My WebLink
|
Help
|
About
|
Sign Out
Home
2022 COMPREHENSIVE PLAN
GemLake
>
PLANNING
>
COMPREHENSIVE PLANS
>
2022 COMPREHENSIVE PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 10:31:43 AM
Creation date
12/30/2025 10:29:51 AM
Metadata
Fields
Template:
Planning & Zoning
Code
PLAZ 00300
Document
COMPREHENSIVE PLAN
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
Show annotations
View images
View plain text
Section 5.3 Need for Changeover Permit <br /> <br />Section 5.3.1 When a request is made for a residential sewer Connection Permit, where <br />an Individual Sewage Treatment System (IST S) is now being used, a Changeover Permit <br />shall also be required. Both the Connection Permit and the Changeover Permit shall be <br />issued at the same time. This Changeover Permit is to ascertain that the existing <br />Individual Sewage Treatment System is properly disconnected and sealed. The <br />Changeover Permit Fee shall be as set annually by resolution of the City Council at its <br />first meeting in January. <br /> <br />Section 5.4 Additional Requirements For Connection Permits <br /> <br />Section 5.4.1 The following conditions shall also be certified by the City Clerk for each <br />connection request, before a Connection permit is issued: <br /> <br />a) That the lot or tract of land to which the connection will be made has been <br />assessed for the cost of construction of the Municipal sanitary sewer system; and <br /> <br />b) If no assessment has been levied for such construction costs, the proceedings of <br />levying such assessment have been or will be completed in due course; or <br /> <br />c) If no assessment has been levied and no assessment proceedings will be <br />completed in due course, that a sum equal to the portion of the cost of <br />constructing said sanitary sewer main, which would be assessable against said lot <br />or tract, has been paid to the City; or <br /> <br />d) If an assessment for the construction cost of the sewer has been levied, which <br />included a UNIT connection charge for each structure then in existence, that a <br />monetary sum equal to such unit connection charge has been paid for structures <br />not in existence at the time of the assessment. The amount of the UNIT <br />assessment charge shall be as established in the assessment proceedings, or if not <br />so established for any particular type of structure, the UNIT connection charge <br />shall be based on the following formula, using a single family residential dwelling <br />as one UNIT. <br />Section 5.4.1 d) TABLE II <br />TYPE OF STRUCTURE # UNITS <br />Each Single Family Dwelling 1 Unit(s) <br />Each Hotel Or Motel Unit 1/3 Unit(s) <br />One Mobile Home Unit Or Apartment Unit ½ Unit(s) <br />Industrial Or Commercial structures <br />(per 1,000 s.f. area) <br />½ Unit(s) <br />Minimum 2 Unit(s) <br /> <br />Section 5.4.2 If no certification can be issued by the City Clerk, no permit to connect to <br />the Municipal Sanitary Sewer System shall be issued, unless the applicant agrees to pay
The URL can be used to link to this page
Your browser does not support the video tag.