_Cenera l Qualifications
<br />Allied BlacktopCompanyoffers a nine year euaranree on.hwurknianship and materials an all tropes ofwork [is Ied below, mdess clarified. Please coo firm scope ofw•ork
<br />de toiled on site plan to assure accuracy, AlUed Blacktop wiffCan file t nustomer.priur to construction. 1Vorkivill be donne in a continuous Fashion to ininfniiac (but not
<br />eliminate) customer inconvenience. Allied Blacktop Company encourages an. oir-site pre construction meeting iftraMc and staginz issues are a concern. AIIied Hincktop
<br />Company is notresponsible:for locatin%.rclia€riiigor re piacinp the following: Private ittit iU.es; Parking lot lizhta,.sprinkler.head, sprinkler lines, other non-loraled .items
<br />tit the construe lion. area. Allied Blacktop is not liable for asphalt areas broken by egnipment during construction process. Any deviation from original approved see lie of
<br />w orlrwill only be completed with customer approval (Written change order). Prior
<br />-lo the start ofwork, any obstructions inthe construction areashall be removed by
<br />awmir:Any delays:rmly result in additional charges. Construct -son outside of this contract resulting in damage to project area will not be covered under Allied warranty.
<br />Caren &gin ►►'arj ln£a} ninn and Oaali Rahn —
<br />While Allied Blacktop Company makes every C.fron to proiide fiiru pricing on:all our projects it iS.ithhpossibfe to. do so ern catch basin reconstructs iq that the repair wrirk.is under.gXaimd
<br />and cannot be specifically identified with.a surface inspection. No -work beyond. time. andtrimerials pricing will proceed without .verification and approval by the owner, Allied:Blacksop
<br />Company will cnlf for locales in advance ofconstruelion.
<br />Chin Scal iVarrnnty ]nfnrmation and Dnalitications:
<br />Qunlificalions: 'The one year guarantee does not include uneven wearing patients in drive lanes, high Inutile areas, cxposod.agg. regate aspball surfaces, and ottiv scraping- Exedaiiid
<br />silVdirt areas that are notable to be clearkil by. reasonable mcaris,: may not adhere properly.and restilI. in premanre wuanng Heavily shaded.arcas (ie- overhanging irces,. tall buildings, ctc.]
<br />may not properly.cmiz- Low areas on 41c:existing asphalt. surface That Bold watcr will Feat= the itfe cxpcctAllty of the seal.:5cal. coats generally do ;lot adhere wcl€ to epo.V striping
<br />materials- Foe Spring; following a chip seal applicativn,.aficr the snow: has atcltcLL tray- rcvwal loosened of grcgate in grass or areas where snow has been .pilcd. This is .typicalofa chip
<br />seal application'.And a second sweep in the spring should be considered at an additioual.charge (swecpmgdoes not inclynde dandscahic.arcas)-.1Viceds:and VC&C atinn rental a€ shall l e done
<br />byowner at least 1 week prior to: constritcsion, Any areas not acwssiblc to chip seaI.roller's will not be warrantied,: an¢ arc excluded fiain rho projiect.roll ess otherwise noted.
<br />Water protnoding from tlhc. asphalt or aijacerwareas thar.rwt into Ibeseti] coat area may afi-ectthe perfomtance.oftite seal coat and will not be iv arrantied:
<br />Additional charkcs.may:apply for remobiliration to:compleic seal coat.
<br />Sped ficatioriir All clip scals:e,Kperierwe oil blcctling and agrutgate trackinp_ The pick-up mveep:af excess. aggre.gate is generally done 4 to 9 weeks aficr applicatioll, ;Actual lot
<br />conditions, weather, and.other'factors will deIeraniate'actual SweCpin}'time ofaggregate, i'nIy MT]Zed oils alldW for gnlCkcrpick.up swecp:to ininimlZe'aggregate tracking.(genemlly2
<br />to 4 weeks)- Fog seals will ininimi?cregale tracking and ci! bleeding, : vllicd $lacktop Company uscs.tlhc.fitaiidmrd McLeod foiniula for gauging application rates: Dcvia(ionis from
<br />the furiltu€a at tlic.cuistomer's rcgiicatmay. result in a watr my waiver, While the %INOot specifkations allow for chip seals. to be eonstnlcted fxonh inlay' 15 to September 1. Late acasnrt:
<br />clip seals (starting �i gust IS tit) may axF ibit a highnri icidctice ofagg<cgatc sirippinj .and.oil. bicedint in subsequent seasons: Chip seals will lie I acid smtctum :integrity or correct heater
<br />flaw issues: Clrip seal material:amy overlap into curblines, this should be considered incidental to the conslinctiop.
