My WebLink
|
Help
|
About
|
Sign Out
Home
2023 10-10 PC PACKET
GemLake
>
PLANNING
>
PACKETS
>
2020 - 2029
>
2023
>
2023 10-10 PC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 8:50:37 AM
Creation date
12/3/2025 3:05:53 PM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
PLANNING PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
Show annotations
View images
View plain text
sECTION 22. ERpSIQN, SYDIMEN7', AND WASTE SOIL EROSION ONTROLS AND 5TORMWATER <br />MANAGEMENT <br />I. Erosion, Sediment, and %l aste emd Sedierenf ControIS. <br />1. Policy Statement. It is the policy of the City of Gem Lake to require the preparation and implementation of erosion <br />and sediment control plans to control runoff and erosion, to retain or control sediment on land during construction <br />activities, and to prevent the degradation of resources and the loss or damage or property due to erosionL-Rol <br />sedimentation. and waste. <br />2. Regulation. No person shall commence construction activities of I O,OW square feet or greater, unless granted a <br />variance, witham first obtaining a permit From the City that incorporates and approves an erosion and sediment <br />control plan for the activity, development or redevelopment, 1; ie i:::in::n ' eew i0 - W 11 .,.., 'ORol t •R •• <br />mAu R and V i e8F1 ...C,i.R HO- ! 111 e, fin I he plan shall be in con rormance with <br />the erosiar_ sediment, and waste uunnol standards established bk.,the Mmnesuta Pollution Conlrol Amck:s <br />NPDI- tiSUS C onstrucltoa Stnmiwater General Yerniit 1vlN[il IX1001 (L 5 W', [1cnni9 a`c nq%% constituter! and from <br />time to I me ainetldcdfhMPGn GE Re Fal tie....:. CO Fk;t» .. r .. wAp. __ ____ _ <br />3. Criteria. Erosion and sediment control plans and the construction activity shall comply with the following criteria: <br />Permit. <br />or exceedShe slandawj .t�andardti <br />ES SDS Construction Stonu Ater G ,uc <br />n;iFile to jmkLammndtNf <br />Formatted: indent: Left' 1.5", No bullets or <br />2._For certain construction activities, various other permits may also be required. The owner ofconstruction - <br />activity is responsible for obtaining any other required permits from watershed districts and other State, Formatted: Numbered + Level: 3 + Numbering Style: <br />Federal, or local governmental agencies having any authority over the work to be performed., 1, 2, 3, ... + Stan at: 1 + Alignment: Left + Aligned at <br />1.25" + Indent at 1.5" <br />Formatted: Font: (Default) Tmes New Roman. 10 pt <br />2 l'4e ••••irmA iiiScie 1i1101 A H k1l4h%l 0 h! R fit lhe 9 12 IR " """r""ee W!11 fje Nlsk?I:S{-ieneFnl <br />idl'IdiWIM!HUbFR4&q E3R Of Nei ee ..a•re....:....,:.... L.. {#IL'•pernti tee of epprr+vel <br />3 All on -site stormwater conveyance channels shall be designed and constructed to withstand the expected <br />velocity of flow From a 10-year frequency storm without erosion. <br />LFormatted: Font (Default] Times New Roman, 10 pt <br />Formatted: indent Left 11.5", Line spacing: Multiple <br />. 1.08 li, No bullets or numbering <br />City. <br />4. Exception. No permit or erosion and sediment control plan shall be required under this Section for the following <br />construction activities: <br />L Minor land disturbing activities such as home gardens, repairs and maintenance work. <br />2. Construction, installation and maintenance of individual sewage treatment systems (1STS) other than those <br />on steep slopes, on riparian lots within a Shoreland District or in a bluff impact nine. <br />3. Installation of any fence, sign, telephone or electric poles, or other kinds of posts or poles- <br />ClpladedAligns( 17. 2018 Gem lake C msohdnred 1 a d the OnhmmrceNa 131— Page 107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.