Laserfiche WebLink
Historical Changes <br />Ordinance <br />Description <br />Enactment <br />43K Zoning Ordinance <br />Section 15.2.2 (2-4) <br />19 April 2023 <br />(incorporated into 131) <br />2. A total enrollment of not less than twenty-five (25) nor more than <br />e hundred fifty ( cm one hundred eighty two (182); <br />3. A maximum of one -hundred .�.= 0) eighty two (182) "full - <br />day equivalent" students with a full -day* defined as ten (10) hours; <br />4. The "full -day equivalent" shall be calculated by adding together the <br />total number of students present during each hour of the "full -day" <br />of school. This total shall not exceed '� 1,820, which is 4-1$ 182 <br />students times 10 hours. <br />43K Zoning Ordinance <br />Section 15.6 (1-2) <br />19 April 2023 <br />(incorporated into 131) <br />1. The total lot coverage of all buildings and other structures shall not <br />exceed fr€teethirty (tS%) (30%) percent. <br />2. The minimum open space requirement for any proposed use shall <br />be twenty f•°-�O (20%) percent, including green areas not <br />covered by buildings, parking lots, access roads, storage areas or <br />other areas covered by impervious surfaces. <br />43K Zoning Ordinance <br />Section 22. Erosion, Sediment, and Waste Controls and Stormwater <br />17 October 2023 <br />(incorporated into 131) <br />Management <br />o The section title was revised to better align with the content. <br />o Erosion, Sediment, and Waste Controls: <br />■ There are minor changes to the Criteria subsection to align <br />with the MS4 permit. <br />■ An Erosion and Sediment Control Plan subsection was <br />created to provide clarity to proposers on submittals to the <br />City for review. <br />o Stormwater Management: <br />■ Changes to the Regulation subsection are proposed to <br />align with the MS4 permit requirements. <br />■ Changes to the Criteria subsection are proposed to provide <br />updated and clear design standards for project proposers. <br />■ Changes to the Alternative Compliance subsection are <br />proposed to align with the MS4 permit requirements. <br />■ A Stormwater Management Plan subsection was created to <br />provide clarity to proposers on submittals to the City for <br />review. <br />o Not -applicable information was removed from the section. <br />o Other minor revisions to content and formatting. <br />43K Zoning Ordinance <br />Section 29. Storm Sewer Use <br />17 October 2023 <br />(incorporated into 131) <br />o A subsection for Salt and Deicer Storage Requirements was added <br />per the MS4 permit requirements <br />Zoning Maps Updated <br />Figures la and lb (Zoning Maps) were updated, previous version was last <br />14 March 2024 <br />u dated in 2017. Updates were to the symbology and parcel lines. <br />Building Type 15a and <br />Section 9.6 <br />17 September 2024 <br />Automotive Dealership Use <br />o Figure 15a `Automotive Dealership' building type template <br />(incorporated into 131) <br />o Figure 17 amended to include `Automotive Dealership' as a <br />permitted use in the Automotive Dealership building type template. <br />Updated January 2025 — Gem Lake Consolidated Land Use Ordinance No. 131 158 <br />