<br />Applicvlion! Clean tbeasplialt.with a Mechanical rick -up style:street sw•eeper..Dispose orsvvicepings.offsite. Apply liquid asphalt ara:raicspccified on proposal with asphalt
<br />distributors equipped wiIll computerized rate of control. Apply cover aggregate al a mat specified on proposal. with a selrprope11ed compulciind chip spreader. Roll the cover a' =irate
<br />wit It elcvcnwhcO pnctnmatic rubber tiro rollers. Pick up swv6p excess:agiJcgate as per coring conditions,
<br />c• t _&kgp_ea1_W:rrranlylufurmafi0 sod _Qmil iflea tionsi
<br />Qualifications:-111c odeycar:guararne: dots oet include uneven wearing patterns in drive hones, high traffic areas, exposed aggrckale asphhalt slrrfaces, and. ploor scraping. Excessive
<br />sillldirt areas.tihat are not able. to be:elcanedby. reasomble rucans, may not adhere properly and result. imprcaiature wearing. Heavily.shaded areas (ic, ovcr6riging trees; tall buidilitigst etc.)
<br />may not properly ellre. Low areas oil the existing asphalt surficethat hold water will reduce (lie life eNpccumoy of llicseal-Seal coawgcrierally dp not adl.erc wAl to epoxy striping
<br />materials- All qualifications: specificalions. and applicatiorts listed in this section also apply to fog seals, TMffiq oil.lnncured seal cihaf$ may resull:in malcrial tracking (Allied not responsible
<br />fbr cleaning): Weeds and vegetation removal shall be done by owner at Ieast.I week prior.to conArtiction. Water prolniding from the asplialt or adiacei tareass.that nin into the seal
<br />cgln.area may affect (lie perfonnance.ofihe seal coat and will net be warrantied. Additional charges may apply for mmobilization to complete seal .colt,
<br />Specifica[ions: Scal coats mast bc:npplied.dui-inR.dayliylht floors to ensure proper applicatitin.and curing. Seal coals gcncmlh• dry in on u to :five hours. It takes scceral additional
<br />liours.for proper tire. Allowing traffic oil the product prionto proper cure will resultin prcmantro Wear• While seal coats. resurrace as well as a. rclgi•enatc, tine scaler. it will polish.offthe
<br />tap of cxposcd ap&mcgate and is drive lanes.. Scal coats can be w9cd over lhcorop oFcbip seals to enhance aggregate adhesion and minirriac apgregaic tracking and oil bleeding.
<br />Sealcaaling clone after Scptcmlier list. may have a high wildcncy.for excessive orprcminiue wearing and Will not be wtirrantied,
<br />Applicatiow.Clean asphalt surface to.rcmove &W and mote debris: Apply seal coat per r ianafach rer's specifications.
<br />Crack Seal Narranty Information and Qualifications:
<br />Qualifications: Tbc onc.year guarantee does not include previously sealed cracks that have failed and cannot be routed, Cracks sealed in parking areas are not warnunicd No warranty
<br />on dui-rotned.cracks:
<br />Specifications: Cracks wider than 1" should notlmay not bc crack sailed: Alligator, hairline and black cracks should not he sealed and .wilI nor he unless scaling these cracks is: requested by
<br />customer in writing. Alligator, Hairline and block cracks will not be routed or warrantied, Previously scaled cracks that have railed or recessed twill be tapped oilonly. (no rout). Weeds in cracks
<br />are to. be. spraycdlremoi ed by customer 2 weeks prior to consmactiom Cover paper will be used at contractors' discretion.
