My WebLink
|
Help
|
About
|
Sign Out
Home
2021 11-19 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2021
>
2021 11-19 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2025 12:46:38 PM
Creation date
12/29/2025 12:44:17 PM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
CITY COUNCIL PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
Show annotations
View images
View plain text
Mayor and.. Council, City.of Gein Lake <br />Municipal Water Supply Feaslbillty:Study <br />October 13, 2021 <br />Page 2 <br />• Review of water availability: This will include- a review of the source and storage capacities of <br />neighboring communities and their water appropriations.. <br />Data collection and review with neighboring communities is anticipated to be performed via email_ <br />It is anticipated that this effort will require one (1). meeting, which is proposed to be held virtually <br />1. Project kick-off meeting with City representatives and SEH staff to evaluate City needs, <br />establish options to be explored for a municipal water supply, and collect needed materials and <br />data. <br />A model of proposed Gem Cake water distribution system options will be developed using <br />WaterGEMS's', a pipe network program developed by Bentley®, to analyze pressures, flow rates, and <br />fire flows for each municipal water supply option. Specifically, items will include: <br />• Building a model with existing and proposed water distribution system piping, elevation data, <br />and demand data. <br />• Evaluation of proposed interconnections, pipes, and pipe sizing. <br />Develop modeling results maps and figures comparing system pressures, I flows, and fire flows <br />for each municipal water supply option, <br />T as1 a • Water Syitoin CDs• s-b� uction anci Pliauirjg Analysis <br />For each municipal water supply option the required system facilities will be evaluated. Specifically, <br />items evaluated will include: <br />• .Available land and street access. _ <br />• Required facilities such as piping, service connections, valves, hydrants, and metering. <br />• Probable costs of construction. This will include estimated probable costs of construction for the <br />required improvements for each option. Estimated costs will be a Class 4 Feasibility Estimate <br />as defined: by. AACE cost estimate classification system, with an expected accuracy range of - <br />30% to + 50% based on project definition (up to 15% complete design) level analysis. <br />Task 4 — Feasibil1ty Study Rrport <br />Following completion of the above tasks, an updated Municipal Water Supply Feasibility Study report <br />will. be developed presenting the results of our exploration and analysis of a municipal water supply for <br />the City of Gem Lake, <br />It is anticipated that this effort will require two (2) meetings. with City representatives, which are <br />proposed to be held at City Council meetings. <br />1. Presentation of Draft Municipal Water Supply Feasibility Study - SEH will present initial <br />findings, answer questions; and gather Inputfrom the City Council, <br />2. Presentation of Final Municipal Water Supply Feasibility Study — SEH: will present the: finaI <br />report to the City. Council, Prior to the second.meeting the SEH team will incorporate City input <br />for the final report. <br />Project Tearn <br />Key.team members proposed for delivery of this project include the following: <br />Richard Parr, PE (MN) Project Manager. Richard is a professional engineer with over twenty-six <br />(26)years of consulting experience,. Including delivery of a broad range of water and wastewater <br />projects, His experience includes planning, design, permitting, and construction contract administration. <br />He has extensive background in water distribution system modeling, and distribution system and <br />collection system design and rehabilitation. Richard will serve as project manager. <br />
The URL can be used to link to this page
Your browser does not support the video tag.