My WebLink
|
Help
|
About
|
Sign Out
Home
2024 09-10 PC PACKET
GemLake
>
PLANNING
>
PACKETS
>
2020 - 2029
>
2024
>
2024 09-10 PC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 8:14:52 AM
Creation date
12/9/2025 8:11:33 AM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
PLANNING PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
Show annotations
View images
View plain text
Barnett Kia – 3610 Hwy 61 <br />Gem Lake Planning Commission 9/10/24 <br />September 4, 2024 <br />Page 3 <br /> <br /> <br />EVALUATION OF REQUESTS <br /> <br />Lot Line Adjustment <br /> <br />Ordinance Requirements <br />The City’s Consolidated Land Use Ordinance (Ord. No. 131) defines a Subdivision as “… the division of an area, <br />parcel, or tract of land into two (2) or more lots or parcels, for the purpose of transfer of ownership or building <br />development that will require the creation of streets and roads, except for those resulting from court orders, or the <br />adjustment of lot lines by the relocation of a common boundary . The term includes re-subdivision and when <br />appropriate to the context, shall relate to the process of sub-dividing or to the land subdivided.” <br /> <br />The city has historically reviewed lot line adjustments as Minor Subdivisions. Section 25.6 of Ord. No. 131 covers <br />the process. <br /> <br />The Request <br />The applicant is requesting to adjust the lot line to accommodate the entrance from Highway 61. The subject lot <br />(south/on the right) is currently 5.16 acres, and the abutting lot (3700 Highway 61, located to the north/on the left <br />on the survey) is 4.17 acres. The proposed lot line would result in the subject lot being 5.56 acres and the <br />abutting lot being 3.96 acres. <br /> <br />City Engineering staff have requested new drainage and utility easements be established (minimum 10 feet in <br />width) to align with the storm system and newly adjusted lot line. An access easement for the 3700 property to <br />enter in an out of the existing access drive will also need to be established. <br /> <br /> Figure 2: Excerpt from C-103 of the submittal, existing lot lines shown in red, proposed lot line shown in blue. <br /> <br />Zoning Ordinance Amendment <br /> <br />Current Ordinance <br />In 2007, the city conducted a visioning study and master planning of the area now known as the Gateway District <br />– the ‘Gateway and Village Centers Vision Corridor Master Plan’. The results of this planning effort were included <br />in the City’s 2030 and 2040 Comprehensive Plans. The requirements of the Gateway District were first adopted in <br />2014 as Ord. No. 107B and are now located within Ord. No. 131. The Gateway District requirements are intended <br />to allow for development and redevelopment of the properties within this zone. The Gateway District emphasizes <br />creative mixed-use and commercial development and provides a transition into residential neighborhoods by <br />becoming less dense. This ‘tiering’ of development is done through four sub-zones. The subject property is
The URL can be used to link to this page
Your browser does not support the video tag.