Laserfiche WebLink
1. The applicant is:perm itted to utilize the existing barn on -site to house up. to two goats. <br />2. Proposed fancing shall be placed at minimum -five feet from. property lines to the south, unless <br />written consent. and approval .is received froin the neighboring property owner to place the fence <br />on the property line. <br />3. The. I U.P. shall expire in one calendar year from the.date of approval, so as to allow the. Planning <br />Commission to. review the request again to ensure the use is in colnpliance. with conditions of this <br />approval, and other city ordinances have been met. <br />4, Additional goats or farin animals an the site shall require. an amendment. to the iUP. <br />S. The applicant. is required to adhere to all applicable local, State; or Fadera I regulations. <br />G. The applicant is required to acquire any other applicable focal, State; or Federal .permits for this <br />request. <br />Including the conditions.of the Planning Commission listed below; <br />1. The homeowners fix th6.sin of the fenced in. area to be in compliance with the ordinance <br />2. The con ex. Incated on the property be removed <br />Councilmemher Lindner introduced a inotion to approve the renewal of the IU.P for two (2)'goats. based on <br />the condifions suggested for one (1) year, seconded by Councilmember Cacioppo. Voice vote taken, all <br />voted. yes, motion carried. <br />MS4 Ordinance Changes <br />The N1PCA MS4 Permit was reissued oil November 16, 2020 requiring additional changes to the City's <br />Construction Site. Stormwater Runoff Control and Post -Construction Starrnwater Management program. <br />Redlines toCity No. 131 (Consolidated Land Use) and 140. (Domestic.. An have been <br />submitted to. the Planning Commission and .City Council .for review.. <br />Ordinance No. I31 —Redlines to Sect:ion.22 and 29 <br />Updates to Ordinance No. 1 1.inctude: <br />Section 22, Erosion, Sediment, and Waste Controls and Stormwater Management <br />o The section title was revised to better align with the content.. <br />a Erosion, Sediment, and. W.aste:.Controls:. <br />• There are minor changas to the Criteriasub section to align with the. <br />MS4 permit. <br />• An Erosion and Sediment Control Plan subsection was created to <br />provide clarity to proposers on submittals to, the.. City for review. <br />❑ Stormwater: Management: <br />• Changes to the Regulation.subseel ion are proposed to align with the <br />MS4 permit requirements.. <br />• Changes to the Criteria subsection are pro posed to provide updated and <br />clear design standards for project proposers.. <br />• Changes to the Alternative Compliance subsection are. proposed to <br />align with the MS4 permit: requirements. <br />■ A Stormwater M.anagemerit Plan subsection.was. created to provide' <br />clarity'to proposers on submittals to the City for review, <br />o loot -applicable information was removed from thesection. <br />o Other minorrevisions to. Content..and formatting. <br />Section 29. Storm Sewer Use <br />c A subsection Far Salt and Deicer. Storage.Requirammts was added per the MS4 <br />p e rtn it ,require men ts. <br />Ordinance No. I.31 Appendix A - Definitions <br />An addition of a couple newdafinitions were added to: the current list.. <br />City of Gem .Lake.City Council Meeting Minules,Qetoher 17, 2023 3 i ' <br />