Laserfiche WebLink
ITEM #ITEM DESCRIPTION / PROJECT TYPE 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 NOTES <br />REPLACE OUTDATED COVERS = 22 $4,500 <br />REPAIR MH INVERTS = 6 $8,000 <br />ADJUST & REPLACE RINGS/CASTINGS = 22 $30,000 <br />9 STORM SEWER MH'S $2,000 <br />10 STORM CULVERTS $2,000 <br />11 MISC STREET OVERLAY / PATCHING $200,000 <br />PROJECTS <br />12 EXTEND WATER ‐ SCHEUNEMAN RD S. $400,000 <br />INCLUDES ROADWAY REPLACEMENT AND IMPROVEMENTS, AND STORM  <br />SEWER ADDITIONS W/POND <br />13 EXTEND WATER ‐ SCHEUNEMAN RD N.$1,000,000 <br />INCLUDES CONNECTION UNDER TH61 AND LOOP BACK TO WBL AT OTTER  <br />LAKE RD <br />14 EXTEND WATER TO VILLAS OF GEM LAKE $15,000 COST FOR WATER UPSIZING BY DEVELOPER <br />15 EXTEND WATER TO BIG FOX/LITTLE FOX $1,000,000 <br />16 EXTEND WATER DOWN INTO HOFFMAN CORNERS $500,000 <br />17 EXTEND SEWER & WATER INTO NE DISTRICT $800,000 EXTENSION INTO AREA NEAR AND AROUND CITY HALL <br />18 EXTEND SEWER TO BIG FOX/LITTLE FOX $1,000,000 <br />19 REPLACE SEWER IN HOFFMAN CORNERS $500,000 <br />20 STORM WATER MANAGEMENT FEATURES $40,000 $40,000 $60,000 $60,000 <br />STORM WATER MANGEMENT PONDS OR BASINS TRIGGERED BY  <br />WATERSHED DIST REQUIREMENTS FOR ABOVE PROJECTS <br />21 RECONSTRUCT HAVEN & TESSIER $1,000,000 NEW PAVEMENT, CURB & GUTTER,  AND UTILITIES <br />22 RECONSTRUCT BIG FOX & LITTLE FOX $1,200,000 NEW PAVEMENT, CURB & GUTTER,  AND UTILITIES <br />TOTALS $498,450 $51,000 $88,500 $87,600 $983,000 $1,248,000 $86,155 $1,094,500 $1,111,000 $3,365,355