My WebLink
|
Help
|
About
|
Sign Out
Home
2026 01-06 PC Packet
GemLake
>
PLANNING
>
PACKETS
>
2020 - 2029
>
2026
>
2026 01-06 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2025 1:22:25 PM
Creation date
12/31/2025 1:22:06 PM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
PLANNING COMMISSION PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
Show annotations
View images
View plain text
4 <br /> <br />6. Wetlands <br />No wetlands, water bodies, streams, or drainage features will be impacted. <br />There will be no excavation, grading, building expansion, or impervious surface changes. <br />Thus, wetlands and 100-year elevation analysis do not apply to this project. <br />This category is applicable only to confirm no impact from the proposed shed/greenhouse use. <br />7. Existing Trees & Landscaping <br /> No trees over 6 inches in diameter will be removed. <br /> No shrubs or landscaping features will be altered. <br /> All operations take place within existing structures and paved surfaces. <br />This category is applicable only to confirm no impact from the proposed shed/greenhouse use. <br />8. Adjacent Land Uses <br />The area surrounding the site includes: <br /> Horticultural operations <br /> Commercial and service businesses <br /> Retail uses <br /> Residential areas at a greater distance <br />The proposed greenhouse cultivation and accessory shed align closely with the property’s <br />longstanding horticultural use and do not alter the visual or environmental character of the <br />neighborhood. <br />9. Topography & Grading <br /> No grading or land alterations are required. <br /> The garage and greenhouses remain in their existing placements. <br />This category is applicable only to confirm no impact from the proposed shed/greenhouse use. <br />10. Schedule <br />No construction is planned. <br />Operational preparation includes: <br /> Interior cleaning and setup of the greenhouses (30-60 days) <br /> Interior reorganization of the existing garage for secure storage (30-60 days) <br /> Minor security improvements, such as new locks, lights, and security cameras (30- <br />60 days) <br /> Approval from OCM (60-90 days) <br />No exterior work or construction machinery is required.
The URL can be used to link to this page
Your browser does not support the video tag.