Laserfiche WebLink
Section 2 <br />Electrical Permits <br />Homeowners and Electrical Contractors: Complete an electrical permit form available from the Building hnspections Division. Add $1.00 for State surcharge to the <br />total cost of each permit. The fee is the total of the listed fees or the total number of inspection trips x $50.00, whichever is greater. <br />Residential panel replacement is $110.00, sub panel $50.00 <br />New service of power supply is: <br />0 to 300 Amp $55.00 <br />400 Amp $71.00 <br />Add $16.00 for each additional 100 Amps <br />Minimum Fee: <br />Minimum permit fee is $50.00 plus $1.00 State surcharge. This is for one <br />inspection only. Minimum fee for rough -in and final inspection is $100.00 <br />plus $1.00 State surcharge. <br />Circuits and Feeders: <br />0 to 100 Amp $9.00 <br />101 to 200 Amp $15.00 <br />Add $6.00 for each additional 100 Amps <br />Maximum Fee: <br />Maximum fee for single family dwelling or townhouse not over 200 Amps <br />(No max if service is over 200 Amps) is $200.00 plus $1.00 State surcharge. <br />Maximum of 2 rough-in's and 1 final inspection. (Failed inspections are an <br />additional $50.00 each) <br />Apartment Buildings: <br />Fee per unit of an apartment or condominium complex is $90.00. This does not cover service, unit feeders or house panels. <br />Swimming Pools and Hot Tubs: <br />Additions, Remodels or Basement Finishes: <br />Residential Accessory Structures: <br />Traffic Signals: <br />Street and Parking Lot Lights: <br />Transformers and Generators: <br />Retrofit Lighting: <br />Sign Transformer or Driver: <br />Low voltage fire alarm, low voltage heating and <br />air conditioning control wiring: <br />Re -Inspection Fee in addition to all other fees: <br />Solar fees: <br />Okw to 5kw $90.00 <br />10.lkw to 2 kw $225.00 <br />30.1kw to 40kw $375.00 <br />$100.00 plus circuits at $9.00 each. This includes 2 inspections <br />$100.00 this includes up to 10 circuits and 2 inspections <br />The greater of $55.00 for panel plus $9.00 per circuit of $100.00 for 2 inspections <br />$8.00 per each standard <br />$5.00 per each standard <br />$5.00 up to 10kva, $45.00 1 lkva to 74kva, $60.00 75kva to 299kva, over 299kva is $165.00 <br />$0.85 cents per fixture <br />$9.00 per transformer <br />$0.85 cents per device <br />$50.00 <br />5.1 kw to l Okw $150.00 <br />20.1kw to 30kw $300.00 <br />40.1kw and larger $375.00 plus $25.00 for each additional IOkw <br />Electronic inspection fee for these items only: <br />Furnace, air conditioning, bath fan, fireplace or receptacle for water heater vent is $40.00. <br />Refunds must be requested in writing. No refund unless more than the minimum fee. Refund are minus the cities 20% handling fee. <br />THE PERMIT FEE IS DOUBLED IF THE WORK STARTS BEFORE THE PERMIT IS ISSUED. <br />Minimum fee permits expire in 6 months. <br />Permits over the minimum fee and up to $250.00 expire in 1 year. <br />Commercial Electrical Fees: The fee is 1% of the valuation with a minimum of $125.00 per trip plus the state surcharge of .0005 x valuation <br />Description I <br />Fee Calculation _ Permit Fee <br />Re -Inspection fee (in addition to all other fees) <br />$50.00 <br />Investigative fee (working without permit) the fee is doubled <br />Refunds issued only for permits over: <br />$100.00 <br />Solar fees for PV System <br />0-5,000 watts <br />$90.00 <br />> 5,000 watts to 10,000 watts <br />$150.00 <br />> 10,000 watts to 20,000 watts <br />$225.00 <br />> 20,000 watts to 30,000 watts <br />$300.00 <br />> 30,000 watts to 40,000 watts <br />$375.00 <br />Additional increments of 10,000 watts <br />$25 (for each additional $10k increment) <br />Updated January 1, 2025 <br />