My WebLink
|
Help
|
About
|
Sign Out
Home
Ordinance No. 135 City of Gem Lake Fees & Charges with Fee Schedule Attached 2025
GemLake
>
CITY COUNCIL
>
ORDINANCES CURRENT
>
Ordinance No. 135 City of Gem Lake Fees & Charges with Fee Schedule Attached 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2025 3:36:32 PM
Creation date
12/3/2025 3:18:43 PM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
ORDINANCES
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
Show annotations
View images
View plain text
Section 6 <br />Septic Permits <br />Residential Septic Permit Fees <br />Permit Type <br />Permit Fee <br />Comments <br />Abandon Subsurface Sewage Treatment Systems SSTS <br />$125.00 <br />Install New Subsurface Sewage Treatment Systems SSTS <br />$300.00 <br />Repair Subsurface Sewage Treatment Systems SSTS <br />$75.00 <br />Replace Subsurface Sewage Treatment Systems SSTS <br />$125.00 <br />ISTS Septic Inspection(performed annually) <br />$45.00 <br />Effective l/l/2025 <br />ISTS Re -Inspection <br />$80.00 <br />Section 7 <br />Sewer & Water Permits <br />Residential Sewer & Water Permit Fees <br />Permits are based on the fees below, plus $1.00 state surcharge. <br />Permit Type IL <br />Permit Fee <br />Comments <br />New Outside Sewer Line <br />$75.00 <br />New Outside Water & Sewer Line <br />$125.00 <br />New Outside Water Line <br />$75.00 <br />Open Cut of Road to Tap Main <br />$75.00 <br />Repair Outside Sewer Line <br />$75.00 <br />Repair Outside Water & Sewer Line <br />$125.00 <br />Repair Outside Water Line <br />$75.00 <br />Sewer Tap <br />$175.00 <br />Sewer & Water Tap <br />$225.00 <br />Sewer Re -Inspection Fee <br />$80.00 <br />Water Tap <br />$175.00 <br />Commercial Sewer & Water Permit Fees <br />Fee is 1 % of the valuation with a minimum of $125.00 and a surcharge of .0005 x valuation <br />Sewer and Water Connection Fees <br />Buildings or dwellings existing or constructed in the City of Gem Lake must connect to the municipal water and sanitary sewer system so long as it is reasonably <br />available. Commercial buildings must connect within one (1) year and residential buildings must connect within ten (10) years from the time a connection is available to <br />any such property. <br />Metropolitan Council Sewer Availability Charge (SAC) units and fees are established by the Metropolitan Council per state statute MN 473.517. Prior to connecting to <br />public utilities, the owner or representative must pay the following fees: <br />Sewer Connection Fees <br />Dwelling Type <br />Fees <br />Comments <br />Single Family Dwellings <br />$75.00 <br />Plus SAC per unit Sewer Changeover Permit from Septic or New Construction <br />Two -Family Dwellings <br />$75.00 <br />Plus SAC per unit Sewer Changeover Permit from Septic or New Construction <br />Sewer Availability Charge SAC - City <br />$1,000.00 per unit <br />As established by the City <br />Sewer Availability Charge SAC — Met Council <br />$2,485.00 <br />As established by the Metropolitan Council <br />Water Connection Fees <br />Dwelling Type <br />Single Family Dwellings <br />Fees <br />$75.00 <br />Comments <br />Plus WAC per unit Water Changeover Permit from Well or New Construction <br />Two -Family Dwellings <br />$75.00 <br />Plus WAC per unit Water Changeover Permit from Well or New Construction <br />Water Availability Charge AC — Gem Lake <br />$1,500.00 per unit <br />As established by the City <br />Commercial Sewer & Water Connection Fees <br />Fee is 1 % of the valuation with a minimum of $125.00 and a surcharge of .0005 x valuation, plus SAC and WAC per unit <br />Section 8 <br />Stormwater <br />Permit T e <br />Permit Fee <br />Comments <br />Public — Linear Projects <br />$100.00 <br />Per mile <br />Public — Stormwater Pond <br />$100.00 <br />Residential — New Home Construction <br />$450.00 <br />Residential — Addition Remodel excavation less than 1,000 cubic feet <br />$100.00 <br />Commercial less than 5 acres <br />$1,500.00 <br />Commercial more than 5 acres <br />$2,000.00 <br />Updated January 1, 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.