Laserfiche WebLink
Luther Cadillac Project Staff Report Apr[[ 12, 2M <br />Gem Lake Planning Commission Page 5 <br />4]. Publi'c Safety and Health <br />The proposed project :shouId not have impacts on the safety or health of the public, provided the <br />development is. built to code and adheres. to condition s. plated on this CUP. <br />5] Area Aesthetics. <br />The site is unique in that a majority of the site is not within the city limits; there are no buildings or <br />structures within the. Gem Lake side that would add or subtract frorn the aesthetics of the area. <br />Since the site is within the gateway zone, the commission could request additional landscaping or <br />screening if there is concerns with #he.aesthetics of the parking lot. <br />6) Economic Impact on the Entire Area <br />Development of a currently vacant site would result in new tax.base for the:city. Development of <br />the.site could potentially spur additional .development within the gateway area. <br />7) Consistency with.the Comprehensive Municipal Plan <br />The Comprehensive Plan identifies the gateway zone as permitting a wide variety of uses,.most <br />of`which are. more mixed -use in. nature.. Provided that zoning requirements and other municipal <br />Ordinances are met, the proposed project would be. consistent with. the Comprehensive Plan, as <br />the proposed use of the site by the applicaht. would not prevent adjacent site from being <br />developed in accordance with the Comprehensive Plan and the Consolidated. Land Use <br />❑rdinance. <br />8) Anticipate.d Duration of the Conditional or Interim Use <br />As a conditional use, the proposed .structure would be intended to.be used for a considerable <br />amount of time. <br />Section 17.5.9(S} <br />1) Compliance with.:all zoning andother regulations as mayotnerwise be applicable; <br />Ppart from .the requested. variance, the proposed request is.compiiant with local zoning <br />requirements, and would be required to comply with all other applicable local, State, .or Federal. <br />regulations, -Any connections of the site. to city utilities would have to follow applicable <br />requirements. <br />2) the date or the event that Will terminate the use can be identified with certainty; <br />As a conditional use, this requirement. is NiA. <br />3) The existence of the Conditional or Interim Use will not impose additional costs on the public if it <br />becomes necessary for the public to fake the property in the future; <br />In the event of.the public taking the property in the future; the presence.of the proposed. parking <br />lot should not impose additional costs onto the public. <br />4) The user agrees to any conditions of approval associated. with the approval of the Conditional or <br />Interim Use Permit by the City Council. <br />In discussions with the applicant, the Planner noted that conditions could be made by the: city as <br />part of the approval. <br />7 <br />