Laserfiche WebLink
Variances that pertain to the standards and requirements of the State of Minnesota must be approved by the affected <br />State Agency pursuant to the requirements of the State Agency. <br />Section 21. Permit Required. It is unlawful for any person to construct, install, modify, replace, or operate a SSTS <br />without the appropriate permit from the Department. The issuing of any permit, variance, or conditional use under <br />the provision of this Ordinance shall not absolve the applicant of responsibility to obtain any other required permit. <br />Section 22. Construction Permit. A construction permit shall be obtained by the property owner or an agent of the <br />property owner from the Department prior to the installation, construction, replacement, modification, alteration, <br />repair, or capacity expansion of a SSTS. The purpose of this permit is to ensure that the proposed construction <br />activity is site, designed, and constructed in accordance with the provisions of this Ordinance by appropriately <br />certified and/or licensed practitioner(s). <br />1. Activities Requiring a Construction Permit. A construction permit is required for installation of a new <br />SSTS, for replacement of an existing SSTS, or for any repair or replacement of components that will alter <br />the original function of the system, change the treatment capacity of the system, change the location of the <br />system, or otherwise change the original system's design, layout, or function. <br />2. Activities Not Requiring a Permit. A construction permit is not required for minor repairs or <br />replacements of system components that do not alter the original function of the system, change the <br />treatment capacity of the system, change the location of the system, or otherwise change the original <br />system's design, layout, or function. <br />3. Construction Permit Required to Obtain Building Permit. For any property on which a SSTS permit is <br />required, approval and issuance of a valid SSTS Construction Permit must be obtained before a building or <br />land use permit may be issued by the Department. <br />4. Conformance to Prevailing Requirements. Any activity involving an existing system that requires a <br />Construction Permit shall require that the entire system be brought into compliance with this Ordinance. <br />5. Permit Application Requirements. Construction Permit applications shall be made on forms provided by <br />the Department and signed by the applicant and appropriately Certified practitioner including the <br />practitioner's certification number and date of expiration. The applications shall include the documents <br />listed in items 1 through 8 below: <br />1. The Correct address and legal description of the property where the proposed work is to take place. <br />2. The name and contact information (mailing address, telephone number, and email address) of the <br />property owner. <br />3. The name, contact information, and MPCA License Number of the SSTS Designer responsible for <br />the system design. <br />4. Site Evaluation Report as described in Minnesota Rules, Chapter 7080.1730 and on the <br />Department's permit application. <br />5. Design Report described in Minnesota Rules, Chapter 7080.2430 and on the Department's permit <br />application. <br />6. Site Plan(s) for the proposed system. <br />7. Management Plan as described in Minnesota Rules, Chapter 7082.0600. <br />8. Permit Fee. <br />Ordinance No. 67D Individual Septic Systems 11 <br />