Laserfiche WebLink
CITY GOVERNMENT & FACILITIES <br />The city currently operates from donated space. in .the Mayor's,. Clerk's, Treasurer's and Planning Commissioner's <br />homes. All of the Gem Lake government.meetings as well as general and special elections are currently held in space donated <br />by the business 1 commercial owners in the city. <br />11. Should the city plan on:constructing a"city hall" or comr6diity'`buMig where it would hold meetings and elections <br />and from which it would. operate? <br />[ 11118.8.%. ] Yes [51 /73.00A 1 No ( 517.3%a 1 No Answer <br />if "YES", where would you like to.see such abuilding located? <br />A. [ 08 / 11.6% ] In the. residential area of the city? <br />$. [08 / 1.1.6% ] In the commercial ./ business area of the. -city?. <br />C. 150172.5%) No Answer <br />12. Gent l;.ake.n4W provides essential services such as police, fire & paramedic, curbside recycling; budding inspection <br />su <br />aiid-code -enforcement which conmes more ihan 60% of our annual budget (your tax dollars)• Each of these <br />services kprovided by an outside source with -whom the City contracts: Are you satisfied with ct=. ntservices? <br />( 62.1899%01. Yes [ 4 / &B% ] No [.3 / 4.3%. ] .No Answer <br />If -"NO", what improvements'are deeded?. <br />A. improve recycling promotion <br />B. Improve. building code enforcement <br />C: Improved traffic controls - speed and quantity <br />D. Enforce dog laws <br />.E. More.police. <br />13. Gem lake currently operates a sanitary sewer system that serves 21 residences and 22 businesses. Expansion of <br />this system would cost between $60 and $80 per front footof the property it serves and this cost would be assessed <br />to each benefitted property owner. Do you believe Gem Lake should: consider expanding the,sewer system to serve. <br />more areas of the city? <br />('19/27.5%] Yes [46/66.7%]No [4/5.8%0]NoApxwer <br />If "YES", when do you feel this expansion will be necessary to serve your needs? <br />[04105.8% 1 Within 1.year 112 / 17.4% 1 Within 5 years <br />[ 04 / 05.8% ] Within 10 years [49 / 71.0% ] No Answer <br />If "YES", where do you feel the expansion will be necessary? <br />A_ . ( 03104.3% 1 Scheuneman Road area <br />B. [ 64105.8% ] Goose Lake Road area <br />C. [01101;5% ] All others <br />If. "YES", why do you feel the expansion will be..necessary? <br />A. [ 08.7°/u 1 Old inadequate: septic systems <br />B. [ 01 / 01.5% 1 Commercial. waste abatement <br />Increased density if allowed <br />For those who want it <br />More:costly to wait <br />.Business district improvement <br />Safer drinking water <br />Improve property values <br />14. Gem 'Lake eunmtly has no public water system. Installation of a public water system would cost between S50 and <br />$70 per fist foot of the. property.it serves.and this. cost would be assessed; to each benefitted property owner. Do <br />you -believe there is a need: in your area for a. public water systeri7 <br />[ 14 lid.361..1 Yes [ 53.176:8"/0..] No [ 2 / 2.9"/o .1 No Answer <br />If "YES", when:do you feel this system will be necessary to: serve your needs? <br />1.04105A% 1 Within l year 106108.7%: ] Within 5 years [ 01 / 01.5% ] Within 10 years <br />[ 58184:1%0 1. No Answer <br />If "YES". where do you -feel the expansion will bcn6oetMrY9* <br />A, [ O I./ 01:5% ] Business district Entire city NW Corner <br />5 <br />