard McLeod. fannula for gauging application rases. Deviationsfront
<br />the ronnula at the custogeer's request Inayresult in a woMinty .waive r, While the.iviNDot fear allow for chip seals to be constricted from May 15 to September I, Late season:
<br />chip seals (starting.Augus 15th) may exhibiI a higher. inci dence ofagwcgate stripping and oil bleeding 'in: ubsequeut seasons: Chip scals will not add structural integrity orcorrecr water
<br />Ilow issues. Chip seal iYuneriai may overlati into curb lines, this should -be considered incidental to the construction:
<br />Application: Clean the.asphait with:a Mechanical Pick -tip style street sweeper; Dispose of svvccpings offsite, AppIV liquid aspiialt at a rate specified on proposal with asphalt
<br />dislributois equipped wills coniputenicd rate of chntrol, Apply cover aggregate at a rate -specified on proposal With a self -pro oclIod cornputcriacd chip spreader: Roll the cover aggregate
<br />with cievenn wheel pneumatic rubber lire rollers. Pick up. sweep e xcess. aggregate. as pereuri» g condiiions.
<br />Seal Chia K Pow Seal IVarranty Information And Oualifir:ltions:
<br />Qualifcadons: "the one year guarantee does not inchide micvct.weanT19 patterns in drive Ianes, high traffic areas, exposed aMcgatc asphalt sur Faces,. and plow scraping, Excessivo
<br />silrldiri areas that arc 'not ablc to be cleaned by rcasonahle tricans, Inay not adhere properly and residt in premature. wearing,. Heavily shaded areas.(iu: overhanging trees; tali building, etc.}
<br />Inay notproperly oure: Low areas on the. existing asphalt surface that hold water will reduce the life expectancyof the seal. Scal coats gcncrally.doi not adhere well to epoxy striping
<br />materials. All q[atlifncaiions, 'specificatiojis; and applications listed in this section. al so apply to fog seals, 7nfl-ic on auicwcd scat coals inaly result immaterial tracking. (All ied not .Icsponsible.
<br />for cl nning).' Weeds and vegetation retnoval shall be done by owner at least I week p:or mconstnlctlon. Water protnldi llg' from the. asphalt or adjacunlareas that ruts Int6 the seal
<br />coat area rnayaffect the perrarrnance ❑fthe scat coat and will not bc.rvarrantied: Additional charges mayapply for remobilization to complete. seal coat.
<br />SpeciRead hhns: Seal coats mnei be appiicd during daylight hours to ensure properappiication and curing. Seal coats generally dry in one to five: hours. It takesseveral additional
<br />hours for proper care, Allowing .traff c oil the produ ci prior to proper cum will insult in premature wear. While seat coals resurface: as well as.a rejuvenate, the seaicr it w•i€I polish off the
<br />top otexposed:aggregate and m drive lanes. Seat coals can be used over the top of chip. seals to. enhance agLTegare adhesion and minrmixc agjuegate tracking and oil bleeding,
<br /># Senlcoating, done after September 1st nnay have a high tendency for excessive or premature wearing and wi11 not be warratitied.
<br />y A1)PIicut ion: C[call asphalt surface to remove dust and loose debris. Apply seal coat per inanufact urer.'s specifications.
<br />Cra ek Seal 1Vii rranh• information and Qualifies tin ns:
<br />Qualificationsr'Ibeone year puarantee does not include previously sraled'cracks that have failed and cannot be routed. Cracks scaled in park ingareas are not. warranfied, No warranty.
<br />on un-muted cracks,
<br />SpecilicaIions. Cracks wider Than 1''- shonld notlroay, not be crack- sealed. AiIfgaior, hairline and block cracks should riot besea[ed and will not he.unless sealing 'these 'cracks is regnested by
<br />caslomer in.wrking-: Alligator, hairline slid. block cracks will riot be rotiled or wants teed. Previously sealed cracks that: have failed or recessed wi11 be. topped off only (rid rout)•. Weeds in:cracks
<br />are to be sprayedrremoved by customer 2 weeks lirior to construction_ Cover paper will bc:used'a[ contractors" discretion.
