Laserfiche WebLink
without residential components. This subzone will accommodate a variety of activities and services within <br />easy walking distance from homes throughout the District, supporting daily convenience shopping and <br />personal service needs, and also providing opportunities for public gathering and social contact. <br />4. Neighborhood Center. Intended for the most urban conditions within all of the shown mixed use areas. <br />The mixture of land uses emphasizes ground -floor retail with offices and residential/rental above (as <br />market acceptance matures) and structures providing commercial space for medium and large —sized <br />retailers. Street frontages throughout this subzone should be pedestrian -oriented, and the public space <br />should be defined by placing building facades at the edge of the sidewalk. Neighborhood Center land that <br />abuts other subzones on the north and west sides will be carefully planned to ensure lower -density <br />buildings. Where developers insert a minimum 200-foot buffer at existing non -Gateway residential <br />properties, or especially along the extreme eastern edge of this subzone, the City may allow as a <br />conditional use multifamily housing, including townhomes, row houses, or apartment buildings three <br />stories or less in height. <br />2. Generally Applicable Regulations. <br />1. Relationship to other portions of this Ordinance and other City Ordinances. The requirements of this Section <br />may conflict with or duplicate some portions of this Ordinance. Any such conflict, when it relates to the use of land <br />in the Gateway District, shall be resolved in favor of the language in this Section. All other provisions of this <br />Ordinance apply within the Gateway "G" District, including provisions for Planned Unit Development (PUD) and <br />Institutional Overlay. PUD or institutional overlay proposals may be used in combination with or in place of the <br />regulations and procedures set forth in this Section. <br />All other Gem Lake ordinances which relate to the construction of buildings and use of land included in the <br />Consolidated Land Use Ordinance and other land used Ordinances (including but not limited to the Adult Use <br />Ordinance, Building Code Adoption, and Pawnbroker Ordinance) apply within the Gateway District. <br />2. Administration, Conditional Uses, Variance, and Appeal. <br />1. The Building Type standards are intended to be employed and used to entitle the construction of a <br />building upon land in the same manner that listing a use as "permitted" entitled land in other Zones <br />defined by this Ordinance. The processing of conditional use permits, variances, amendments, platted <br />subdivisions and other land use applications which may necessarily accompany an application for building <br />approval in the Gateway District shall be processed simultaneously with the review of the Gateway <br />District proposal, whenever possible. <br />All new construction, remodeling or expansion (except for the remodeling or expansion of single-family <br />detached dwellings) within the Gateway District requires a Zoning Compliance Permit. The Zoning <br />Compliance Permit is indefinite in duration and the entitlements stated on the permit shall run with the <br />land. A Zoning Compliance Permit is granted after determination that the proposal complies with all <br />applicable standards set forth within this Section (Thoroughfare Standards, Civic Space Standards, <br />Building Type Standards, Parking, and Design Standards). As set forth below, the final approval for the <br />Zoning Compliance Permit will come from the City Council for proposals which require Council approval <br />in some form (such as a platted subdivision or conditional use permit), and the Zoning Administrator for <br />proposals which do not otherwise require Council review (such as single buildings or minor subdivisions <br />without variances). <br />For the purpose of providing administrative review and processing of development proposals within the <br />Gateway District, the City Council hereby appoints the Zoning Administrator to serve as the primary point <br />of contact between the City and applicants for zoning approval. Upon receipt of an application for land <br />use in the Gateway District, the Zoning Administrator shall ensure that the application is complete within <br />five (5) business days of receipt. If the application is not complete, the Zoning Administrator shall return <br />all materials with an explanation of what is required to make the application complete. When the <br />application is determined to be complete, the Zoning Administrator shall distribute copies of all submitted <br />documents to the City's appointed consultants in architecture, engineering and planning. The Zoning <br />Administrator shall obtain written comment on the application from each consultant before the scheduled <br />Planning Commission review of the application, or before making an administrative approval where <br />authorized. <br />4. If a City consultant identifies a failure to meet the standards of this Section, the Zoning Administrator may <br />not administratively approve a permit for the proposal. The Zoning Administrator shall meet with the <br />Updated January 2025 — Gem Lake Consolidated Land Use Ordinance No. 131 22 <br />