<br />Application: Rout azhd sea] the longitudinaland transverse "workinu' cracks that are '/," wide or Wider -up to I Rout cracks '.•.' by'r'.' Dry and clean the crack with hot air lance
<br />andlor forced air.:SCal crack with NIS'DOT spec hot crack seal material. h'laterial will. belhented in a me her equipped wit It a doable jacket boiling system to prevent: scorching.
<br />and ovcrhoaiing orthe.roatcrial. include.averband:as Tier 1v1NDOTspcci#icaions:?Apply proper cover as necessary percontractors' discretion:
<br />Pa telling and Paling Warranty lnfarmatinn and ( airl€ljofi2 ,gi
<br />Qualifications. Tlhe one ycar-guarantee does not include "frost;.vvorking.. ref]ectivc' crackss-or scrapes and othersin-hro daprage caused by plows, vehicles and equipment- Ali overlays
<br />will experience. frost cracks, working cracks, avid reflective cracks; Settling in trcncch patclics due to sub bate compactions will Dot be warrantied: NO warratity on drop and Intl patching.
<br />Late season.palch€ng & paving inayresull in rough mix and cold.seains.
<br />Specifications; Please fnfornnan Allied estimator or Of i;e.Staffafspecific water flow conccrris (ifam') prior to construction, Water flow issuCs may not be addressed unless identified
<br />by owner prier to bidding, and construction. Allied.Blacktop Company will shoot clevalions upon request or ifwatcr Rove issues are present. and identif ed prior to construction.. No
<br />guarantee on 160% water flow unless I,5! pitch can be establ ished and maintained. Asphall over]ays will 3nirrorexisting park ing1ot..Allied Blacktop.Company will call for locates. in
<br />advance ofcanstntctien. Allied. Blacktop Company wi11 not beresponsible for locating, repairing or replacing I€ie following: Private utilities, sprinkler ]head, sprinkler lines, ar othel•
<br />non-Iocated items in the construction area. Allied Blacktop Company is shot responsible for any baekfi11itif;; seed or sad unless.delailed on proposal.. Allied Blacktop Company is not
<br />responsible for.any, City, State, County, Federal, Watershed or other permitling unless detailed on proposal. Paiking, stripes etT'ected by asphall work will not be. re-siiiped unless quoted.
<br />This contractor, is not liable for asphalt areas broken by. c<luipment dunning construction process. Base. replacetncnt is not included in the .contiact unless noted oil the proposal. Ifbaw
<br />replacement is fomtd to. be necessary„replaccnncnt cost vvill.bc approved by owner prior to:contintting.tlhc.consTrLwtion process,
<br />APPI kaItoaf Asphalt paving application. detads to be noted on proposal if not listed in this section. Patch asphalt as specif cd an proposal by methods .nf remove andmplacc,:mill. mid
<br />patch.. skin patch, drop and roll or tit Bred patching or other specifed mclhor
<br />R n�tid rg I rg kwid eMmer, inill, or sawcut stmigjhl c ige..Renhovc existing,asphah and dispose off -sire, Stabilirc existing. base material- Inslall:asnhalt as per specified thickness
<br />And conipact,
<br />Mill and Patch Mill .eristiiig asphalt:to a specified depth. Clean milled stirface_ Apply CSS I H sack material. Ins fall asplialt as.per specified thickness and cortipact,
<br />Ski jEatcleC]can existing: asphalt surface, Apply.CSSIH tack .matcrial when applicable. Instal1.asphalt matetialand compact.
<br />Dina and_Rnil lnstall:asphall material and compact [Ado Warranly]-
<br />€nfran dPatch: Hcah existing asphalt surface. Add asphsitsarnd fines as •necessary rake to level mil compacl,
<br />Concrete 11'arranty [nf[Irmatian art d QnelllicatiMs,
<br />Vie One year gitarmitee does non:€nel tide "frost or hairline cracking, scrapes and other stirface' daniagc:eauscd by ploWS; Vehicles and equipincrit. or concrete spalding or rayd Ing'aL5 a
<br />rissidf of.iinproper safling..Alter October 151h cold --wealher charges wilI take effect A]liedis not msponsiblefor concmtq parking blocks danhag!H during the. remov'a1 prooss-
<br />Parking blocks can he replaced al.a price to be specified prior to insiallation.