My WebLink
|
Help
|
About
|
Sign Out
Home
2025 12-02 PC Packet
GemLake
>
PLANNING
>
PACKETS
>
2020 - 2029
>
2025
>
2025 12-02 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 8:43:29 AM
Creation date
12/4/2025 8:41:12 AM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
PLANNING PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
Show annotations
View images
View plain text
Type II 24-hr 2-year Rainfall=2.79"25018 Existing Hydro <br /> Printed 10/29/2025Prepared by Land & Resource Consulting Inc <br />Page 7HydroCAD® 10.20-7a s/n 12643 © 2025 HydroCAD Software Solutions LLC <br />Summary for Subcatchment 3S: Offsite North to Driveway Culvert <br />Runoff = 1.13 cfs @ 11.98 hrs, Volume= 2,656 cf, Depth= 2.21" <br /> Routed to Reach 3R : Driveway Culvert <br />Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs <br />Type II 24-hr 2-year Rainfall=2.79" <br />Area (sf) CN Description <br />2,800 98 Roofs, HSG C <br />10,000 96 Gravel surface, HSG C <br />1,600 74 >75% Grass cover, Good, HSG C <br />14,400 Weighted Average <br />11,600 80.56% Pervious Area <br />2,800 19.44% Impervious Area <br />Tc Length Slope Velocity Capacity Description <br />(min) (feet) (ft/ft) (ft/sec) (cfs) <br />7.0 Direct Entry, <br />Subcatchment 3S: Offsite North to Driveway Culvert <br />Runoff <br />Hydrograph <br />Time (hours) <br />727068666462605856545250484644424038363432302826242220181614121086420 <br />Fl <br />o <br />w <br /> <br /> <br />( <br />c <br />f <br />s <br />) <br />1 <br />0 <br />Type II 24-hr <br />2-year Rainfall=2.79" <br />Runoff Area=14,400 sf <br />Runoff Volume=2,656 cf <br />Runoff Depth=2.21" <br />Tc=7.0 min <br />CN=WQ <br /> 1.13 cfs
The URL can be used to link to this page
Your browser does not support the video tag.