Laserfiche WebLink
2. The.applicant is required to acquire a building permit from the city forthe proposed structure and: to submit <br />a grading and erosion control plan to city staff for review prior to .issuance of a building permit, so as to <br />ensure drainage issues are mitigated. <br />3. The applicant would not be allowed to turn this structure into a secondary residence on the.property and <br />would remodel the existing. nearby shed to:itiatch the siding o.f the new garage. within one'year:of garage <br />completion. <br />44.. Any connections of the.proposed accessory structure to city utilities would ad.liere.to applicable city <br />requirements. <br />5. The -applicant is required to adhere to all applicable local, State or l:ederal regulations. <br />f. The applicant is required to acquire any other applicable local, State.or Federal permits for this request. <br />New Business <br />Luther Cadilhic Project Request and. Anticipated Re.=application <br />An application. fora new car dealership that spanned.:two cities {Gent Cake and Vadnais Heights} was.approv.ed in <br />20.19. Due .to the pandemic and other factors, the project:had to be. put on hold foraperiod of time. Luther Cadillac <br />now wishes to restart thC.. project with slightly revised. plans. The .projact involved a car dealership and large parking <br />lot.,ne building would be entirely in Vadnais.Heights. The north end of the. parking lot would be.iit Gem Lake, <br />Revised plans were "shown to the Planning Commission: by Steve Sabraski of Land Form Company, who is <br />managing the.. construction planning, The new plans show a smaller sales building that is set back further from <br />Highway 61 and `the access road. The parking lot is essentially the same,. although revisions.a[[Qwed for theelinihiatioii or the retaining wall and the installation of more landscape screening on the north end of thie:project. <br />Commission memhers. asked several questions; but generally regarded the:pIans as essentially the same as. I[to se <br />approved three years. ago Far that portion of the project that is in Gem Lake. Sabrmki added that Vadnais Heights <br />had already approved the revisions and that -Luther was ready to start in March .or whenever Gem Lake -could <br />Provide their official stamp of approval. He "added that watershed approval had .already been obtained. The <br />application will. be sent into the city in the rooting week. It will be the subject of public hearing on April. 12, with <br />council discussion and potential approval on April 19. <br />2020. Gern La Ice. Comprehensive Plan <br />A'finaI draft of the Gem Lake Comprehensive Plan was submitted to. ilia Metropolitan Council approximately one <br />year ago, following a public }tearing, [n Decemher.of 2021; a.letter was: received back from the Metropolitan <br />Council asking for additional changes: The consultant working on this project for the City,. did not feel the changes <br />were significant and could .be coniplcted fairly quickly..0he or two of the requested. changes involved the City's <br />engineering firm. SEH is currently.seeking cIArifcation. from the Metropolitan Council on one or two of the requests <br />for. revision. <br />❑nce-the final version is re -submitted to. the ivletropoIitan Council, Artig-SwomIey an d. C urn m i ngs disetissed having. <br />a joint informational meeting. on the -plan. This: informational meeting. could be part of the April or May City:Council <br />meeting. April is.preferred if the tinting can be managed. Artig-Swonilcy.said she. would get in touch with the <br />consultant who helped write the plan and see:if he is available on Apri[ 19 <br />Future: Meetings <br />City Council Mecting; APri1 12.., 2022. at Heritagc.l:hall.. This meeting wiII include a public hearing on the. Luther <br />Cadillac applicati.on.. <br />Adjournment <br />Being there no further business, fallowing a rootioit from Patrick; seconded by FarreII, the meeting adjourned at 9:05 <br />p. M. <br />Respectfirll): submillecl GretehM 4reig=Swonde3p <br />City DI'(;cm Lake Planning Cammiss1on Meeting'Minutes March 8, 2022 2 1 f' u g <br />