<br />Application: Rout and seat [tie lanp.itudinal: avid transvcrse "workinr;'.cracks [list are %" wide. or wider uptn I ". Rout cracks %" by '''Wo, Diy and clean the enck i, iih lioi air lance
<br />and/or fprced air.. Seal crack wilh NINDOT spec hotc i;k seal material; Material veils belieated in a nielici egitipped vvith'a donhlc:iackcl 6nilirig sysrcin to prevent scorching
<br />alto oVcrlicatiilg.oflhe »natenal. Include over band as per MINDOT.speciftchafions, Apply ptper cover as tlecessary per contractors` discretipn,
<br />Pjllshjngr}nd Pavfrig►YstrrsBtty_1nfg tit.' it -slid _Qualificidi(Ius,
<br />Qualifications: llle one ycar.j_zraralltee does not:incfilde "frost, wori injr, Toflew ive" cracks or scrapes and ether swfacc damage caused by plows, i ellicics:and equipment. All overlays.
<br />will experience fr6sl cracks, working cracks 'and rcflcctivc.cracks, Settling in'trcrich patches due to sub base.couapactign will not be. warrantied. No warranty on. drop and roil patching.
<br />fate scasol) patching & pavirle may result In rough mix and cold &carets:
<br />Specifeations: PI case informap.A]lied cslii sW:orOffice StaIFofspectfic water flow:concents (if any) prior In construction. Water Itonrissucs may no[. be addresseduriless idenliflied
<br />by owner pripr.to bidding and constniction.Allied Blacklop.Company will slicot.Auations upon request or. if water flow issues are present and identified prior to. construction. No
<br />j,'il rantec:on 10040 water flow finless I.5% pitch can be established:aad inaintained: Asphalt overlays Witt inirror existing parking lot, All icd Blacktop Company. will call for locates in
<br />advance 6fconsinrctidn. Allied Blacktop Company will not responsible for tocating, repairing uMplacing the foil olvirig- Pdvate.utiIitjcs, sprinkler. licad, spnek]crlines, or61her
<br />IninJocatcd iwim in lute coiisllnigtiolt area, Allied Blacktop Company is hot .re.sponsibla for any backfnllingj seed or' sod unless detailed on proposal. Allicd Blacktop Company is riot
<br />responsible. forany'City, State; County, Federal, Watcrslwd or. other permitting unless' detailed on proposal:. Parking snipes aftecwd by asphalt work will col bcrc-stripcd.lrnless qupled.
<br />This conlraclor is.riot liable.for. asphalt. =as broken by uquipinent rio inf; construe (ion .prnccss_ Base n ptaccincri[ is. not: included in the. teiuract Atiless notedoil the proposal. lfbasa
<br />rcplacemein is found to be accessary„replace» lent cost will. be approved by otv ner.prior to caminuing tlne construction process..
<br />Application: Asphalt pROng application detaiis; to be.noted on:proposal if not listed in.this section. Patch; asp] hat t as -spec ifred oil proposal by methods of removc and replace, mill and
<br />patch; skin patch, drop and roll or.infrated patching:or other speeded ntieilnod.
<br />Remote and rcnlacc::Jackhammer, mill, or sawcul straiAlt edge. Remove exisliing.aspinalt:and disposetoll-site, Stabilizeexistitigbase n Weriali histaltasphalt uperspecifind thickness
<br />and cgnpact:
<br />Mili'lild TaLCLMill existing.asplifth to a specified dopth...Clearl milled surface, Apply.CSS 111 lack ihaicrial• Install asphalt ss perspecifined. thickness and compact,
<br />Skin Patch: (lean existing asphalt surface, AppIy.C55lFl lack Inalcriai wlicrl applicable. lns[a11 aspinall liiaterial arad cunipact. (No Wai7anty
<br />Drop and Roll: Install asphalt maiciial and cotnpacl'(NO War{a» ly},
<br />liifmrr a c • (fear existinu asphalt surface. Add asphaltsand fincs as necessary rake to IeVcland compact.
<br />Cnncrete WarrlintV Information snit Qtin IiIII cations:
<br />The one year guarantee does not include '-frostor hairline cracking, scrapes and other surface damage caund by plows, vehicles and equjpmcrit; or concrete spalding or raveling as a.
<br />result of itnnproper salting: ARerOctober 15th col d.weather charges wit iakc effect. A]Iicd is not responsible for concrcre parking bhicks diunaged during the removal process -
<br />Park iilg blocks can lie replaced at a price to be specified prior to installation.
<br />
|