Laserfiche WebLink
Section 4 <br />Plumbing Permits <br />Hot Water Boiler. Permit: <br />$100.00 <br />Open Cut of Road to Tap Main: <br />$60:00 <br />Plumbina Permit: <br />$25.00Y1 st fixture <br />$10.60 each additional fixture <br />$100.00 City Water Permit <br />Sentic Svstem: <br />$250.00 <br />Sewer .Changeover Permit From Sentic: <br />$250.001system converted <br />Sewer Connection .Permit - New Construction: <br />$200.00 plus SAC unit <br />Sewer Line Reaair Permit: <br />$60.00 <br />Sewer Re -Inspection Fee: <br />ff $90.00l1-iour (] !lour minimum) <br />F. <br />Sewer Tap: <br />$60.00 <br />Updated 1429/2021 g <br />;:r <br />