My WebLink
|
Help
|
About
|
Sign Out
Home
2023 08-15 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2023
>
2023 08-15 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 2:15:07 PM
Creation date
12/2/2025 1:33:51 PM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
CITY COUNCIL PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
Show annotations
View images
View plain text
Page 3 Qf'Proposal & Agreement <br />NOTICE. OF. LIEN -."ANY PERSON 0R COMPANY SUPPLYING LABOR OR MATERIALS FOR THIS <br />IMPROVEMENT TO YOUR PROPERTY MAY FILE A LIED AGAINST YOUR PROPERTY 1.F THAT PERSON <br />OR: CONJPANY IS NOT PAID FOR THEIR. CONTRIBUT1ONS.. UNDCR MI.NNESOTA LAW, YOU HAVE THE <br />RIGHT TO PAY PERSONS WHO SUC'PLI.ED LABOR 0R-MATERIALS'FOR THE IMPROVEMENT DIRECTLY <br />AND DEDUCT THIS AMOUNT FROM OUR CONTRACT PRICE, OR WI.TIIHOLD THE AMOUNTS 1)UE <br />THEM FROM US:UNTIL ONE HUNDRED TWENTY DAYS (1220) AFTER COMP LETION OF TIDE <br />IMPROVEMENT UNLESS WE GIVE YOU A LEIN WAIVER SIGNED BY PERSONS WHO SIIPP.LIED.ANY <br />LABOR OR MATERIAL FOR THE, IMPROVEMENT AND WHO GAVE YOU TIMELY NOTICE" <br />DISCLOSURES: I is the responsibility of'Metro .Paying. to. have all cables; telephone. electrical, etc. located.prior tc any pork that is <br />completed. Any private -underground utilities not located by Gopher State arc the responsibility of the prope*t owncr. IE: Sprinkler lines <br />or heads —private lighting,.electrical lines, or underground fencing. Gopher State -One call 65.1=454-OOD2 <br />NOTE: Due to Minneseta.eliinatc conditions and variances in materials sac cannot guarantee against: <br />Asphalt is.being installed by a paver therefore thickness is an average and can vary from outer edges to center of pave; <br />Asphalt.- pavement cracking: or heaving, areas where hand .work. is required may be rocky: <br />Concrete — cracking, heaving, rock popping,:spalding from use of.chemicals to: get ice ofr. discoloration due that every batch is not exactly <br />the mme.color. Metro 11avin Inc. reserves the right tb.substitute material. if they.deem that sub -soil conditioris.are not in compliance.and <br />that if they feel that thealternative.material will be a better product:f'o.r your project. if paving is.done. back -to -bask tack coarmateriai.isrct. <br />necessary. <br />I'LHASE IN1'rIAl, AND RETURN L' TH-1 Is' & 2°dPAGE <br />E /M/F <br />Follow Up= <br />Sales <br />Sales = <br />Sales = <br />Customer initial Date <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.