Laserfiche WebLink
Date: 812512023 <br />Project: Gem lake. pond <br />QUOTE <br />To: Dustin Cesafsky <br />Dresel .Contracting, Inc. <br />24044 July <br />Ave <br />Chisago City, MN 55013 <br />Phone:. (551) 257-9469 <br />Pax: (651) 257-1Z 59 <br />Contact: Craig Meyer <br />I. North Location <br />a. Remove .the existing rip rap from the washed-out basin. <br />b.. Dry stack underground mortar`mix under F.ES for support <br />c. Regrade andblanket basin. <br />d:. Re -install existing rip rap into basin add additio.n.al as requested by owner. <br />2. East Location <br />a. Remove existing rip rap. <br />b. Regrade basin and install fabric. <br />c:. Reinstall rip ra.p as noted on plan.. <br />3. Southwest location <br />a. Grade. out 10.`.x 1W x V deep Basin in flow area from tralI <br />b. Install no.n-woven fabric into new basin. <br />c. Install (4) C1' CL 3.rip rap into new basin. <br />4. Quote includes. <br />a. .Seed, Fertilizer, and'.3N blanked in areas where vegetation is.torn up.. <br />L Seed to be used is a MNDOT 13:1 blend.. <br />Project Total: $40,382,91 <br />AdditionaHim estone CL3 rip rap-$198.62/TON <br />Includes: Insurance, tabor, Equipment, and materials as.::noted: <br />