Laserfiche WebLink
A <br />SEH <br />Application for Payment <br />(Unit Price Contract) <br />No. 1 <br />Eng. Project No.: GEMLK;161958 Location: Gera Lake, Minnesota <br />Contractor Dresel Contracting Contract Date September 29, 2021 <br />24044 .July Ave. <br />Chitsago. City, MN 55013 Contract.Amount $' :118,045.31 <br />Contract for Storm Sewer Improvements and Restoration <br />Application Date 11:24.2021 For Period Ending 11.24.2021 <br />Item No. Item Unit Quantity (to Date uantity Unit Price Total Price <br />1 <br />MOBILIZATION <br />LS <br />1 <br />1 <br />$9,030.00 <br />$9,030.00 <br />2 <br />CLEARING AND GRUBBING <br />LS <br />1 <br />1 <br />$2,400.00 <br />$2,400:00 <br />3 <br />REMOVE SEWER PIPE (STORM) <br />LF <br />150 <br />150 <br />$12.64 <br />$1,896.00 . <br />4 <br />SALVAGE BOULDER WALL <br />LF <br />80 <br />80 <br />$14.25 <br />$1,140.00 <br />5 <br />CONNECT TO EXISTING STORM <br />SEWER <br />EA <br />1 <br />1 <br />$1,140.00 <br />$1.;"140,00 <br />6 <br />COMMON EMBANKMENT (CV) <br />CY <br />500 <br />66 <br />$29,16. <br />$1,92.4.66 <br />7 <br />CONSTRUCT DRAINAGE <br />STRUCTURE DESIGN 60-4020 <br />LF <br />41 <br />41 <br />$776.05 . <br />$31;818.05 <br />8 <br />CASTING ASSEMBLY <br />LF <br />4 <br />4 <br />$622.50 <br />$2,490.00 <br />.0 <br />3.6" PIPE APRON W/ GRATE <br />EA <br />1. <br />1 <br />$4;836.00 <br />K836.00 <br />10 <br />30" RC PIPE SEWER CLASS III <br />LF <br />134 <br />134 <br />$220.30 <br />$29,520.20 <br />11. <br />36" RC PIPE SEWER CLASS III <br />LF <br />14 <br />14 <br />$510A <br />$7,153.86 <br />12 <br />INSTALL BOULDER WALL <br />LF <br />80 <br />80 <br />$21.38 <br />$1,71.0.40 <br />13 <br />BOULEVARD TOPSOIL BORROW <br />(CY) (CV) <br />CY <br />75 <br />75 <br />$32.00 <br />$2,400.00 <br />14 <br />SEED <br />LBS <br />30 <br />50 <br />$3:50 <br />$180.00 <br />15 <br />FLEXTERRA HYDROMULCH <br />LBS <br />750 <br />0: <br />$3.60 <br />16 <br />RIP RAP CL III <br />CY <br />15 <br />15 <br />$160.80 <br />$4412.00 <br />17 <br />EROSION CONTROL.BLANKETS <br />CATEGORY 3N. <br />SY <br />360 <br />1100 <br />$7.53. <br />K350.77 <br />Total Contract Am..ount <br />$1081401.84. <br />Short Elliott Hendrickson Inca Page. 1 of 2 <br />