My WebLink
|
Help
|
About
|
Sign Out
Home
2019 03-05 PC PACKET
GemLake
>
PLANNING
>
PACKETS
>
2010 - 2019
>
2019
>
2019 03-05 PC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 3:17:29 PM
Creation date
1/5/2026 8:57:21 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
PC MEETING
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
Show annotations
View images
View plain text
2. Planning Commission; (1A Tuesday of the month at 7:00 p.m. at Heritage Hall. Zoning Administrator <br />schedules publichearing plate and provides information to the 'White Bear Press for time and place of <br />hearing). <br />(Date of Planning Commission meeting) <br />3. .City Councils (3�O Tuesday of the month.at 7:00 p.m., Heritage Hall, 420Q Otter Lake Road.. <br />(Dateof the City Council meeting) <br />Standards: <br />The City Council will approve. a Conditional Use Permit:only.if the following facts are established: <br />I. There will be no -detraction from the appearance .of adjacentproperties, or Town. as a whole. <br />2. There will not be aesthetic incompatibility. <br />3. There will.riot be aural incompatibility.(noise), <br />4. There will not be damage. to vegetation. <br />5.. Traf£ic.patterns;will.not be negatively affected. <br />6.. There is no unnecessary loss of..existingnatural features. <br />7. Will not cause soil erosion. <br />S. Will not increase flood potential. <br />9. The. proposal is consistent with Comprehensive Plan and complies with other Ordinances. <br />It is. the policy of the City of. Gem Lake that -III identifiable costs associated with Conditional Use Permits <br />within: the City shall be the sole responsibility of the owner of said property. The costs shall include; but are <br />not limited to the. following: <br />City planning.review casts (reports; meetings, site review); <br />Bngineerin& review. costs; <br />• Legal costs (preparation of hearing notices,.Iegal research, certification costs); <br />■ Publication costs (notice of hearing); <br />• Reapportionment of assessments (engineers report); <br />• Mailings and.Ownership Reports (ownership encumbrance). <br />I'rior..to.the final hearing or deterzxiination by the City Council, all, City expenses shall be paid by the owner. <br />Subsequent expenses riot paid at the time of. final hearing or determination by the City (due to billings by <br />consultants, etc.) shall.be paid within 30 days upon. receipt of a billing from the City. The application will be <br />considered incomplete until all costs are paid to the City: <br />Signature of Applicant (s) <br />f <br />Date <br />be completed by the. City: <br />Date request received:. <br />Conditional Use Permit. (other than a PUD $75.00 plus $200 escrow. for review) paid: <br />Date Application Complete: 11lIS:oonafE9vrsa1 use permit <br />
The URL can be used to link to this page
Your browser does not support the video tag.