My WebLink
|
Help
|
About
|
Sign Out
Home
2024 11-12 PC PACKET
GemLake
>
PLANNING
>
PACKETS
>
2020 - 2029
>
2024
>
2024 11-12 PC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 8:13:01 AM
Creation date
12/9/2025 8:12:13 AM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
PLANNING PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
Show annotations
View images
View plain text
19 <br /> <br />3. Installation inspections shall be made at each installation, prior to any work having been covered <br />by backfill. Work that is backfilled prior to the required inspection may be ordered to be <br />uncovered whenever necessary to determine compliance. <br />4. The licensed installer shall be responsible for notifying the department a minimum of twenty <br />fourtwenty-four (24) hours before the time the work is ready for inspection or re-inspection. <br />5. When, upon inspection, any part of the system is determined not to be in compliance with this <br />division, written notice shall be provided by the Department indicating the deficiency and the <br />required corrections. <br />6. Noted deficiencies shall be properly corrected and re-inspected before and other work on <br />the project is continued. <br />7. SSTS found not to be in compliance with Minnesota Rules, Chapter 7080.1500, Subd. 4A <br />or Chapter 7081.0080, Subd. 3 must be repaired or replaced within ten (I010) months. <br />8. No system shall be placed or replaced in service until final inspection and approval of the <br />installation. <br />9. The contractor, upon completion of the installation, shall file with the department as built <br />drawings indicating the location of system components dimensioned from a permanent reference <br />point. <br />10. A minimum of three construction inspections are required for mounds in accordance with the <br />following: <br />1. When the original soil under the mound has been roughened, but prior to placement of <br />the sand fill. Enough of the proposed sand fill must be present to be viewed. <br />2. After placement of rock and piping, but prior to cover. <br />3. Final inspection, wheninspection when the job is completed. <br />11. SSTS that are determined to have operation or monitoring deficiencies must immediately be <br />maintained, monitoredmonitored, or otherwise managed according to the operating permit. <br />12. A Certificate of Compliance for new SSTS construction or replacement shall be issued by the <br />Department if the Department has reasonable assurance that the system was built in accordance <br />with the applicable requirements as specified in the construction permit. <br />13. The Certificate of Compliance must include a certified statement by the qQualified <br />Eemployee service provider or qualified employee who conducted the inspection that the <br />SSTS is or is not in compliance with the Ordinance requirements. If the SSTS is <br />determined not to be in compliance with the applicable requirements, a Notic e of <br />Noncompliance must be issued to the owner which includes a statement specifying those <br />Ordinance provisions with which the SSTS does not comply. <br />14. The Certificate of Compliance or Notice of Noncompliance must be submitted to the Department <br />no later than fifteen (15) calendar days after the date the inspection was performed. The <br />Department shall deliver the Certificate of Compliance or Notice of Noncompliance to the owner <br />or the owner's agent within fifteen (15) calendar days of receipt from the qQualified <br />Eemployeeservice provider or qualified employee. No SSTS shall be placed into operation until a <br />valid ce1tificated of compliance has been issued. <br />15. Certificates of Compliance for new construction or replacement shall remain valid for five (5)
The URL can be used to link to this page
Your browser does not support the video tag.